Show Job Controls
Bid Cobra

ELLIS US 67 (0261-01-050)

Items: 66

County: ELLIS
Length: N/A
Highway: US 67
District: DALLAS
Control Number: 0261-01-050
DBE Goal: N/A
Project: F 2023(719)
Guaranty: N/A
Time: 189 WORKING DAYS
Engineer's Estimate: $10,327,150.87
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$10,327,150.87
$11,275,366.65
Over/Under Est: 9.18% $948,215.78
Over/Under Est: 10.02% $1,034,342.37
Amt Left: 0.76% $86,126.59
Over/Under Est: 10.05% $1,038,054.54
Amt Left: 0.8% $89,838.76
Delta: -0.03% -$3,712.17
$12,306,255.44
Over/Under Est: 19.16% $1,979,104.57
Amt Left: 9.14% $1,030,888.79
Delta: -8.28% -$941,050.03
Over/Under Est: 25.96% $2,680,440.64
Amt Left: 15.36% $1,732,224.86
Delta: -5.70% -$701,336.07
Subcontractor Percentage Amount
DUSTROL, INC. 8.89% $1,060,809.43
FORTSON CONTRACTING, INC. 8.10% $966,541.78
JR WEST TEXAS CONCRETE LLC 6.92% $825,736.93
LINEAR TRAFFIC MARKINGS LLC 1.15% $137,225.07
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.27% $32,218.06
SURFACE PREPARATION TECHNOLOGIES, LLC 0.16% $19,092.18
CHEROKEE SERVICES 0.09% $10,739.35
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.00% $0.00
IBCTX, LLC 0.00% $0.00
J. H. ODEN CONTRACTING COMPANY 0.00% $0.00
SCOTT DERR PAINTING CO, LLC 0.00% $0.00
SLATON BROS, INC. 0.00% $0.00
BERNALL CONSTRUCTION RETAINING WALL INC 0.00% $0.00
Total: 25.58% $3,052,362.80

