ELLIS FM 916 (0712-03-013)

Items: 104

County: ELLIS
Length: N/A
Highway: FM 916
District: DALLAS
Control Number: 0712-03-013
DBE Goal: 0.0%
Project: C 712-3-13
Guaranty: N/A
Time: 309 WORKING DAYS
Engineer's Estimate: $9,984,313.48
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$9,984,313.48
$8,833,670.46
Over/Under Est: -11.52% -$1,150,643.02
Over/Under Est: 14.37% $1,435,118.15
Amt Left: 29.27% $2,585,761.17
$11,703,564.88
Over/Under Est: 17.22% $1,719,251.40
Amt Left: 32.49% $2,869,894.42
Delta: -2.49% -$284,133.25
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 1.11% $99,451.29
TEXAS TRAFFIC AND BARRICADE, LLC 0.06% $5,375.75
HOLLINGSWORTH CONCRETE CORING 0.02% $1,791.92
DALLAS LITE AND BARRICADE, INC. 0.00% $0.00
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.00% $0.00
MURRAY CONSTRUCTION 0.00% $0.00
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
A. E. MOORE CONSTRUCTION, INC. 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
BEAR CREEK CONSTRUCTION, LLC 0.00% $0.00
CEN-TREE SOLUTIONS LLC 0.00% $0.00
Total: 1.19% $106,618.96

