PREPARING ROW
|
STA
|
506.000
|
$2,500.000
|
$550.000
|
$3,100.000
|
$3,179.100
|
$400.000
|
$760.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
14,973.000
|
$8.000
|
$3.250
|
$4.000
|
$5.400
|
$3.000
|
$4.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
27,833.000
|
$4.000
|
$17.000
|
$7.000
|
$11.400
|
$18.000
|
$11.250
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
17,929.000
|
$8.000
|
$9.000
|
$12.000
|
$10.100
|
$8.000
|
$12.100
|
|
|
EROSION CONTROL COMPOST (2")
|
SY
|
21,170.000
|
$2.500
|
$1.750
|
$3.000
|
$1.300
|
$1.300
|
$2.700
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
89,765.000
|
$1.450
|
$1.000
|
$2.000
|
$2.100
|
$1.000
|
$1.150
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
110,473.000
|
$0.500
|
$0.200
|
$0.150
|
$0.100
|
$0.150
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
4,565.000
|
$12.000
|
$20.000
|
$9.000
|
$13.800
|
$15.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
3,695.000
|
$2.000
|
$1.500
|
$1.000
|
$1.000
|
$1.200
|
$2.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
22,721.000
|
$45.000
|
$33.000
|
$35.000
|
$58.000
|
$68.800
|
$52.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
28,021.000
|
$3.650
|
$4.500
|
$3.000
|
$3.300
|
$5.000
|
$5.100
|
|
|
ASPH (AC-20XP)
|
GAL
|
99,287.000
|
$3.300
|
$3.500
|
$5.000
|
$3.400
|
$4.200
|
$3.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,579.000
|
$73.000
|
$110.000
|
$85.000
|
$83.200
|
$100.000
|
$115.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
15,428.000
|
$69.000
|
$91.000
|
$90.000
|
$79.200
|
$103.000
|
$78.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
49,997.000
|
$95.000
|
$112.000
|
$120.000
|
$107.800
|
$120.000
|
$102.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
10,000.000
|
$36.000
|
$63.000
|
$40.000
|
$58.800
|
$64.000
|
$66.500
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
190,273.000
|
$2.500
|
$1.600
|
$3.000
|
$0.700
|
$2.000
|
$1.850
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
168.000
|
$50.000
|
$160.000
|
$75.000
|
$117.700
|
$130.000
|
$190.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
400.000
|
$5.000
|
$30.000
|
$1.000
|
$1.500
|
$22.000
|
$21.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,516.000
|
$13.200
|
$34.000
|
$25.000
|
$20.200
|
$52.000
|
$52.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
100.000
|
$373.000
|
$485.000
|
$330.000
|
$466.600
|
$460.000
|
$500.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
25.000
|
$470.000
|
$600.000
|
$400.000
|
$555.400
|
$540.000
|
$650.000
|
|
|
CL B CONC (FLUME)
|
CY
|
16.000
|
$400.000
|
$750.000
|
$600.000
|
$397.300
|
$680.000
|
$700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
303.000
|
$430.000
|
$625.000
|
$360.000
|
$631.300
|
$650.000
|
$625.000
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
5.000
|
$571.030
|
$700.000
|
$360.000
|
$639.400
|
$900.000
|
$925.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2.000
|
$100.000
|
$300.000
|
$150.000
|
$182.700
|
$130.000
|
$135.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
224.000
|
$125.000
|
$100.000
|
$175.000
|
$110.900
|
$220.000
|
$215.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
294.050
|
$430.000
|
$685.000
|
$440.000
|
$687.900
|
$690.000
|
$715.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
190.000
|
$25.000
|
$60.000
|
$5.000
|
$39.300
|
$62.000
|
$50.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
202.000
|
$450.000
|
$610.000
|
$700.000
|
$612.500
|
$900.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,653.000
|
$46.000
|
$50.000
|
$60.000
|
$61.400
|
$53.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
703.000
|
$58.000
|
$65.000
|
$72.000
|
$75.400
|
$110.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
528.000
|
$66.000
|
$85.000
|
$95.000
|
$104.700
|
$150.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
28.000
|
$75.000
|
$170.000
|
$170.000
|
$171.600
|
$200.000
|
$200.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
30.000
|
$400.000
|
$450.000
|
$450.000
|
$427.600
|
$370.000
|
