ELLIS US 67 (0260-02-051)

Items: 19

County: ELLIS
Length: N/A
Highway: US 67
District: DALLAS
Control Number: 0260-02-051
DBE Goal: N/A
Project: STP 2B23(098)HES
Guaranty: N/A
Time: 119 WORKING DAYS
Engineer's Estimate: $1,110,149.70
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,110,149.70
$1,035,719.22
Over/Under Est: -6.7% -$74,430.48
Over/Under Est: -5.55% -$61,666.80
Amt Left: 1.23% $12,763.68
Over/Under Est: 12.82% $142,329.19
Amt Left: 20.93% $216,759.67
Delta: -19.46% -$203,995.99
Over/Under Est: 21.14% $234,640.05
Amt Left: 29.84% $309,070.53
Delta: -7.37% -$92,310.86
$1,401,829.00
Over/Under Est: 26.27% $291,679.30
Amt Left: 35.35% $366,109.78
Delta: -4.24% -$57,039.25

Bid Items & Bid Tabulations

19 Total 0 of 19
ELLIS  |  US 67  |  DALLAS  |  0260-02-051  |  08/03/2023  |  $1,110,149.70  |  STP 2B23(098)HES  |  HAZARD ELIM & SAFETY  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOUT 5 CONSTRUCTION LLC
GRATIOT CONSTRUCTION, LTD.
ROADWAY SPECIALTIES, INC.
SCR CIVIL CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
EXCAVATION (ROADWAY)
CY 680.000 $35.000 $32.000 $100.000 $5.350 $28.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 10,750.000 $2.000 $7.000 $0.950 $2.730 $7.250 $10.000
BLOCK SODDING
SY 7,836.000 $6.000 $6.000 $3.200 $8.190 $7.000 $10.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 2,914.000 $1.500 $8.000 $0.550 $2.250 $1.450 $1.000
VEGETATIVE WATERING
MG 1,793.000 $5.000 $10.000 $15.000 $75.000 $70.000 $20.000
RIPRAP (MOW STRIP)(4 IN)
CY 680.000 $500.000 $630.000 $470.000 $390.270 $676.000 $600.000
MOBILIZATION
LS 1.000 $100,922.700 $120,000.000 $105,000.000 $359,711.320 $122,000.000 $140,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $0.010 $10,000.000 $2,027.620 $4,200.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,050.000 $25.000 $1.000 $25.000 $41.430 $45.850 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 1,050.000 $10.000 $1.000 $10.000 $17.390 $17.200 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,015.000 $3.500 $10.000 $3.000 $3.780 $5.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,015.000 $1.000 $2.000 $1.000 $2.030 $1.150 $22.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 365.000 $8.000 $30.000 $7.000 $11.500 $11.500 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 365.000 $2.500 $2.000 $1.500 $4.250 $2.230 $9.000
CABLE BARRIER SYSTEM (TL-4)
LF 18,350.000 $16.000 $11.000 $14.500 $12.970 $14.750 $14.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 24.000 $4,900.000 $2,700.000 $3,850.000 $2,147.080 $2,500.000 $4,000.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 24.000 $25.000 $60.000 $190.000 $47.520 $135.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $2,000.000 $3,500.000 $767.810 $2,100.000 $16,500.000
TMA (STATIONARY)
DAY 115.000 $275.000 $0.010 $10.000 $68.250 $275.000 $250.000
Totals: $1,110,149.700 $1,035,719.220 $1,048,482.900 $1,252,478.890 $1,344,789.750 $1,401,829.000