Show Job Controls
Bid Cobra

ELLIS IH0045 (6471-37-001)

Items: 26

County: ELLIS
Length: 0.0100 MILES
Highway: IH0045
District: DALLAS
Control Number: 6471-37-001
DBE Goal: N/A
Project: RMC - A00211544
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $984,925.00
Date: 08/13/2025 (10 months ago) Changed
Contract Number: 8251801
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00211544
Project Description: METAL BEAM GUARD FENCE REPAIR (MBGF) IN ELLIS COUNTY MAINTENANCE SECTION.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4777 E HWY 80, MESQUITE, TX 75150
JUAN PAREDES
MICHAEL ANTHONY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$984,925.00
$314,300.00
Over/Under Est: -68.09% -$670,625.00
Over/Under Est: -30.86% -$303,910.00
Amt Left: 116.68% $366,715.00
Over/Under Est: 1.23% $12,100.00
Amt Left: 217.22% $682,725.00
Delta: -46.40% -$316,010.00
$1,023,025.00
Over/Under Est: 3.87% $38,100.00
Amt Left: 225.49% $708,725.00
Delta: -2.61% -$26,000.00

Bid Items & Bid Tabulations

26 Total 0 of 26
ELLIS  |  IH0045  |  DALLAS  |  6471-37-001  |  08/13/2025  |  $984,925.00  |  RMC - A00211544  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
ROSS SA ENTERPRISE LLC
ABOVE ALL CONTRACTING LLC
RHINO EQUITY, LLC
MOBILIZATION (CALLOUT)
EA 50.000 $1,000.000 $4,500.000 $1.000 $1.000 $1.000
TMA (STATIONARY)
DAY 250.000 $350.000 $1.000 $1.000 $1.000 $1,500.000
CONC CURB (TY II)
LF 50.000 $75.000 $20.000 $10.000 $100.000 $20.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 475.000 $15.000 $1.000 $5.000 $35.000 $10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,400.000 $100.000 $750.000 $2,000.000 $1,000.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $400.000 $10.000 $1.000 $500.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,000.000 $200.000 $2,500.000 $3,500.000 $2,500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 100.000 $40.000 $20.000 $10.000 $50.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 100.000 $40.000 $1.000 $10.000 $50.000 $10.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 9,000.000 $25.000 $4.000 $28.000 $30.000 $25.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $40.000 $20.000 $10.000 $100.000 $40.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $40.000 $10.000 $10.000 $750.000 $200.000
REPLACE TIMBER POST W/O CONC FND
EA 1,400.000 $75.000 $1.000 $1.000 $30.000 $1.000
REPLACE STEEL POST W/O CONC FND
EA 200.000 $78.000 $10.000 $5.000 $60.000 $1.000
REALIGN POSTS
EA 150.000 $30.000 $10.000 $60.000 $30.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 100.000 $3,000.000 $200.000 $2,600.000 $4,000.000 $2,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $150.000 $100.000 $600.000 $700.000 $600.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $32.000 $4.000 $29.000 $40.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 250.000 $95.000 $1.000 $100.000 $100.000 $40.000
REPLACE BLOCKOUT
EA 1,600.000 $20.000 $1.000 $0.100 $1.000 $1.000
RESET SGT IMPACT HEAD
EA 35.000 $115.000 $25.000 $100.000 $100.000 $50.000
REPLACE SGT OBJECT MARKER
EA 5.000 $55.000 $100.000 $1.000 $100.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $85.000 $100.000 $1.000 $150.000 $25.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $90.000 $100.000 $1.000 $150.000 $25.000
REPLACE SGT STRUT
EA 5.000 $105.000 $100.000 $1.000 $150.000 $25.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $1,000.000 $200.000 $850.000 $1,700.000 $1,200.000
Totals: $984,925.000 $314,300.000 $681,015.000 $997,025.000 $1,023,025.000