|
|
PREPARING ROW
|
STA
|
33.180
|
$5,000.000
|
$2,725.000
|
$5,800.000
|
|
|
REMOVING STAB BASE & ASP PAV (18"-24")
|
SY
|
3,228.000
|
$22.000
|
$21.000
|
$40.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,745.000
|
$25.000
|
$15.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
18.810
|
$315.000
|
$1,000.000
|
$450.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,836.400
|
$35.000
|
$21.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
28.350
|
$250.000
|
$600.000
|
$450.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
33.180
|
$225.000
|
$2,150.000
|
$450.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
34,187.000
|
$3.500
|
$0.560
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,642.000
|
$1.750
|
$0.650
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
5,918.400
|
$8.500
|
$2.100
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
1,833.700
|
$30.000
|
$48.000
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
2,335.260
|
$36.000
|
$72.000
|
$25.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
75.400
|
$320.000
|
$450.000
|
$350.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
2,439.500
|
$15.000
|
$12.000
|
$12.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
1,973.800
|
$20.000
|
$16.000
|
$15.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,250.690
|
$20.000
|
$7.140
|
$6.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
1,042.230
|
$15.000
|
$9.030
|
$6.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
875.580
|
$15.000
|
$22.050
|
$300.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
39.840
|
$265.000
|
$745.500
|
$300.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
6,346.300
|
$7.500
|
$3.290
|
$20.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
2,115.700
|
$15.000
|
$4.340
|
$20.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
24.000
|
$750.000
|
$315.000
|
$350.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$166,295.910
|
$184,000.000
|
$230,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,500.000
|
$31,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
45.000
|
$75.000
|
$46.200
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
45.000
|
$25.000
|
$22.050
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
235.000
|
$50.000
|
$29.930
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
235.000
|
$20.000
|
$10.500
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
756.000
|
$15.000
|
$2.990
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
756.000
|
$4.500
|
$0.790
|
$22.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
16.000
|
$20.000
|
$8.400
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
16.000
|
$5.000
|
$4.200
|
$9.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,905.000
|
$6.500
|
$3.150
|
$5.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
263.500
|
$50.000
|
$30.450
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$850.000
|
$687.750
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$325.000
|
$887.250
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
1.000
|
$2,500.000
|
$2,362.500
|
$1,550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,300.000
|
$1,034.250
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,400.000
|
$1,275.750
|
$1,150.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$900.000
|
$630.000
|
$950.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,250.000
|
$10.000
|
$14.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
21.000
|
$90.000
|
$52.500
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
535.000
|
$3.250
|
$8.120
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
112.000
|
$4.000
|
$8.120
|
$6.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
296.000
|
$4.000
|
$3.150
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
855.000
|
$3.000
|
$2.100
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
303.000
|
$6.000
|
$3.830
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
12.000
|
$25.000
|
$8.930
|
$10.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$60.000
|
$78.750
|
$150.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
1,608.000
|
$5.000
|
$2.100
|
$2.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,619.000
|
$7.000
|
$3.830
|
$6.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
12,984.000
|
$0.500
|
$0.240
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,570.000
|
$0.600
|
$0.530
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,619.000
|
$2.750
|
$0.790
|
$1.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,757.000
|
$6.500
|
$1.050
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
10,182.000
|
$3.000
|
$0.790
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,209.000
|
$6.000
|
$0.790
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
67.000
|
$7.000
|
$7.350
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
131.000
|
$10.000
|
$7.350
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,375.000
|
$0.750
|
$0.540
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
567.000
|
$6.000
|
$1.050
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
12.000
|
$10.000
|
$3.150
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
3.000
|
$50.000
|
$52.500
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
12,928.000
|
$0.250
|
$0.140
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,608.000
|
$0.300
|
$0.320
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,619.000
|
$1.000
|
$0.530
|
$1.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$7,000.000
|
$3,500.000
|
$5,000.000
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
116.400
|
$120.000
|
$211.000
|
$200.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
932.600
|
$150.000
|
$154.000
|
$180.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
1,333.200
|
$165.000
|
$172.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
1,379.600
|
$6.500
|
$7.300
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
142.000
|
$225.000
|
$75.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
264.000
|
$95.000
|
$55.000
|
$55.000
|
|
Totals: |
$1,917,298.670
|
$1,859,514.122
|
$2,298,453.170
|