Show Job Controls
Bid Cobra

ELLIS IH0045 (6349-74-001)

Items: 47

County: ELLIS
Length: N/A
Highway: IH0045
District: DALLAS
Control Number: 6349-74-001
DBE Goal: N/A
Project: RMC - 634974001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,161,657.50
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: GUARD FENCE & CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,161,657.50
$2,318,045.00
Over/Under Est: 7.23% $156,387.50
Over/Under Est: 12.11% $261,772.50
Amt Left: 4.55% $105,385.00
Over/Under Est: 31.53% $681,492.50
Amt Left: 22.65% $525,105.00
Delta: -17.32% -$419,720.00

Bid Items & Bid Tabulations

47 Total 0 of 47
ELLIS  |  IH0045  |  DALLAS  |  6349-74-001  |  12/03/2019  |  $2,161,657.50  |  RMC - 634974001  |  GUARD FENCE & CABLE BARRIER REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
FIREMAN EXCAVATING, INC.
MARCOM'S MOWING SERVICE, LLC
MOBILIZATION (CALLOUT)
EA 160.000 $300.000 $25.000 $50.000 $500.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 250.000 $12.000 $11.000 $25.000 $50.000
PORT CTB (STKPL)(SGL SLP)(TY 2)
LF 250.000 $12.000 $11.000 $25.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,500.000 $21.500 $24.500 $20.000 $22.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 10.000 $740.000 $300.000 $100.000 $950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 50.000 $1,500.000 $1,000.000 $900.000 $1,250.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 25.000 $2,275.000 $300.000 $3,000.000 $2,980.000
CRASH CUSH ATTEN (REMOVE)
EA 20.000 $950.000 $500.000 $100.000 $3,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 5.000 $9,500.000 $23,000.000 $18,600.000 $21,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 5.000 $18,000.000 $26,000.000 $21,000.000 $25,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 5.000 $9,400.000 $23,000.000 $18,000.000 $20,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 5.000 $18,000.000 $26,000.000 $20,000.000 $25,000.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 15.000 $24.000 $68.000 $30.000 $100.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 15.000 $24.000 $68.000 $30.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $16.500 $17.000 $17.000 $17.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $28.000 $5.000 $25.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $29.500 $100.000 $25.000 $50.000
REM / REPL TIMBER POST W / O CONC FND
EA 500.000 $60.000 $60.000 $30.000 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $150.000 $980.000 $250.000 $400.000
REALIGN POSTS
EA 300.000 $13.500 $5.000 $10.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 300.000 $16.750 $30.000 $10.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5,000.000 $25.000 $20.000 $20.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $64.000 $80.000 $60.000 $60.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $65.000 $50.000 $1.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 200.000 $2,900.000 $3,000.000 $3,000.000 $2,920.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $975.000 $500.000 $1,000.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $95.000 $150.000 $100.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 125.000 $80.000 $100.000 $70.000 $110.000
REPLACE SGT CABLE ANCHOR
EA 125.000 $74.000 $80.000 $70.000 $110.000
REPLACE SGT STRUT
EA 50.000 $68.000 $80.000 $70.000 $110.000
REPLACE SGT OBJECT MARKER
EA 5.000 $45.000 $840.000 $30.000 $50.000
REMOVE AND REPLACE DAT
EA 5.000 $1,300.000 $3,000.000 $900.000 $1,150.000
REPLACE POSTS (TL-4)
EA 2,000.000 $125.000 $90.000 $110.000 $185.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 25.000 $175.000 $80.000 $150.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $37.000 $25.000 $50.000 $250.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $800.000 $5,160.000 $750.000 $1,100.000
REPLACE CABLE (TL-4)
LF 2,000.000 $3.100 $4.000 $1.000 $3.000
CHECK / RE-TENSION CABLE
EA 60.000 $245.000 $300.000 $100.000 $250.000
REPAIR REACT (CYLINDERS)
EA 5.000 $2,900.000 $1,500.000 $500.000 $1,500.000
REMOVE AND REPLACE (SMTC) (N)
EA 3.000 $18,000.000 $28,000.000 $21,000.000 $25,000.000
REPAIR (SMTC) (N)
LF 200.000 $165.000 $150.000 $1,500.000 $300.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 3.000 $11,000.000 $23,000.000 $21,000.000 $25,000.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 10.000 $450.000 $1,500.000 $1,000.000 $1,500.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 3.000 $15,000.000 $18,000.000 $20,000.000 $20,000.000
REPAIR (TAU)(MASH)(N)
EA 5.000 $400.000 $1,000.000 $500.000 $5,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 10.000 $400.000 $1,000.000 $100.000 $1,100.000
TMA (STATIONARY)
DAY 160.000 $250.000 $100.000 $100.000 $250.000
Totals: $2,161,657.500 $2,318,045.000 $2,423,430.000 $2,843,150.000