Bid Items & Bid Tabulations

66 Total 0 of 66
ELLIS  |  US 67  |  DALLAS  |  0261-01-050  |  05/04/2023  |  $10,327,150.87  |  F 2023(719)  |  REHAB EXIST ROADWAY  |  189 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FOUTSCO PAVING COMPANY, LLC
NORTHEASTERN PAVERS, LLC
3LW CIVIL LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
REMOVING CONC (RIPRAP)
SY 53.000 $30.000 $46.000 $30.000 $48.000 $55.130 $52.200
REMOVING CONC (FLUME)
SY 6.000 $40.000 $118.000 $30.000 $120.000 $43.000 $461.110
REMOVING CONCRETE(MOW STRIP)
LF 3,844.000 $15.000 $10.500 $10.000 $11.000 $13.000 $10.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,825.000 $1.750 $1.750 $0.010 $4.000 $0.700 $0.650
VEGETATIVE WATERING
MG 159.000 $55.000 $34.000 $0.010 $75.000 $129.000 $160.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 6,800.000 $95.000 $100.500 $105.000 $95.000 $95.000 $98.480
PLANE ASPH CONC PAV (2")
SY 429,785.000 $1.500 $2.230 $0.750 $2.250 $2.250 $3.000
CEM STABIL BKFL
CY 2.000 $750.000 $650.000 $500.000 $715.000 $1,000.000 $875.000
CL B CONC (FLUME)
CY 2.000 $1,100.000 $900.000 $900.000 $950.000 $1,000.000 $3,680.600
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 32.000 $375.000 $250.000 $265.000 $235.000 $220.000 $247.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 85.000 $239.000 $325.000 $195.000 $300.000 $194.000 $246.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 0.300 $3,500.000 $12,000.000 $10,000.000 $12,000.000 $6,000.000 $16,000.000
RIPRAP (CONC)(5 IN)
CY 8.000 $700.000 $900.000 $780.000 $890.000 $568.000 $1,148.900
RIPRAP (MOW STRIP)(4 IN)
CY 1,232.000 $420.000 $600.000 $500.000 $635.000 $500.000 $693.380
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 240.000 $50.000 $55.000 $39.000 $60.000 $43.000 $45.000
RETROFIT RAIL (TY T221)(HPC)
LF 79.900 $350.000 $280.000 $600.000 $280.000 $250.000 $450.150
MOBILIZATION
LS 1.000 $923,788.500 $515,000.000 $900,000.000 $950,000.000 $640,000.000 $1,300,759.150
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $7,000.000 $4,400.000 $38,500.000 $20,000.000 $78,000.000 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,290.000 $4.000 $4.000 $0.010 $6.500 $3.800 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,290.000 $1.000 $1.500 $0.010 $3.000 $0.700 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 260.000 $4.750 $5.000 $0.010 $7.000 $7.000 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 260.000 $1.250 $1.000 $0.010 $3.500 $5.000 $1.000
CONC CURB (TY II)
LF 360.000 $50.000 $50.000 $18.000 $53.500 $39.000 $40.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 148,996.000 $0.370 $0.100 $0.150 $0.250 $1.180 $0.090
MTL W-BEAM GD FEN (TIM POST)
LF 23,678.000 $24.000 $23.500 $21.000 $24.500 $40.000 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $35.000 $29.250 $26.000 $30.500 $50.000 $33.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 46.000 $1,912.000 $2,400.000 $1,800.000 $2,200.000 $4,000.000 $1,800.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $1,250.000 $1,100.000 $950.000 $1,125.000 $3,000.000 $1,350.000
SHORT RADIUS
LF 40.000 $75.000 $26.000 $23.000 $26.750 $100.000 $67.200
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 52.000 $1,500.000 $1,100.000 $1,000.000 $1,160.000 $2,000.000 $1,575.000
MTL BM GD FEN TRANS (NON - SYM)
EA 6.000 $1,200.000 $575.000 $500.000 $595.000 $1,985.000 $950.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 26.000 $750.000 $800.000 $700.000 $850.000 $750.000 $975.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 20.000 $480.000 $600.000 $515.000 $625.000 $1,100.000 $830.000
REMOVE METAL BEAM GUARD FENCE
LF 23,017.000 $3.000 $3.000 $3.000 $3.000 $7.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 38.000 $300.000 $175.000 $150.000 $180.000 $350.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $150.000 $85.000 $75.000 $90.000 $400.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 14.000 $300.000 $250.000 $225.000 $275.000 $300.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 76.000 $3,100.000 $3,200.000 $2,800.000 $3,325.000 $3,500.000 $2,760.000
GUARDRAIL END TREATMENT (REMOVE)
EA 83.000 $244.000 $230.000 $200.000 $250.000 $200.000 $250.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 188.000 $16.500 $23.000 $20.000 $25.000 $12.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 273.000 $30.000 $29.000 $25.000 $30.000 $30.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 129.000 $30.000 $29.000 $25.000 $30.000 $19.000 $40.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 6.000 $110.000 $46.000 $40.000 $50.000 $54.000 $150.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 41.000 $60.000 $46.000 $40.000 $50.000 $81.000 $75.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,196.000 $1.100 $1.500 $1.000 $1.000 $2.000 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,350.000 $2.500 $0.740 $0.850 $1.250 $1.250 $0.850
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 320.000 $4.000 $2.500 $3.000 $8.250 $4.000 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 247.000 $7.500 $6.000 $6.000 $13.850 $6.500 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 21.000 $140.000 $118.000 $118.000 $195.000 $142.500 $100.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 21.000 $170.000 $128.000 $128.000 $220.000 $165.500 $125.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 10.000 $700.000 $555.000 $555.000 $1,500.000 $500.000 $275.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 9.000 $700.000 $449.000 $449.000 $1,925.000 $1,250.000 $475.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 150.000 $40.000 $25.000 $25.000 $45.000 $45.000 $18.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,242.000 $1.000 $0.900 $0.900 $0.600 $1.000 $0.570
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 20,980.000 $0.800 $0.560 $0.560 $0.650 $0.850 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 88,758.000 $0.750 $0.550 $0.550 $0.660 $0.750 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,086.000 $0.750 $0.900 $0.900 $0.600 $1.000 $0.570
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 89,107.000 $0.750 $0.550 $0.550 $0.650 $0.750 $0.620
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 401.000 $4.750 $2.000 $2.000 $6.250 $4.000 $3.000
REFL PAV MRKR TY II-C-R
EA 1,050.000 $5.250 $3.490 $3.500 $6.350 $5.000 $3.250
CONCRETE RAIL REPAIR (IN-KIND)
LF 20.000 $550.000 $850.000 $325.000 $900.000 $529.000 $875.000
SP MIXES SP-C SAC-B PG70-22
TON 52,006.000 $110.000 $125.000 $130.000 $117.500 $117.500 $129.400
TACK COAT
GAL 47,277.000 $3.000 $4.000 $5.000 $0.010 $0.010 $0.230
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $2,000.000 $10,000.000 $15,000.000 $15,000.000 $30,000.000 $13,695.000
TMA (STATIONARY)
DAY 108.000 $250.000 $1,035.000 $500.000 $300.000 $300.000 $600.000
TMA (MOBILE OPERATION)
HR 356.000 $68.000 $80.000 $1.000 $0.010 $84.000 $83.160
Totals: $10,327,150.870 $11,275,366.650 $11,361,493.240 $11,365,205.410 $12,306,255.440 $13,007,591.515