ERATH US 67 (0079-05-067)

Items: 58

County: ERATH
Length: 271.3000 MILES
Highway: US 67
District: FORT WORTH
Control Number: 0079-05-067
DBE Goal: 0.0%
Project: BR 2026(489)
Guaranty: $88,000.00
Time: 197 WORKING DAYS
Engineer's Estimate: $4,188,151.20
Date: 04/07/2026 (2 months ago)
Contract Number: 4263011
Type: BRIDGE MAINTENANCE
Project ID: A00211316
Contract Type: Federal
Project Description: BRIDGE MAINTENANCE - BRIDGE: PAINT STEEL SUPERSTRUCTURE; MILL AND OVERLAY; TERMARUST ON BEARINGS, SPALL REPAIRS; CLEAN AND SEAL JOINTS; CLEAR DEBRIS; CRACK REPAIRS; CHANNEL MAINTENANCE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,188,151.20
$2,983,533.12
Over/Under Est: -28.76% -$1,204,618.08
Over/Under Est: -21.68% -$907,871.34
Amt Left: 9.95% $296,746.74
Over/Under Est: -20.41% -$854,818.20
Amt Left: 11.72% $349,799.88
Delta: -1.62% -$53,053.14
Over/Under Est: -12.32% -$515,847.80
Amt Left: 23.09% $688,770.28
Delta: -10.17% -$338,970.40
Over/Under Est: -10.47% -$438,582.14
Amt Left: 25.68% $766,035.94
Delta: -2.10% -$77,265.66
Over/Under Est: 1.38% $57,951.55
Amt Left: 42.32% $1,262,569.63
Delta: -13.24% -$496,533.69

