Show Job Controls
Bid Cobra

ELLIS US 287 (0172-04-048)

Items: 32

County: ELLIS
Length: N/A
Highway: US 287
District: DALLAS
Control Number: 0172-04-048
DBE Goal: N/A
Project: STP 2022(618)HES
Guaranty: N/A
Time: 309 WORKING DAYS
Engineer's Estimate: $3,097,934.72
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JUAN PARADES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$3,097,934.72
$3,186,711.85
Over/Under Est: 2.87% $88,777.13
$3,397,800.57
Over/Under Est: 9.68% $299,865.85
Amt Left: 6.62% $211,088.72
$3,419,161.05
Over/Under Est: 10.37% $321,226.33
Amt Left: 7.29% $232,449.20
Delta: -0.63% -$21,360.48
Over/Under Est: 29.76% $921,831.13
Amt Left: 26.14% $833,054.00
Delta: -17.57% -$600,604.80
Over/Under Est: 32.4% $1,003,680.78
Amt Left: 28.71% $914,903.65
Delta: -2.04% -$81,849.65
$4,607,061.00
Over/Under Est: 48.71% $1,509,126.28
Amt Left: 44.57% $1,420,349.15
Delta: -12.32% -$505,445.50

Bid Items & Bid Tabulations

32 Total 0 of 32
ELLIS  |  US 287  |  DALLAS  |  0172-04-048  |  06/01/2022  |  $3,097,934.72  |  STP 2022(618)HES  |  HAZARD ELIM & SAFETY  |  309 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRATIOT CONSTRUCTION, LTD.
VECTOR UTILITIES LLC
ALTUS CONSTRUCTION LLC
SCR CIVIL CONSTRUCTION, LLC
FOUTSCO PAVING COMPANY, LLC
FNH CONSTRUCTION, LLC
REMOVING STAB BASE & ASPH PAV (18"-22")
SY 8,053.000 $12.500 $15.000 $17.830 $11.890 $22.000 $12.000 $30.000
EXCAVATION (ROADWAY)
CY 2,754.000 $32.000 $25.000 $38.700 $29.840 $62.000 $50.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,502.000 $10.000 $40.000 $43.780 $19.830 $30.000 $50.000 $35.000
BACKFILL (TY A OR B)
STA 730.000 $150.000 $200.000 $239.410 $204.290 $185.000 $400.000 $250.000
COMPOST MANUF TOPSOIL (4")
SY 56,945.000 $1.000 $0.500 $0.690 $0.590 $4.000 $1.000 $2.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 56,945.000 $0.400 $0.680 $0.950 $0.810 $0.150 $0.050 $1.000
VEGETATIVE WATERING
MG 8,478.000 $5.000 $1.000 $12.610 $0.590 $43.000 $1.000 $35.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 673.000 $3.810 $6.000 $7.570 $7.500 $14.000 $10.000 $12.000
RIPRAP (MOW STRIP)(4 IN)
CY 2,754.000 $410.000 $300.000 $384.960 $385.550 $363.000 $200.000 $500.000
MOBILIZATION
LS 1.000 $281,630.520 $350,000.000 $135,912.020 $338,988.000 $334,000.000 $400,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $8,500.000 $1,800.000 $3,152.850 $9,515.450 $6,715.000 $25,000.000 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 800.000 $15.940 $25.000 $31.530 $37.260 $30.000 $27.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 800.000 $5.700 $6.000 $6.310 $16.090 $14.550 $13.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,630.000 $3.250 $4.000 $5.040 $4.460 $3.200 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,630.000 $1.000 $1.300 $1.890 $1.490 $0.700 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 570.000 $5.000 $8.000 $10.090 $8.330 $6.000 $7.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 570.000 $1.000 $1.050 $1.890 $1.190 $1.100 $1.000 $9.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 3,935.000 $0.180 $1.050 $1.510 $1.190 $4.000 $1.000 $1.000
CABLE BARRIER SYSTEM (TL-4)
LF 54,095.000 $11.500 $12.000 $13.940 $13.660 $13.580 $18.550 $16.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 52.000 $3,200.000 $4,750.000 $3,393.440 $2,880.790 $3,025.000 $10,000.000 $5,000.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 52.000 $105.560 $150.000 $25.220 $128.630 $100.000 $100.000 $100.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,220.000 $1.550 $2.350 $3.780 $1.190 $1.200 $2.150 $8.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,220.000 $1.750 $1.400 $1.770 $1.190 $1.200 $1.350 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 8.000 $120.000 $160.000 $227.010 $172.470 $165.000 $150.000 $250.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,275.000 $0.450 $0.500 $1.010 $1.190 $1.200 $0.480 $1.000
REFL PAV MRKR TY II-C-R
EA 60.000 $4.200 $8.000 $9.460 $5.950 $6.000 $7.000 $5.000
FULL - WIDTH MOWING
CYC 3.000 $10,000.000 $26,500.000 $6,305.700 $7,659.940 $10,200.000 $8,000.000 $5,000.000
SP MIXES SP-C SAC-B PG64-22
TON 1,111.000 $91.550 $275.000 $151.340 $192.690 $190.000 $200.000 $170.000
SP MIXES SP-C SAC-B PG70-22
TON 645.000 $87.440 $160.000 $151.340 $204.580 $175.000 $206.000 $170.000
TACK COAT
GAL 645.000 $1.790 $4.200 $7.570 $1.190 $5.000 $10.000 $12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,000.000 $15,000.000 $25,222.790 $3,568.290 $14,000.000 $20,000.000 $16,500.000
TMA (STATIONARY)
DAY 250.000 $215.000 $50.000 $353.120 $142.730 $225.000 $1.000 $250.000
Totals: $3,097,934.720 $3,186,711.850 $3,397,800.570 $3,419,161.050 $4,019,765.850 $4,101,615.500 $4,607,061.000