PREPARING ROW
|
STA
|
262.390
|
$500.000
|
$750.000
|
$1,470.000
|
$3,812.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
803.000
|
$20.000
|
$26.000
|
$35.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,262.000
|
$18.000
|
$8.750
|
$40.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
60.000
|
$25.000
|
$25.000
|
$40.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,656.000
|
$20.000
|
$25.000
|
$25.000
|
$50.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
259.000
|
$225.000
|
$475.000
|
$2,000.000
|
$450.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
15,750.000
|
$40.000
|
$25.000
|
$10.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
261.000
|
$140.000
|
$225.000
|
$315.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
261.000
|
$150.000
|
$50.000
|
$525.000
|
$150.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
103,548.000
|
$2.000
|
$0.750
|
$1.050
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
685.000
|
$6.000
|
$16.000
|
$15.750
|
$10.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
102,863.000
|
$0.200
|
$0.280
|
$0.190
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
102,863.000
|
$0.650
|
$0.280
|
$0.180
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
30,706.000
|
$5.000
|
$0.010
|
$1.050
|
$3.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
5,500.000
|
$40.000
|
$40.000
|
$36.000
|
$60.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
|
SY
|
178.000
|
$45.000
|
$75.000
|
$100.000
|
$50.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
80,590.000
|
$30.000
|
$27.500
|
$37.500
|
$25.000
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
63,312.000
|
$1.800
|
$2.500
|
$5.250
|
$5.000
|
|
|
CEMENT
|
TON
|
446.000
|
$320.000
|
$275.000
|
$250.000
|
$350.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
89,212.000
|
$3.000
|
$2.000
|
$1.000
|
$8.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
16,154.000
|
$8.570
|
$6.750
|
$7.500
|
$10.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
25,256.000
|
$6.000
|
$4.750
|
$6.250
|
$6.000
|
|
|
ASPH (RC-250)
|
GAL
|
7,523.000
|
$5.500
|
$5.500
|
$7.250
|
$8.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
258.000
|
$310.000
|
$180.000
|
$162.000
|
$300.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
11,285.000
|
$6.750
|
$4.750
|
$6.500
|
$6.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
269.000
|
$320.250
|
$185.000
|
$228.000
|
$300.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
461.000
|
$280.000
|
$212.000
|
$206.000
|
$300.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
652.000
|
$30.000
|
$7.500
|
$21.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
196.000
|
$748.000
|
$345.000
|
$300.000
|
$350.000
|
|
|
CUT & RESTORING PAV
|
SY
|
195.000
|
$185.000
|
$165.000
|
$225.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
168.000
|
$10.000
|
$9.000
|
$25.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
909.000
|
$36.000
|
$27.000
|
$30.000
|
$85.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
382.000
|
$215.800
|
$255.000
|
$315.000
|
$180.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
96.000
|
$577.050
|
$565.000
|
$650.000
|
$1,000.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
46.000
|
$1,166.670
|
$1,000.000
|
$850.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,754.000
|
$70.000
|
$74.000
|
$75.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
648.000
|
$115.080
|
$105.000
|
$90.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
173.000
|
$174.930
|
$119.000
|
$120.000
|
$155.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
236.000
|
$246.030
|
$255.000
|
$225.000
|
$180.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
60.000
|
$314.620
|
$335.000
|
$300.000
|
$350.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
68.000
|
$369.210
|
$372.000
|
$350.000
|
$400.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 36 IN)
|
EA
|
2.000
|
$10,410.000
|
$10,000.000
|
$12,375.000
|
$4,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$7,083.250
|
$8,700.000
|
$24,075.000
|
$4,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,827.650
|
$9,600.000
|
$10,525.000
|
$4,250.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$10,780.250
|
$9,700.000
|
$11,825.000
|
$4,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$13,088.250
|
$11,800.000
|
$12,050.000
|
$8,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$14,303.000
|
$12,500.000
|
$14,650.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$10,211.750
|
$11,400.000
|
$16,825.000
|
$4,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$16,000.000
|
$12,000.000
|
$15,525.000
|
$16,500.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$44,000.000
|
$29,000.000
|
$43,325.000
|
$35,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
104.000
|
$1,550.000
|
$1,635.000
|