$375.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,500.000
|
$5,000.000
|
$7,500.000
|
$4,646.900
|
$6,900.000
|
$6,800.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$144,000.000
|
$235,000.000
|
$65,000.000
|
$236,903.900
|
$185,000.000
|
$190,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$20,500.000
|
$37,000.000
|
$20,000.000
|
$36,649.100
|
$32,000.000
|
$32,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$35,000.000
|
$33,000.000
|
$24,000.000
|
$32,672.800
|
$27,000.000
|
$29,000.000
|
|
|
SET (TY I) (24 IN) (3: 1) (C)
|
EA
|
2.000
|
$1,580.000
|
$1,200.000
|
$4,200.000
|
$4,668.800
|
$3,700.000
|
$3,700.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
11.000
|
$1,240.000
|
$1,300.000
|
$1,320.000
|
$1,311.200
|
$4,700.000
|
$4,700.000
|
|
|
SET (TY I) (30 IN) (3: 1) (C)
|
EA
|
7.000
|
$1,000.000
|
$1,925.000
|
$5,400.000
|
$5,364.200
|
$5,800.000
|
$5,700.000
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
12.000
|
$900.000
|
$2,200.000
|
$2,650.000
|
$4,966.800
|
$6,800.000
|
$6,800.000
|
|
|
SET (TY I) (42 IN) (3: 1) (C)
|
EA
|
1.000
|
$5,500.000
|
$3,550.000
|
$5,000.000
|
$6,258.200
|
$9,000.000
|
$8,800.000
|
|
|
SET (TY I) (42 IN) (4: 1) (C)
|
EA
|
1.000
|
$3,100.000
|
$4,100.000
|
$5,000.000
|
$6,258.200
|
$10,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$900.000
|
$750.000
|
$750.000
|
$887.000
|
$1,000.000
|
$950.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
56.000
|
$796.000
|
$900.000
|
$850.000
|
$876.200
|
$1,000.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,000.000
|
$1,200.000
|
$1,400.000
|
$1,485.700
|
$1,300.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$4,000.000
|
$2,500.000
|
$1,800.000
|
$2,062.500
|
$1,600.000
|
$1,600.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
27.000
|
$1,100.000
|
$2,100.000
|
$1,500.000
|
$1,237.700
|
$1,300.000
|
$1,300.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$750.000
|
$3,500.000
|
$1,100.000
|
$1,060.100
|
$1,300.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
442.000
|
$16.000
|
$25.000
|
$15.000
|
$16.000
|
$32.000
|
$32.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
317.000
|
$56.000
|
$80.000
|
$55.000
|
$55.000
|
$130.000
|
$135.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,089,226.500
|
$1,300,000.000
|
$1,580,000.000
|
$1,870,000.000
|
$1,200,000.000
|
$1,733,140.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$6,800.000
|
$16,500.000
|
$7,500.000
|
$5,768.200
|
$8,000.000
|
$85,110.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
1,409.000
|
$32.000
|
$30.000
|
$50.000
|
$25.500
|
$52.000
|
$30.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,409.000
|
$6.500
|
$11.000
|
$10.000
|
$9.400
|
$5.000
|
$12.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,184.000
|
$26.000
|
$22.000
|
$20.000
|
$20.000
|
$22.000
|
$26.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,184.000
|
$10.000
|
$9.000
|
$8.000
|
$7.600
|
$5.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,990.000
|
$2.000
|
$3.500
|
$2.500
|
$2.800
|
$2.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,990.000
|
$0.500
|
$0.500
|
$1.000
|
$0.500
|
$0.600
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,036.000
|
$1.500
|
$4.000
|
$4.000
|
$3.000
|
$3.000
|
$7.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,036.000
|
$0.920
|
$1.000
|
$1.000
|
$0.900
|
$0.500
|
$1.800
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
160.000
|
$72.000
|
$150.000
|
$75.000
|
$213.100
|
$110.000
|
$205.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,650.000
|
$33.000
|
$85.000
|
$45.000
|
$41.100
|
$110.000
|
$103.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,020.000
|
$3.400
|
$16.000
|
$7.000
|
$3.900
|
$15.000
|
$22.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,650.000
|
$2.000
|
$19.000
|
$9.000
|
$6.200
|
$15.000
|
$26.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
400.000
|
$50.000
|
$250.000
|
$80.000
|
$108.500
|
$150.000
|
$109.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
790.000
|
$28.000
|
$102.000
|
$50.000
|
$60.700
|
$94.000
|
$107.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
