Show Job Controls
Bid Cobra

ELLIS IH 45 (0092-03-063)

Items: 45

County: ELLIS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-03-063
DBE Goal: N/A
Project: F 2023(781)
Guaranty: N/A
Time: 137 WORKING DAYS
Engineer's Estimate: $2,393,313.03
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,393,313.03
$2,192,848.50
Over/Under Est: -8.38% -$200,464.53
Over/Under Est: 1.08% $25,907.55
Amt Left: 10.32% $226,372.08

Bid Items & Bid Tabulations

45 Total 0 of 45
ELLIS  |  IH 45  |  DALLAS  |  0092-03-063  |  05/05/2023  |  $2,393,313.03  |  F 2023(781)  |  REHAB EXIST ROADWAY  |  137 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
O. TREVINO CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
REMOVING CONC (PAV)
SY 54.000 $54.000 $75.000 $52.500
REMOVING CONC (RIPRAP)
SY 504.000 $50.000 $20.000 $42.000
REMOVING CONC (SIDEWALKS)
SY 312.000 $45.000 $21.000 $42.000
REMOVING CONC (CURB)
LF 5,786.000 $8.500 $6.500 $5.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 54.000 $15.000 $50.000 $73.500
EXCAVATION (ROADWAY)
CY 718.000 $18.000 $40.000 $42.000
LIME (HYDRATED LIME (SLURRY))
TON 2.200 $600.000 $1,300.000 $500.000
LIME TRT (EXST MATL) (6")
SY 463.000 $10.000 $35.000 $21.000
CEMENT
TON 23.000 $275.000 $400.000 $420.000
CEMENT TREAT (EXIST MATL) (6")
SY 4,543.000 $4.500 $15.000 $7.350
PRIME COAT(MC-30 OR AE-P)
GAL 1,002.000 $11.000 $11.000 $10.000
CONC PVMT (JOINTED - CPCD) (8")
SY 405.000 $290.000 $140.000 $190.000
FULL - DEPTH REPAIR CPCD (8")
SY 3,751.000 $290.000 $200.000 $190.000
RETAINING WALL (CAST - IN - PLACE)
SF 1,895.000 $135.000 $85.000 $40.000
RIPRAP (CONC)(4 IN)
CY 24.000 $650.000 $2,000.000 $500.000
MOBILIZATION
LS 1.000 $217,574.000 $220,000.000 $517,750.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,500.000 $21,725.000 $52,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 150.000 $7.000 $16.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $1.070 $2.000 $5.000
CONC CURB (TY II)
LF 5,786.000 $38.000 $27.500 $22.500
CONC SIDEWALKS (6")
SY 312.000 $135.000 $260.000 $200.000
CURB RAMPS (TY 2)
EA 6.000 $3,000.000 $3,000.000 $4,750.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $700.000 $1,000.000 $1,000.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 154.000 $3.500 $1.750 $5.280
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 156.000 $7.500 $12.000 $9.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $220.000 $236.000 $218.900
PAVEMENT SEALER 6"
LF 14,720.000 $0.300 $0.300 $0.260
PAVEMENT SEALER 8"
LF 154.000 $1.400 $0.500 $2.200
PAVEMENT SEALER 24"
LF 156.000 $2.500 $2.500 $3.520
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,523.000 $0.650 $1.250 $1.130
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 6,091.000 $0.700 $1.250 $0.980
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,106.000 $0.700 $1.250 $0.980
REFL PAV MRKR TY II-C-R
EA 251.000 $5.500 $7.000 $6.300
ELIM EXT PAV MRK & MRKS (4")
LF 14,096.000 $0.500 $1.000 $0.580
ELIM EXT PAV MRK & MRKS (8")
LF 154.000 $1.500 $1.500 $4.620
ELIM EXT PAV MRK & MRKS (24")
LF 156.000 $3.800 $7.500 $6.380
PAV SURF PREP FOR MRK (6")
LF 14,720.000 $0.300 $0.150 $0.060
PAV SURF PREP FOR MRK (8")
LF 154.000 $0.320 $1.500 $0.110
PAV SURF PREP FOR MRK (24")
LF 156.000 $3.000 $1.500 $0.110
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $35.000 $50.000 $60.500
SP MIXES SP-B PG64-22
TON 170.000 $160.000 $375.000 $175.000
SP MIXES SP-C SAC-B PG70-22
TON 525.000 $170.000 $250.000 $190.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,750.000 $15,000.000 $8,000.000
TMA (STATIONARY)
DAY 120.000 $245.000 $225.000 $150.000
TMA (MOBILE OPERATION)
HR 250.000 $75.000 $90.000 $50.000
Totals: $2,393,313.030 $2,192,848.500 $2,419,220.580