ELLIS FM 879 (1159-02-037)

Items: 113

County: ELLIS
Length: N/A
Highway: FM 879
District: DALLAS
Control Number: 1159-02-037
DBE Goal: N/A
Project: F 2023(986)
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $7,473,625.91
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$7,473,625.91
$8,156,479.25
Over/Under Est: 9.14% $682,853.34
$8,282,808.71
Over/Under Est: 10.83% $809,182.80
Amt Left: 1.55% $126,329.46
$9,362,954.00
Over/Under Est: 25.28% $1,889,328.09
Amt Left: 14.79% $1,206,474.75
Delta: -13.04% -$1,080,145.29
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 16.50% $1,446,457.49
MELS ELECTRIC, L.P. 3.22% $282,278.37
DUSTROL, INC. 2.39% $209,517.18
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 2.36% $206,887.25
SYNERGY SIGNS & SERVICES LLC 1.75% $153,412.16
TRAFFIC HIGHWAY MAINTENANCE, LLC 1.03% $90,294.01
AWP SAFETY 0.79% $69,254.63
CEN-TREE SOLUTIONS LLC 0.31% $27,175.87
WEST TEXAS ROCK RESOURCES, LLC 0.09% $7,889.77
STATEWIDE TRUCKING CORP. 0.00% $0.00
TEXAS SWPPP SERVICES 0.00% $0.00
FORTSON CONTRACTING, INC. 0.00% $0.00
Total: 28.44% $2,493,166.73