603.000
|
$20.000
|
$62.000
|
$50.000
|
$46.400
|
$57.000
|
$58.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,038.000
|
$13.000
|
$25.000
|
$20.000
|
$5.400
|
$34.000
|
$37.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
139,507.000
|
$0.130
|
$0.220
|
$0.150
|
$0.100
|
$0.200
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
70,331.000
|
$0.180
|
$0.350
|
$0.150
|
$0.100
|
$0.200
|
$0.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,050.000
|
$20.900
|
$22.000
|
$22.000
|
$18.600
|
$18.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,850.000
|
$2,000.000
|
$1,700.000
|
$1,498.000
|
$1,300.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
298.000
|
$3.600
|
$3.000
|
$3.000
|
$2.800
|
$3.000
|
$5.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$2,500.000
|
$2,700.000
|
$2,700.000
|
$2,660.200
|
$3,200.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,685.000
|
$2,500.000
|
$1,400.000
|
$1,420.500
|
$1,500.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
5.000
|
$525.000
|
$2,000.000
|
$1,100.000
|
$878.100
|
$1,000.000
|
$1,550.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$880.000
|
$2,300.000
|
$900.000
|
$723.200
|
$850.000
|
$1,550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$9,910.000
|
$12,000.000
|
$8,500.000
|
$8,058.200
|
$9,000.000
|
$12,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
5.000
|
$255.000
|
$235.000
|
$250.000
|
$232.400
|
$260.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
3.000
|
$300.000
|
$300.000
|
$215.000
|
$242.800
|
$370.000
|
$300.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
35.000
|
$8.410
|
$33.000
|
$9.000
|
$12.200
|
$12.000
|
$15.500
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
360.000
|
$13.270
|
$35.000
|
$12.000
|
$18.900
|
$18.000
|
$20.250
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
260.000
|
$39.600
|
$55.000
|
$20.000
|
$33.300
|
$32.000
|
$31.000
|
|
|
CONDT (RM) (2")
|
LF
|
4.000
|
$37.410
|
$70.000
|
$20.000
|
$33.300
|
$32.000
|
$26.000
|
|
|
CONDT (RM) (3")
|
LF
|
16.000
|
$40.690
|
$80.000
|
$30.000
|
$72.200
|
$70.000
|
$31.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
453.000
|
$1.990
|
$1.500
|
$1.500
|
$1.700
|
$1.600
|
$2.100
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
906.000
|
$3.000
|
$2.000
|
$1.500
|
$1.700
|
$1.600
|
$2.100
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
149.000
|
$2.850
|
$2.000
|
$1.750
|
$1.900
|
$1.800
|
$2.550
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
432.000
|
$2.720
|
$2.000
|
$2.000
|
$1.900
|
$1.800
|
$3.050
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)SP(U)
|
EA
|
1.000
|
$5,755.000
|
$6,000.000
|
$7,500.000
|
$4,998.800
|
$5,000.000
|
$3,700.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
4.000
|
$5,263.060
|
$5,500.000
|
$4,500.000
|
$5,554.200
|
$5,300.000
|
$5,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
126.000
|
$500.000
|
$530.000
|
$450.000
|
$423.600
|
$480.000
|
$420.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
16.000
|
$610.000
|
$620.000
|
$675.000
|
$552.700
|
$650.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$595.000
|
$650.000
|
$600.000
|
$604.400
|
$600.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$610.000
|
$750.000
|
$725.000
|
$707.700
|
$690.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
6.000
|
$1,100.000
|
$1,210.000
|
$1,000.000
|
$981.400
|
$800.000
|
$1,040.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$905.000
|
$825.000
|
$675.000
|
$718.000
|
$710.000
|
$750.000
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
1.000
|
$24,620.000
|
$27,500.000
|
$26,125.000
|
$27,771.100
|
$26,000.000
|
$42,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
71.000
|
$115.000
|
$55.000
|
$75.000
|
$43.400
|
$45.000
|
$46.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
5.000
|
$26.000
|
$100.000
|
$24.000
|
$18.600
|
$22.000
|
$29.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
35.000
|
$28.000
|
$33.000
|
$24.000
|
$18.600
|
$22.000
|
$29.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
60.000
|