Bid Items & Bid Tabulations

104 Total 0 of 104
ELLIS  |  FM 916  |  DALLAS  |  0712-03-013  |  06/05/2024  |  $9,984,313.48  |  C 712-3-13  |  REHAB EXIST ROADWAY  |  309 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
ED BELL CONSTRUCTION COMPANY
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 262.390 $500.000 $750.000 $1,470.000 $3,812.000
REMOVING CONC (DRIVEWAYS)
SY 803.000 $20.000 $26.000 $35.000 $20.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,262.000 $18.000 $8.750 $40.000 $20.000
REMOVING STAB BASE & ASPH PAV (4"-22")
SY 60.000 $25.000 $25.000 $40.000 $20.000
EXCAVATION (ROADWAY)
CY 1,656.000 $20.000 $25.000 $25.000 $50.000
SUBGRADE WIDENING (ORD COMP)
STA 259.000 $225.000 $475.000 $2,000.000 $450.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 15,750.000 $40.000 $25.000 $10.000 $30.000
BACKFILL (TY A OR B)
STA 261.000 $140.000 $225.000 $315.000 $250.000
ROAD GRADER WORK (ORD COMP)
STA 261.000 $150.000 $50.000 $525.000 $150.000
COMPOST MANUF TOPSOIL (4")
SY 103,548.000 $2.000 $0.750 $1.050 $5.000
BLOCK SODDING
SY 685.000 $6.000 $16.000 $15.750 $10.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 102,863.000 $0.200 $0.280 $0.190 $0.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 102,863.000 $0.650 $0.280 $0.180 $0.500
VEGETATIVE WATERING
MG 30,706.000 $5.000 $0.010 $1.050 $3.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 5,500.000 $40.000 $40.000 $36.000 $60.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
SY 178.000 $45.000 $75.000 $100.000 $50.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 80,590.000 $30.000 $27.500 $37.500 $25.000
REWORK BS MTL (TY C)(12")(ORD COMP)
SY 63,312.000 $1.800 $2.500 $5.250 $5.000
CEMENT
TON 446.000 $320.000 $275.000 $250.000 $350.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 89,212.000 $3.000 $2.000 $1.000 $8.000
PRIME COAT(MC-30 OR AE-P)
GAL 16,154.000 $8.570 $6.750 $7.500 $10.000
ASPH (CRS-2P)
GAL 25,256.000 $6.000 $4.750 $6.250 $6.000
ASPH (RC-250)
GAL 7,523.000 $5.500 $5.500 $7.250 $8.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 258.000 $310.000 $180.000 $162.000 $300.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 11,285.000 $6.750 $4.750 $6.500 $6.000
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 269.000 $320.250 $185.000 $228.000 $300.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 461.000 $280.000 $212.000 $206.000 $300.000
PLANE ASPH CONC PAV (2")
SY 652.000 $30.000 $7.500 $21.000 $20.000
CEM STABIL BKFL
CY 196.000 $748.000 $345.000 $300.000 $350.000
CUT & RESTORING PAV
SY 195.000 $185.000 $165.000 $225.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 168.000 $10.000 $9.000 $25.000 $10.000
TEMPORARY SPL SHORING
SF 909.000 $36.000 $27.000 $30.000 $85.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 382.000 $215.800 $255.000 $315.000 $180.000
CONC BOX CULV (5 FT X 3 FT)
LF 96.000 $577.050 $565.000 $650.000 $1,000.000
CONC BOX CULV(5'X 6.5')
LF 46.000 $1,166.670 $1,000.000 $850.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 1,754.000 $70.000 $74.000 $75.000 $70.000
RC PIPE (CL III)(24 IN)
LF 648.000 $115.080 $105.000 $90.000 $110.000
RC PIPE (CL III)(30 IN)
LF 173.000 $174.930 $119.000 $120.000 $155.000
RC PIPE (CL III)(36 IN)
LF 236.000 $246.030 $255.000 $225.000 $180.000
RC PIPE (CL III)(42 IN)
LF 60.000 $314.620 $335.000 $300.000 $350.000
RC PIPE (CL III)(48 IN)
LF 68.000 $369.210 $372.000 $350.000 $400.000
HEADWALL (CH - FW - 30) (DIA= 36 IN)
EA 2.000 $10,410.000 $10,000.000 $12,375.000 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $7,083.250 $8,700.000 $24,075.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $7,827.650 $9,600.000 $10,525.000 $4,250.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $10,780.250 $9,700.000 $11,825.000 $4,500.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $13,088.250 $11,800.000 $12,050.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $14,303.000 $12,500.000 $14,650.000 $12,500.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $10,211.750 $11,400.000 $16,825.000 $4,500.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $16,000.000 $12,000.000 $15,525.000 $16,500.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $44,000.000 $29,000.000 $43,325.000 $35,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 104.000 $1,550.000 $1,635.000 $1,150.000 $900.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $1,866.000 $1,475.000 $1,200.000 $2,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,857.250 $1,965.000 $1,600.000 $2,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 27.000 $1,836.750 $1,965.000 $1,600.000 $2,300.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $4,463.350 $2,925.000 $2,700.000 $3,000.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,115.250 $3,900.000 $4,000.000 $3,500.000
CLEAN EXIST CULVERTS
EA 3.000 $3,295.000 $2,600.000 $2,000.000 $5,000.000
REMOV STR (SET)
EA 2.000 $600.000 $995.000 $750.000 $500.000
REMOV STR (WINGWALL)
EA 6.000 $2,730.550 $1,650.000 $4,000.000 $2,500.000
REMOV STR (HEADWALL)
EA 4.000 $1,993.600 $1,650.000 $2,000.000 $2,500.000
REMOV STR (PIPE)
LF 2,267.000 $40.000 $21.000 $35.000 $30.000
REMOV STR (BOX CULVERT)
LF 88.000 $76.000 $125.000 $150.000 $100.000
MOBILIZATION
LS 1.000 $890,000.000 $880,000.000 $1,142,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $8,000.000 $12,500.000 $36,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 572.000 $51.050 $52.000 $78.750 $30.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 283.000 $65.500 $68.000 $99.750 $30.000
ROCK FILTER DAMS (REMOVE)
LF 855.000 $22.050 $11.000 $57.750 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 130.000 $29.930 $26.000 $30.450 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 130.000 $10.500 $11.000 $15.750 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,977.000 $4.000 $6.750 $3.150 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,977.000 $2.000 $1.000 $1.580 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,530.000 $6.500 $7.500 $5.780 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,530.000 $1.350 $2.000 $1.840 $9.000
INTERSECTIONS (ACP)
SY 1,262.000 $70.000 $60.000 $73.500 $45.000
DRIVEWAYS (CONC)
SY 803.000 $180.000 $182.000 $150.000 $85.000
DRIVEWAYS (ACP)
SY 4,201.000 $65.000 $65.000 $73.500 $45.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 51,752.000 $0.130 $0.280 $0.390 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 26,092.000 $0.150 $0.280 $0.300 $0.250
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 40.000 $500.000 $312.000 $262.500 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 82.000 $930.060 $680.000 $682.500 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 9.000 $904.190 $850.000 $840.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $1,022.380 $795.000 $787.500 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,058.130 $965.000 $892.500 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,229.710 $1,075.000 $945.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,472.600 $1,165.000 $1,207.500 $1,100.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $771.820 $510.000 $735.000 $1,150.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $60.500 $85.000 $78.750 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 31.000 $112.750 $105.000 $262.500 $100.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,200.000 $0.750 $0.320 $0.420 $0.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 119.000 $14.460 $9.090 $13.650 $20.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 128.000 $0.900 $1.140 $2.100 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 51,752.000 $0.900 $0.770 $0.790 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,300.000 $0.900 $0.860 $0.850 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,923.000 $0.900 $0.770 $0.790 $1.000
REFL PAV MRKR TY II-A-A
EA 278.000 $6.670 $5.650 $10.500 $6.000
PAV SURF PREP FOR MRK (6")
LF 83,976.000 $0.140 $0.020 $0.010 $0.200
PAV SURF PREP FOR MRK (24")
LF 119.000 $1.500 $1.100 $0.010 $3.000
PAV SURF PREP FOR MRK (RPM)
EA 278.000 $0.600 $1.100 $0.010 $5.000
FULL - WIDTH MOWING
CYC 3.000 $5,300.000 $4,000.000 $9,000.000 $2,500.000
SP MIXES SP-C SAC-B PG64-22
TON 8,932.000 $130.000 $125.000 $140.000 $160.000
TACK COAT
GAL 36.000 $8.000 $10.000 $20.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,118.700 $22,500.000 $15,750.000 $16,500.000
TMA (STATIONARY)
DAY 377.000 $233.000 $25.000 $100.000 $250.000
TMA (MOBILE OPERATION)
HR 90.000 $106.750 $75.000 $125.000 $55.000
Totals: $9,984,313.480 $8,833,670.460 $11,419,431.630 $11,703,564.880