Show Job Controls
Bid Cobra

ERATH US0377 (6359-92-001)

Items: 38

County: ERATH
Length: N/A
Highway: US0377
District: FORT WORTH
Control Number: 6359-92-001
DBE Goal: N/A
Project: RMC - 635992001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $333,293.50
Date: 05/05/2021 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL INSTALLATION AND REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$333,293.50
$256,645.00
Over/Under Est: -23% -$76,648.50
$308,140.00
Over/Under Est: -7.55% -$25,153.50
Amt Left: 20.06% $51,495.00
Over/Under Est: -5.59% -$18,616.50
Amt Left: 22.61% $58,032.00
Delta: -2.12% -$6,537.00
Over/Under Est: 2.06% $6,868.50
Amt Left: 32.54% $83,517.00
Delta: -8.10% -$25,485.00
Over/Under Est: 9.28% $30,931.50
Amt Left: 41.92% $107,580.00
Delta: -7.07% -$24,063.00

Bid Items & Bid Tabulations

38 Total 0 of 38
ERATH  |  US0377  |  FORT WORTH  |  6359-92-001  |  05/05/2021  |  $333,293.50  |  RMC - 635992001  |  GUARDRAIL INSTL AND REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
VANN/ELLI, INC.
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC
ELITE CASTLE RESOURCES LLC
SJ&J CONSTRUCTION, LLC
RETROFIT RAIL (TY T631)
LF 100.000 $150.000 $50.000 $160.000 $100.000 $150.000 $80.000
MOBILIZATION (CALLOUT)
EA 12.000 $642.000 $100.000 $100.000 $1.000 $1.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 2.000 $513.750 $100.000 $500.000 $500.000 $2,500.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $22.000 $75.000 $30.000 $29.000 $42.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,107.000 $3,500.000 $2,500.000 $1,800.000 $2,500.000 $2,000.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 500.000 $8.500 $5.000 $5.000 $7.000 $10.000 $9.000
SHORT RADIUS
LF 150.000 $24.000 $15.000 $40.000 $47.000 $25.000 $40.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $545.000 $250.000 $1,000.000 $970.000 $500.000 $625.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,118.000 $2,000.000 $1,300.000 $1,400.000 $3,500.000 $850.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 1.000 $725.000 $2,000.000 $2,500.000 $1,400.000 $2,500.000 $600.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.300 $10.000 $3.000 $3.000 $5.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $140.000 $100.000 $200.000 $500.000 $500.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,700.000 $2,500.000 $3,400.000 $2,400.000 $3,000.000 $2,900.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $514.000 $1,000.000 $800.000 $600.000 $500.000 $450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $150.000 $500.000 $100.000 $200.000 $500.000 $200.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $1,543.000 $2,500.000 $1.000 $2,600.000 $3,250.000 $4,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $16.000 $10.000 $17.500 $12.000 $20.000 $17.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 150.000 $24.000 $30.000 $10.000 $27.000 $5.000 $40.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 200.000 $24.000 $30.000 $10.000 $30.000 $5.000 $30.000
RAISE RAIL ELEMENT
LF 100.000 $6.000 $5.000 $9.600 $10.000 $10.000 $2.500
REALIGN EXISTING RAIL
LF 750.000 $8.000 $2.000 $5.000 $7.000 $5.000 $9.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $48.000 $30.000 $70.000 $60.000 $50.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $47.000 $30.000 $80.000 $75.000 $60.000 $50.000
REALIGN POSTS
EA 100.000 $15.000 $10.000 $20.000 $7.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 500.000 $14.000 $1.000 $25.000 $10.000 $20.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $20.000 $15.000 $15.000 $20.000 $20.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $65.000 $40.000 $30.000 $75.000 $80.000 $61.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $200.000 $10.000 $50.000 $75.000 $50.000 $60.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $2,750.000 $6,500.000 $3,500.000 $2,800.000 $3,250.000 $3,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $914.000 $500.000 $25.000 $1,600.000 $800.000 $875.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $94.000 $10.000 $10.000 $250.000 $100.000 $140.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $79.000 $1.000 $10.000 $35.000 $50.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 30.000 $62.000 $1.000 $10.000 $35.000 $50.000 $65.000
REPLACE SGT STRUT
EA 10.000 $52.000 $1.000 $10.000 $35.000 $50.000 $65.000
REPLACE SGT OBJECT MARKER
EA 25.000 $35.000 $1.000 $40.000 $25.000 $50.000 $22.000
REPAIR STEEL POST WITH BASE PLATE
EA 50.000 $300.000 $200.000 $350.000 $200.000 $250.000 $275.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1.000 $97.000 $100.000 $200.000 $500.000 $600.000 $100.000
TMA (STATIONARY)
DAY 100.000 $342.000 $1.000 $200.000 $100.000 $1.000 $100.000
Totals: $333,293.500 $256,645.000 $308,140.000 $314,677.000 $340,162.000 $364,225.000