$75.000
|
$66.000
|
$70.000
|
$56.800
|
$55.000
|
$66.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$300.000
|
$300.000
|
$230.000
|
$258.300
|
$180.000
|
$255.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
2.000
|
$200.000
|
$300.000
|
$200.000
|
$258.300
|
$180.000
|
$255.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,805.000
|
$0.650
|
$0.260
|
$0.300
|
$0.300
|
$0.250
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
100,282.000
|
$0.250
|
$0.260
|
$0.250
|
$0.300
|
$0.250
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
43.000
|
$4.800
|
$15.000
|
$3.000
|
$10.300
|
$13.000
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
96,250.000
|
$0.240
|
$0.290
|
$0.250
|
$0.300
|
$0.270
|
$0.270
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
42,168.000
|
$0.760
|
$0.510
|
$0.750
|
$0.900
|
$0.480
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
2,355.000
|
$1.000
|
$0.550
|
$1.250
|
$0.400
|
$0.530
|
$0.760
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,620.000
|
$0.900
|
$0.830
|
$0.800
|
$0.800
|
$0.800
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
77.000
|
$3.380
|
$4.000
|
$3.000
|
$4.100
|
$3.700
|
$4.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
275.000
|
$7.500
|
$7.700
|
$6.500
|
$7.200
|
$7.500
|
$7.350
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$133.000
|
$137.500
|
$120.000
|
$180.800
|
$130.000
|
$130.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
14.000
|
$320.000
|
$495.000
|
$300.000
|
$361.600
|
$480.000
|
$275.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$153.000
|
$137.500
|
$140.000
|
$258.300
|
$130.000
|
$146.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
10.000
|
$63.000
|
$55.000
|
$40.000
|
$31.000
|
$55.000
|
$66.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
397.000
|
$4.600
|
$6.050
|
$5.000
|
$7.200
|
$6.000
|
$7.350
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
11,330.000
|
$0.430
|
$0.340
|
$0.400
|
$0.400
|
$0.330
|
$0.460
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
139,507.000
|
$0.300
|
$0.330
|
$0.350
|
$0.400
|
$0.320
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
140,663.000
|
$0.320
|
$0.330
|
$0.350
|
$0.400
|
$0.320
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
607.000
|
$3.900
|
$3.850
|
$3.150
|
$3.400
|
$3.700
|
$4.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,852.000
|
$3.000
|
$3.850
|
$3.000
|
$3.400
|
$3.700
|
$4.050
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$285.000
|
$310.000
|
$250.000
|
$288.800
|
$290.000
|
$355.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$7,750.000
|
$6,600.000
|
$6,000.000
|
$7,775.900
|
$7,500.000
|
$13,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
16.000
|
$5,950.000
|
$5,500.000
|
$6,500.000
|
$1,859.600
|
$4,000.000
|
$12,200.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
4.000
|
$13,800.000
|
$10,000.000
|
$6,500.000
|
$9,442.200
|
$9,000.000
|
$11,500.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
4.000
|
$700.000
|
$750.000
|
$775.000
|
$1,110.800
|
$700.000
|
$740.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
1.000
|
$16,000.000
|
$17,000.000
|
$11,000.000
|
$18,884.300
|
$18,000.000
|
$36,500.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
4.000
|
$15,841.730
|
$15,650.000
|
$18,500.000
|
$13,330.100
|
$13,000.000
|
$15,600.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
4.000
|
$6,606.710
|
$7,200.000
|
$6,900.000
|
$6,665.100
|
$7,000.000
|
$7,900.000
|
|
|
TMA (STATIONARY)
|
DAY
|
136.000
|
$245.000
|
$150.000
|
$200.000
|
$198.400
|
$310.000
|
$215.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
160.000
|
$340.000
|
$200.000
|
$200.000
|
$878.100
|
$720.000
|
$215.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$3,580.000
|
$5,000.000
|
$3,653.620
|
$4,443.400
|
$4,500.000
|
$7,600.000
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
6.000
|
$10,800.000
|
$14,650.000
|
$10,628.730
|
$7,775.900
|
$7,500.000
|
$18,000.000
|
|
Totals: |
$13,985,255.900
|
$15,651,725.240
|
$16,703,660.200
|
$16,841,211.495
|
$17,088,497.490
|
$17,331,480.900
|