Show Job Controls
Bid Cobra

ELLIS US 287 (0172-04-050)

Items: 47

County: ELLIS
Length: 8.3090 MILES
Highway: US 287
District: DALLAS
Control Number: 0172-04-050
DBE Goal: 0.0%
Project: C 172-4-50
Guaranty: $100,000.00
Time: 227 WORKING DAYS
Engineer's Estimate: $15,294,018.60
Date: 10/01/2024 (1 year ago)
Contract Number: 10243012
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196244
Project Description: MILL AND INLAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
ELECIA MOORE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$15,294,018.60
$13,439,663.24
Over/Under Est: -12.12% -$1,854,355.36
Over/Under Est: -6.21% -$949,189.39
Amt Left: 6.74% $905,165.97
Over/Under Est: 4.02% $614,744.46
Amt Left: 18.37% $2,469,099.82
Delta: -10.90% -$1,563,933.85
$16,620,931.00
Over/Under Est: 8.68% $1,326,912.40
Amt Left: 23.67% $3,181,267.76
Delta: -4.48% -$712,167.94
Subcontractor Percentage Amount
HILBASH INVESTMENT LLC 0.00% $0.00
SURFACE PREPARATION TECHNOLOGIES, LLC 0.00% $0.00
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.00% $0.00
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

47 Total 0 of 47
ELLIS  |  US 287  |  DALLAS  |  0172-04-050  |  10/01/2024  |  $15,294,018.60  |  C 172-4-50  |  REHAB EXIST ROADWAY  |  227 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
FNH CONSTRUCTION, LLC
REMOV CONC (RIPRAP)
SY 1,560.000 $26.000 $8.190 $15.000 $38.000 $50.000
RMV (20") TRT/UNTRT BASE & ASPH PAV
SY 77.000 $20.000 $74.260 $80.000 $109.000 $100.000
EXCAV (ROADWAY)
CY 5,435.000 $35.000 $28.340 $18.500 $47.000 $20.000
EMBANK (FNL)(DC)(TY C2)
CY 5,290.000 $55.000 $69.680 $90.000 $106.000 $30.000
BACKFILL (TY A)
STA 406.000 $250.000 $411.310 $100.000 $300.000 $250.000
COMPOST MANUF TOPSOIL (4")
SY 1,200.000 $3.500 $7.200 $6.000 $4.885 $10.000
ROLL SODDING
SY 1,200.000 $7.000 $14.240 $6.000 $6.000 $10.000
VEGETATIVE WATERING
TGL 179.000 $5.000 $0.750 $1.000 $52.000 $30.000
SP MIXES SP-B PG64-22
TON 264.000 $140.000 $160.730 $200.000 $180.000 $165.000
SP MIXES SP-C SAC-A PG70-22
TON 63,439.000 $154.000 $128.040 $153.500 $153.000 $165.000
TACK COAT
GAL 63,390.000 $4.000 $0.100 $0.100 $4.450 $1.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 5,000.000 $100.000 $122.580 $50.000 $40.000 $120.000
PLANE ASPH CONC PAV(2")
SY 576,263.000 $3.000 $2.260 $1.500 $3.450 $4.000
RIPRAP (CONC) (CL B) (4 IN)
CY 188.000 $700.000 $785.000 $600.000 $800.000 $650.000
MOBILIZATION
LS 1.000 $1,390,365.330 $1,478,362.950 $1,400,000.000 $1,457,489.000 $1,600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $17,000.000 $45,550.000 $75,000.000 $30,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $14,613.750 $10,000.000 $14,000.000 $16,500.000
TMA (STATIONARY)
DAY 227.000 $400.000 $220.000 $1.000 $900.000 $250.000
TMA (MOBILE OPERATION)
HR 160.000 $65.000 $110.000 $1.000 $0.100 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000 $4.000 $6.000 $10.000 $5.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000 $1.500 $2.000 $2.000 $1.250 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $10.000 $5.000 $7.000 $6.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $2.000 $1.250 $2.000 $1.250 $9.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 162,268.000 $0.450 $0.140 $0.200 $0.210 $0.500
PIPE UNDERDRAINS (TY 8) (6")
LF 440.000 $47.500 $27.570 $42.000 $110.000 $45.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $725.000 $1,200.000 $1,200.000 $1,325.000 $1,500.000
RELOCATE LRSA
EA 1.000 $5,000.000 $5,000.000 $1,000.000 $5,850.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 76.000 $30.000 $52.000 $52.000 $56.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 76.000 $30.000 $52.000 $52.000 $56.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 15,467.000 $2.000 $2.000 $1.000 $1.250 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 6,303.000 $2.000 $2.000 $1.000 $1.250 $4.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 4,680.000 $1.700 $1.650 $1.000 $1.850 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 15,600.000 $1.000 $0.850 $0.850 $0.920 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 440.000 $9.500 $7.750 $6.500 $8.300 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 26.000 $170.000 $150.000 $140.000 $168.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 26.000 $185.000 $180.000 $150.000 $200.000 $250.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 150.000 $40.000 $65.000 $30.000 $72.000 $250.000
PAVEMENT SLER 6"
LF 16,483.000 $0.500 $0.250 $0.320 $0.280 $0.750
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 42,202.000 $0.900 $0.650 $0.600 $0.730 $0.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 120,410.000 $0.900 $0.560 $0.600 $0.630 $0.750
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 120,065.000 $0.900 $0.560 $0.600 $0.630 $0.750
REFL PAV MRKR TY II-C-R
EA 1,236.000 $4.800 $4.250 $3.900 $5.000 $6.000
ELIM EXT PM & MRKS (4")
LF 16,483.000 $0.550 $0.420 $0.500 $0.480 $1.000
PAV SURF PREP FOR MRK (6")
LF 18,139.000 $0.140 $0.170 $0.150 $0.200 $1.000
PAV SURF PREP FOR MRK (8")
LF 172.000 $0.180 $0.370 $0.300 $0.410 $6.000
PAV SURF PREP FOR MRK (24")
LF 24.000 $0.500 $2.000 $0.750 $2.180 $20.000
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 2,870.000 $5.000 $8.000 $6.500 $24.000 $10.000
Totals: $15,294,018.600 $13,439,663.240 $14,344,829.210 $15,908,763.060 $16,620,931.000