ELLIS IH 45 (0092-03-057)

Items: 43

County: ELLIS
Length: N/A
Highway: IH 45
District: DALLAS
Control Number: 0092-03-057
DBE Goal: N/A
Project: C 92-3-57
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $2,710,186.91
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: REPAIR ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,710,186.91
$2,668,749.30
Over/Under Est: -1.53% -$41,437.61
Over/Under Est: -1.07% -$29,035.75
Amt Left: 0.46% $12,401.86
Over/Under Est: 8.67% $235,004.42
Amt Left: 10.36% $276,442.03
Delta: -9.85% -$264,040.17
$3,242,219.45
Over/Under Est: 19.63% $532,032.54
Amt Left: 21.49% $573,470.15
Delta: -10.09% -$297,028.12
$3,357,903.05
Over/Under Est: 23.9% $647,716.14
Amt Left: 25.82% $689,153.75
Delta: -3.57% -$115,683.60

Bid Items & Bid Tabulations

43 Total 0 of 43
ELLIS  |  IH 45  |  DALLAS  |  0092-03-057  |  01/05/2023  |  $2,710,186.91  |  C 92-3-57  |  REPAIR ROADWAY  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
ROY JORGENSEN ASSOCIATES, INC.
O. TREVINO CONSTRUCTION, LLC
IBCTX, LLC
FNH CONSTRUCTION, LLC
REMOVING STAB BASE AND ASPH PAV(8")
SY 1,510.000 $13.000 $16.500 $65.000 $16.000 $18.000 $20.000
CEMENT
TON 8.000 $225.000 $500.000 $300.000 $400.000 $360.000 $300.000
CEMENT TREAT (MX EXST MTL & NW BS) (6")
SY 1,510.000 $2.500 $15.000 $10.000 $20.000 $15.000 $15.000
PRIME COAT(MC-30 OR AE-P)
GAL 302.000 $5.000 $15.130 $20.000 $15.000 $17.000 $15.000
FULL - DEPTH REPAIR CRCP (8")
SY 2,859.000 $315.000 $300.000 $275.000 $222.000 $350.000 $265.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 242.000 $500.000 $610.000 $465.000 $475.000 $450.000 $200.000
FULL-DEPTH REPAIR CRCP (13"-15")
SY 225.000 $350.000 $395.000 $345.000 $550.000 $500.000 $200.000
FLOWABLE BACKFILL
CY 53.000 $240.000 $480.000 $225.000 $550.000 $400.000 $350.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 1,743.000 $200.000 $65.000 $150.000 $150.000 $180.000 $450.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 513.000 $238.000 $185.000 $225.000 $250.000 $200.000 $350.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 38.000 $190.000 $500.000 $280.000 $400.000 $400.000 $185.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 624.000 $50.000 $48.000 $35.000 $55.000 $45.000 $100.000
RAIL (TY 501)
LF 100.000 $300.000 $495.000 $350.000 $600.000 $500.000 $185.000
RAIL (TY T502)
LF 30.000 $30.000 $495.000 $375.000 $600.000 $500.000 $185.000
CLEAN EXIST CULVERTS
EA 2.000 $1,500.000 $12,750.000 $2,000.000 $8,000.000 $15,000.000 $2,650.000
MOBILIZATION
LS 1.000 $246,380.000 $180,000.000 $260,000.000 $294,000.000 $324,000.000 $330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,000.000 $9,250.000 $6,500.000 $17,000.000 $9,000.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 400.000 $5.000 $10.000 $6.000 $10.000 $15.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.000 $5.000 $2.000 $2.000 $5.000 $9.000
ALUMINUM SIGNS (TY A)
SF 572.000 $40.000 $33.000 $25.000 $32.000 $36.000 $35.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 44.000 $2,600.000 $2,145.000 $2,250.000 $3,000.000 $2,400.000 $2,000.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 44.000 $300.000 $825.000 $750.000 $1,000.000 $900.000 $1,000.000
REFL PAV MRK TY II (W) (ENTR GORE)
EA 32.000 $500.000 $280.000 $367.500 $400.000 $250.000 $500.000
REFL PAV MRK TY II (W) (EXIT GORE)
EA 32.000 $500.000 $361.250 $525.000 $560.000 $320.000 $500.000
PAVEMENT SEALER 4"
LF 96,627.000 $0.180 $0.210 $0.170 $0.200 $0.250 $0.250
PAVEMENT SEALER (ENTR GORE)
EA 32.000 $146.500 $231.250 $262.500 $280.000 $220.000 $250.000
PAVEMENT SEALER (EXIT GORE)
EA 32.000 $211.600 $593.750 $420.000 $445.000 $530.000 $650.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 42,785.000 $0.410 $0.810 $0.550 $0.550 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,770.000 $0.500 $0.910 $0.580 $0.600 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 43,072.000 $0.410 $0.810 $0.510 $0.550 $1.000 $1.000
REFL PAV MRKR TY II-C-R
EA 700.000 $5.000 $5.290 $4.980 $5.300 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 96,627.000 $0.440 $0.560 $0.490 $0.520 $1.000 $0.650
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 32.000 $300.000 $342.500 $498.750 $533.000 $300.000 $500.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 32.000 $300.000 $436.250 $577.500 $615.000 $400.000 $500.000
PAV SURF PREP FOR MRK (4")
LF 96,627.000 $0.080 $0.060 $0.010 $0.020 $0.100 $0.250
PAV SURF PREP FOR MRK (ENTR GORE)
EA 32.000 $181.250 $156.250 $26.250 $28.000 $150.000 $250.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 32.000 $366.670 $218.750 $157.500 $190.000 $200.000 $250.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 312.000 $500.000 $615.000 $425.000 $900.000 $600.000 $650.000
CARBON FIBER REINF POLYMER PROTECTION
SF 35.000 $175.000 $215.000 $100.000 $400.000 $500.000 $500.000
SP MIXES SP-D SAC-B PG70-22
TON 732.000 $150.000 $177.430 $255.000 $175.000 $225.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,750.000 $22,800.000 $4,500.000 $20,000.000 $30,000.000 $12,500.000
TMA (STATIONARY)
DAY 164.000 $200.000 $300.000 $400.000 $200.000 $100.000 $250.000
TMA (MOBILE OPERATION)
HR 750.000 $64.000 $50.000 $30.000 $60.000 $50.000 $65.000
Totals: $2,710,186.910 $2,668,749.300 $2,681,151.160 $2,945,191.330 $3,242,219.450 $3,357,903.050