Bid Items & Bid Tabulations

113 Total 0 of 113
ELLIS  |  FM 879  |  DALLAS  |  1159-02-037  |  06/27/2023  |  $7,473,625.91  |  F 2023(986)  |  REHAB EXIST ROADWAY  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
A. L. HELMCAMP, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 194.000 $2,500.000 $840.000 $1,540.000 $4,123.000
REMOVING CONC (RIPRAP)
CY 3.610 $205.000 $400.000 $650.000 $100.000
REMOVING CONC (DRIVEWAYS)
SY 344.110 $18.000 $20.000 $69.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 8.000 $130.000 $75.000 $195.000 $20.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,335.110 $8.000 $18.000 $14.000 $20.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 1,369.000 $12.000 $18.000 $31.000 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 187.800 $230.000 $500.000 $350.000 $450.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,094.000 $15.000 $20.000 $37.000 $30.000
BACKFILL (TY A OR B)
STA 187.800 $202.000 $350.000 $240.000 $450.000
ROAD GRADER WORK (ORD COMP)
STA 187.800 $163.000 $500.000 $140.000 $450.000
COMPOST MANUF TOPSOIL (4")
SY 103,146.000 $1.500 $1.000 $1.000 $1.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 103,146.000 $0.350 $0.200 $0.240 $0.250
DRILL SEED (TEMP)(WARM OR COOL)
SY 51,574.000 $0.360 $0.200 $0.180 $0.250
VEGETATIVE WATERING
MG 23,016.000 $5.000 $2.100 $0.200 $10.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 1,928.000 $20.000 $20.000 $20.000 $25.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 2,531.000 $35.000 $31.500 $72.000 $60.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 58,443.000 $25.000 $27.500 $34.000 $25.000
REWRK BSE MATL (TY B)(7")(ORD COMP)
SY 45,918.000 $3.000 $3.000 $3.000 $4.000
CEMENT
TON 377.000 $250.000 $250.000 $280.000 $350.000
CEMENT TREAT (NEW BASE) (6")
SY 1,929.000 $15.000 $5.000 $5.000 $15.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 44,549.000 $1.800 $3.000 $4.200 $8.000
PRIME COAT(MC-30 OR AE-P)
GAL 11,688.000 $5.500 $12.000 $7.500 $6.000
ASPH (CRS-2P)
GAL 9,740.000 $6.000 $7.000 $6.000 $6.000
ASPH (RC-250)
GAL 5,455.000 $6.000 $9.000 $6.000 $6.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 156.000 $160.000 $430.000 $150.000 $350.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 8,182.000 $6.000 $8.000 $5.500 $6.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 162.000 $190.000 $440.750 $170.000 $350.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 186.000 $250.000 $430.000 $150.000 $350.000
PLANE ASPH CONC PAV (2")
SY 1,498.000 $2.250 $6.000 $6.000 $6.000
PLANE ASPH CONC PAV (4")
SY 44,549.000 $3.500 $4.000 $1.000 $4.000
TRENCH EXCAVATION PROTECTION
LF 523.000 $7.500 $10.000 $2.000 $10.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 206.000 $170.000 $260.000 $170.000 $300.000
CONC BOX CULV (3 FT X 2 FT)
LF 63.000 $350.000 $308.000 $420.000 $850.000
CONC BOX CULV (6 FT X 3 FT)
LF 192.000 $680.000 $680.000 $750.000 $1,000.000
CONC BOX CULV (10 FT X 4 FT)
LF 56.000 $1,000.000 $1,155.000 $1,300.000 $1,650.000
RC PIPE (CL III)(18 IN)
LF 1,994.000 $88.000 $80.000 $72.000 $85.000
RC PIPE (CL III)(24 IN)
LF 406.000 $110.000 $100.000 $94.000 $125.000
RC PIPE (CL III)(30 IN)
LF 322.000 $150.000 $150.000 $122.000 $165.000
RC PIPE (CL III)(36 IN)
LF 90.000 $210.000 $195.000 $205.000 $225.000
RC PIPE (CL III)(42 IN)
LF 118.000 $250.000 $240.000 $290.000 $350.000
RC PIPE (CL III)(48 IN)
LF 66.000 $275.000 $305.000 $390.000 $400.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $8,000.000 $10,000.000 $11,500.000 $12,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 9.000 $8,440.000 $5,500.000 $6,700.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $16,554.000 $12,000.000 $16,000.000 $9,500.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $10,000.000 $17,500.000 $16,000.000 $9,000.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $10,500.000 $12,000.000 $27,000.000 $12,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $24,000.000 $22,000.000 $48,000.000 $25,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $26,000.000 $23,000.000 $45,000.000 $35,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $28,000.000 $30,000.000 $75,000.000 $45,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $12,000.000 $12,000.000 $8,000.000 $15,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 128.000 $800.000 $899.000 $1,200.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,710.000 $900.000 $1,300.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,725.000 $2,500.000 $2,900.000 $3,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $5,310.000 $6,500.000 $5,200.000 $4,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $10,000.000 $3,300.000 $5,200.000 $5,000.000
REMOV STR (SET)
EA 12.000 $510.000 $400.000 $450.000 $500.000
REMOV STR (HEADWALL)
EA 12.000 $1,500.000 $2,000.000 $1,300.000 $2,500.000
REMOV STR (PIPE)
LF 524.000 $12.500 $40.000 $24.000 $50.000
REMOV STR (BOX CULVERT)
LF 273.000 $130.000 $75.000 $75.000 $60.000
REMOV STR (PIPE)
EA 74.000 $436.000 $500.000 $390.000 $500.000
MOBILIZATION
LS 1.000 $650,000.000 $813,000.000 $600,000.000 $825,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $14,125.000 $31,500.000 $20,650.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 89.000 $34.000 $75.000 $45.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 348.000 $55.000 $85.000 $77.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 437.000 $12.000 $40.000 $20.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 123.000 $27.000 $27.500 $10.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 123.000 $9.000 $12.500 $5.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,710.000 $3.500 $2.100 $4.300 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,710.000 $0.800 $0.500 $1.100 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,393.000 $4.500 $4.000 $7.700 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,393.000 $0.750 $1.500 $2.200 $9.000
DRIVEWAYS (ACP)
SY 4,569.330 $70.000 $60.000 $50.000 $45.000
DRIVEWAYS (CONC) (HES)
SY 344.110 $81.000 $200.000 $166.000 $150.000
CONC SIDEWALKS (4")
SY 8.000 $150.000 $250.000 $178.000 $100.000
RUMBLE STRIPS (SHOULDER)
LF 38,795.000 $0.250 $0.150 $0.400 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 19,398.000 $0.250 $0.150 $0.400 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 670.000 $30.000 $22.040 $23.000 $35.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $3,000.000 $22,000.000 $2,000.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 705.000 $4.000 $2.690 $3.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,500.000 $2,983.130 $3,100.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $300.000 $268.750 $280.000 $1,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 56.000 $240.000 $268.750 $360.000 $850.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $280.000 $274.130 $400.000 $850.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $800.000 $806.250 $840.000 $850.000
ALUMINUM SIGNS (TY A)
SF 270.000 $42.000 $32.250 $39.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 37.000 $729.000 $671.880 $780.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,200.000 $736.380 $950.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $874.000 $1,263.130 $1,220.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $700.000 $1,370.630 $1,220.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,268.000 $1,128.750 $1,220.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $900.000 $1,585.630 $1,220.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 3.000 $1,518.000 $1,451.250 $1,220.000 $1,100.000
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
EA 14.000 $360.000 $698.750 $390.000 $2,500.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 16.000 $35.000 $26.880 $30.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 20.000 $162.000 $161.250 $85.000 $100.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 248.000 $0.500 $3.230 $2.400 $1.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 78.000 $9.500 $7.850 $10.000 $10.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 2.000 $650.000 $680.480 $850.000 $1,500.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 53,755.000 $1.000 $0.630 $0.900 $1.250
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 10,149.000 $0.600 $0.700 $0.900 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 40,549.000 $0.850 $0.630 $0.900 $1.250
REFL PAV MRKR TY II-A-A
EA 680.000 $7.500 $5.380 $5.600 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 30,604.000 $0.750 $0.550 $0.500 $1.000
PAV SURF PREP FOR MRK (6")
LF 33,508.000 $0.250 $0.140 $0.020 $0.500
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 24.000 $11,000.000 $10,750.000 $12,500.000 $14,000.000
FULL - WIDTH MOWING
CYC 3.000 $5,000.000 $8,000.000 $3,200.000 $5,000.000
SP MIXES SP-C SAC-B PG64-22
TON 6,578.000 $130.000 $142.600 $152.000 $130.000
TACK COAT
GAL 3,588.000 $5.500 $7.200 $5.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,680.000 $20,000.000 $15,000.000 $16,500.000
TMA (STATIONARY)
DAY 180.000 $170.000 $250.000 $250.000 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $800.000 $1,000.000 $350.000 $550.000
LEAD LED CHEVRON
EA 4.000 $4,000.000 $4,294.630 $5,600.000 $6,500.000
LED CHEVRON
EA 24.000 $3,000.000 $3,063.750 $3,100.000 $3,500.000
Totals: $7,473,625.910 $8,156,479.250 $8,282,808.710 $9,362,954.000