Bid Items & Bid Tabulations

58 Total 0 of 58
ERATH  |  US 67  |  FORT WORTH  |  0079-05-067  |  04/07/2026  |  $4,188,151.20  |  BR 2026(489)  |  BRIDGE MAINT  |  197 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLACKSMITH VENTURES LLC
GIBSON & ASSOCIATES, INC.
THE TRUESDELL CORPORATION
STRUCTURAL INTEGRITY GROUP LLC
RAGLE CONSTRUCTION, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PREPARING ROW
AC 1.300 $20,000.000 $15,000.000 $5,500.000 $5,000.000 $2,500.000 $40,000.000 $4,600.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 3,325.000 $10.000 $8.710 $6.580 $6.500 $7.500 $7.500 $6.250
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 7,430.000 $10.000 $8.710 $6.580 $6.500 $10.000 $5.150 $6.500
BACKFILL (TY A)
STA 5.000 $243.000 $200.000 $1,100.000 $1,000.000 $750.000 $550.000 $675.000
SOIL RET BLKT(CHAN_PERM_4 PSF)
SY 81.000 $2.000 $2.000 $11.000 $10.000 $10.000 $7.250 $20.000
SP MIXES SP-C SAC-B PG70-28
TON 419.000 $250.000 $350.000 $391.330 $290.000 $300.000 $350.000 $400.000
TACK COAT
GAL 1,613.000 $3.850 $8.000 $1.650 $11.000 $6.500 $7.000 $2.000
FLOWABLE BACKFILL
CY 17.000 $2,250.000 $1,000.000 $880.000 $800.000 $360.000 $440.000 $500.000
CL C CONC (CRASHWALL)
CY 128.200 $1,100.000 $500.000 $1,265.000 $880.000 $1,590.000 $995.000 $1,100.000
SILICONE RESIN PAINT FINISH
SF 3,250.000 $11.000 $12.100 $6.600 $15.000 $6.000 $6.000 $7.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,425.000 $13.000 $9.900 $27.500 $15.000 $25.000 $12.000 $30.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 70.700 $325.000 $75.000 $66.000 $60.000 $110.000 $200.000 $250.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 6,450.000 $100.000 $55.000 $5.000 $45.000 $30.000 $20.000 $225.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 857.700 $200.000 $91.000 $170.500 $155.000 $468.000 $150.000 $225.000
CONC STR REPAIR (STANDARD)
SF 19.700 $200.000 $75.000 $170.500 $155.000 $468.000 $250.000 $225.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 100.000 $197.000 $1.000 $55.000 $50.000 $100.000 $130.000 $225.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 228.000 $150.000 $162.000 $206.800 $188.000 $225.000 $200.000 $200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 145.000 $160.000 $162.000 $206.800 $188.000 $258.000 $190.000 $200.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 75.000 $60.000 $42.000 $33.000 $60.000 $68.000 $18.000 $50.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 152.000 $43.000 $42.000 $40.700 $63.000 $86.000 $23.000 $55.000
RESIZING AND SEALING JOINTS
LF 298.000 $46.710 $60.000 $81.400 $110.000 $110.000 $64.000 $70.000
CLEAN AND SEAL JNTS (PAN GIRDERS) (CL3)
LF 503.000 $60.000 $42.000 $33.000 $60.000 $64.000 $30.000 $65.000
CLEAN AND SEAL JNTS (PAN GIRDERS) (CL7)
LF 284.000 $42.000 $42.000 $40.700 $60.000 $117.000 $37.000 $65.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 2,116.000 $276.150 $151.000 $220.000 $255.000 $255.000 $235.000 $170.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 5,435.000 $200.000 $151.000 $115.000 $150.000 $121.000 $120.000 $90.000
HEADER TYPE EXPANSION JOINT
CF 15.400 $490.620 $400.000 $1,100.000 $3,000.000 $200.000 $380.000 $500.000
GABION MATTRESSES (GALV)(12 IN)
SY 73.000 $90.000 $369.170 $170.500 $155.000 $240.000 $145.000 $325.000
GABIONS (3' X 3')(GALV)
CY 15.000 $400.000 $617.470 $385.000 $350.000 $585.000 $490.000 $400.000
CLEAN EXIST CULVERTS
CY 675.000 $125.000 $19.250 $88.000 $80.000 $135.000 $20.000 $200.000
MOBILIZATION
LS 1.000 $350,000.000 $340,000.000 $459,000.000 $330,485.600 $350,000.000 $370,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $3,000.000 $20,250.000 $1,700.000 $14,400.000 $35,000.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $15,000.000 $12,000.000 $5,000.000 $2,500.000 $15,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 216.800 $40.000 $20.000 $49.500 $45.000 $45.000 $45.000 $10.000
ROCK FILTER DAMS (REMOVE)
LF 216.800 $14.790 $1.000 $16.500 $15.000 $20.000 $20.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,984.100 $4.110 $3.000 $5.500 $5.000 $5.000 $5.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,984.100 $1.100 $0.100 $1.100 $1.000 $0.500 $0.500 $1.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,119.000 $50.000 $35.000 $48.400 $39.000 $48.500 $35.000 $88.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $120.000 $27.500 $48.400 $38.000 $48.500 $35.000 $90.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,119.000 $20.000 $1.000 $11.000 $11.000 $5.250 $60.000 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $20.000 $1.000 $11.000 $11.000 $5.250 $60.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,119.000 $15.000 $0.250 $24.200 $34.000 $23.000 $5.000 $25.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $30.000 $0.250 $24.200 $34.000 $23.000 $5.000 $25.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 2,838.000 $1.500 $1.750 $1.930 $1.600 $1.750 $1.500 $1.800
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 2,838.000 $1.450 $1.750 $1.930 $1.600 $1.750 $1.500 $1.800
PAVEMENT SLER 6"
LF 5,966.000 $0.280 $0.400 $0.440 $0.250 $0.400 $0.200 $0.250
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 750.000 $0.590 $2.000 $2.200 $0.750 $2.000 $0.700 $0.850
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 2,998.000 $0.470 $1.200 $1.320 $0.750 $1.200 $0.590 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,996.000 $0.460 $1.200 $1.320 $0.750 $1.200 $0.590 $0.750
ELIM EXT PM & MRKS (6")
LF 11,352.000 $0.640 $0.850 $0.940 $0.600 $0.850 $0.550 $0.650
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 512.000 $30.000 $15.750 $16.500 $15.000 $7.500 $35.000 $20.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.300 $1,667.000 $15,000.000 $11,000.000 $10,000.000 $1,640.000 $19,250.000 $2,500.000
DRAIN INLET CLEANING
EA 20.000 $65.000 $20.000 $350.000 $270.000 $150.000 $250.000 $200.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 28.000 $150.000 $75.000 $110.000 $100.000 $70.000 $125.000 $125.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 607.000 $120.000 $75.000 $36.300 $33.000 $45.000 $35.000 $25.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $120,000.000 $115,000.000 $179,679.500 $120,000.000 $163,345.000 $375,000.000 $185,000.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $65,000.000 $85,000.000 $85,085.000 $75,000.000 $77,350.000 $219,000.000 $90,000.000
BENT CAP/ABUTMENT CAP CLEANING
EA 2.000 $500.000 $500.000 $1,100.000 $1,000.000 $2,000.000 $1,150.000 $1,000.000
REMOVE & REPLACE DELINEATOR/OBJECT MARK
EA 2.000 $2.900 $100.000 $150.000 $200.000 $225.000 $195.000 $500.000
Totals: $4,188,151.191 $2,983,533.120 $3,280,279.860 $3,333,333.000 $3,672,303.400 $3,749,569.060 $4,246,102.750
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00
Total: $50,000.00