$1,150.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,866.000
|
$1,475.000
|
$1,200.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,857.250
|
$1,965.000
|
$1,600.000
|
$2,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
27.000
|
$1,836.750
|
$1,965.000
|
$1,600.000
|
$2,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,463.350
|
$2,925.000
|
$2,700.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,115.250
|
$3,900.000
|
$4,000.000
|
$3,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$3,295.000
|
$2,600.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$600.000
|
$995.000
|
$750.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$2,730.550
|
$1,650.000
|
$4,000.000
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,993.600
|
$1,650.000
|
$2,000.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,267.000
|
$40.000
|
$21.000
|
$35.000
|
$30.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
88.000
|
$76.000
|
$125.000
|
$150.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$890,000.000
|
$880,000.000
|
$1,142,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$8,000.000
|
$12,500.000
|
$36,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
572.000
|
$51.050
|
$52.000
|
$78.750
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
283.000
|
$65.500
|
$68.000
|
$99.750
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
855.000
|
$22.050
|
$11.000
|
$57.750
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
130.000
|
$29.930
|
$26.000
|
$30.450
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
130.000
|
$10.500
|
$11.000
|
$15.750
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,977.000
|
$4.000
|
$6.750
|
$3.150
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,977.000
|
$2.000
|
$1.000
|
$1.580
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
4,530.000
|
$6.500
|
$7.500
|
$5.780
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,530.000
|
$1.350
|
$2.000
|
$1.840
|
$9.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,262.000
|
$70.000
|
$60.000
|
$73.500
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
803.000
|
$180.000
|
$182.000
|
$150.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,201.000
|
$65.000
|
$65.000
|
$73.500
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
51,752.000
|
$0.130
|
$0.280
|
$0.390
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
26,092.000
|
$0.150
|
$0.280
|
$0.300
|
$0.250
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
40.000
|
$500.000
|
$312.000
|
$262.500
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
82.000
|
$930.060
|
$680.000
|
$682.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
9.000
|
$904.190
|
$850.000
|
$840.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$1,022.380
|
$795.000
|
$787.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,058.130
|
$965.000
|
$892.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,229.710
|
$1,075.000
|
$945.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,472.600
|
$1,165.000
|
$1,207.500
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$771.820
|
$510.000
|
$735.000
|
$1,150.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
2.000
|
$60.500
|
$85.000
|
$78.750
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
31.000
|
$112.750
|
$105.000
|
$262.500
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
52,200.000
|
$0.750
|
$0.320
|
$0.420
|
$0.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
119.000
|
$14.460
|
$9.090
|
$13.650
|
$20.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
128.000
|
$0.900
|
$1.140
|
$2.100
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
51,752.000
|
$0.900
|
$0.770
|
$0.790
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,300.000
|
$0.900
|
$0.860
|
$0.850
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
27,923.000
|
$0.900
|
$0.770
|
$0.790
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
278.000
|
$6.670
|
$5.650
|
$10.500
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
83,976.000
|
$0.140
|
$0.020
|
$0.010
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
119.000
|
$1.500
|
$1.100
|
$0.010
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
278.000
|
$0.600
|
$1.100
|
$0.010
|
$5.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$5,300.000
|
$4,000.000
|
$9,000.000
|
$2,500.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
8,932.000
|
$130.000
|
$125.000
|
$140.000
|
$160.000
|
|
|
TACK COAT
|
GAL
|
36.000
|
$8.000
|
$10.000
|
$20.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,118.700
|
$22,500.000
|
$15,750.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
377.000
|
$233.000
|
$25.000
|
$100.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
90.000
|
$106.750
|
$75.000
|
$125.000
|
$55.000
|
|
Totals: |
$9,984,313.480
|
$8,833,670.460
|
$11,419,431.630
|
$11,703,564.880
|