ELLIS IH0045 (6492-16-001)

Items: 23

County: ELLIS
Length: 0.0100 MILES
Highway: IH0045
District: DALLAS
Control Number: 6492-16-001
DBE Goal: 0.0%
Project: RMC - A00218006
Guaranty: $36,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,799,104.00
Date: 01/06/2026 (5 months ago)
Contract Number: 1264009
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218006
Project Description: METAL BEAM GUARD FENCE REPAIR (MBGF) IN ELLIS COUNTY MAINTENANCE SECTION.
Mail/Deliver Bids To: N/A
JUAN PAREDES
MICHAEL ANTHONY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,799,104.00
$709,394.00
Over/Under Est: -60.57% -$1,089,710.00
Over/Under Est: -45.23% -$813,726.00
Amt Left: 38.9% $275,984.00

Bid Items & Bid Tabulations

23 Total 0 of 23
ELLIS  |  IH0045  |  DALLAS  |  6492-16-001  |  01/06/2026  |  $1,799,104.00  |  RMC - A00218006  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
BK FIELD OPERATIONS LLC
MOBILIZATION (CALLOUT)
EA 500.000 $1,000.000 $1.000 $1.000
TMA (STATIONARY)
DAY 160.000 $400.000 $1.000 $1.000
CONC CURB (TY II)
LF 50.000 $75.000 $10.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 100.000 $40.000 $50.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 100.000 $40.000 $10.000 $5.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 9,000.000 $25.000 $15.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $40.000 $30.000 $70.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $40.000 $30.000 $200.000
REPLACE SHORT RADIUS SYS (TL-3)
EA 50.000 $5,000.000 $50.000 $200.000
REPLACE TIMBER POST W/O CONC FND
EA 1,400.000 $75.000 $70.000 $1.000
REPLACE STEEL POST W/O CONC FND
EA 200.000 $78.000 $10.000 $1.000
REALIGN POSTS
EA 150.000 $30.000 $60.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 152.000 $3,000.000 $2,500.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $150.000 $500.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,387.000 $32.000 $3.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 168.000 $95.000 $10.000 $370.000
REPLACE BLOCKOUT
EA 1,768.000 $20.000 $1.000 $1.000
RESET SGT IMPACT HEAD
EA 35.000 $115.000 $100.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $85.000 $1,000.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $90.000 $1,000.000 $1.000
REPLACE SGT STRUT
EA 5.000 $105.000 $1,000.000 $1.000
RAISE RAIL
LF 475.000 $15.000 $5.000 $4.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $1,000.000 $800.000 $600.000
Totals: $1,799,104.000 $709,394.000 $985,378.000