EL PASO IH0010 (6462-61-001)

Items: 74

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6462-61-001
DBE Goal: 0.0%
Project: RMC - 646261001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,990,089.00
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,990,089.00
$1,934,332.50
Over/Under Est: -2.8% -$55,756.50
$2,131,750.00
Over/Under Est: 7.12% $141,661.00
Amt Left: 10.21% $197,417.50

Bid Items & Bid Tabulations

74 Total 0 of 74
EL PASO  |  IH0010  |  EL PASO  |  6462-61-001  |  04/04/2024  |  $1,990,089.00  |  RMC - 646261001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APACHE BARRICADE & SIGN
L&L COMPANY
RAIL (HANDRAIL)(TY E)
LF 25.000 $150.000 $120.000 $60.000
RAIL (HANDRAIL)(TY F)
LF 25.000 $175.000 $120.000 $60.000
MOBILIZATION
LS 1.000 $15,000.000 $1,000.000 $25,000.000
MOBILIZATION (EMERGENCY)
EA 5.000 $2,000.000 $1,000.000 $1,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $65.000 $49.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 450.000 $50.000 $23.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,250.000 $1,400.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $125.000 $25.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 220.000 $15.000 $9.000 $5.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $400.000 $150.000 $300.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $40.000 $45.000 $40.000
CHAIN LINK FENCE (REPAIR) (6')
LF 500.000 $25.000 $14.000 $30.000
CHAIN LINK FENCE (REMOVE)
LF 125.000 $5.000 $9.000 $10.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,800.000 $275.000 $450.000
CHAIN LINK FENCE (REPAIR) (4')
LF 100.000 $20.000 $15.000 $15.000
CHAIN LINK FENCE (INSTALL) (8')
LF 100.000 $40.000 $35.000 $50.000
CHAIN LINK FENCE (INSTALL) (4')
LF 500.000 $35.000 $16.000 $35.000
CHAIN LINK FENCE (REPAIR)(8')
LF 500.000 $55.000 $23.000 $25.000
CHAIN LINK FENCE (INSTALL)(7')
LF 250.000 $45.000 $29.000 $50.000
CHAIN LINK FENCE (REPAIR)(7')
LF 250.000 $45.000 $15.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 75.000 $25.000 $9.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 50.000 $31.000 $9.000 $15.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $31.000 $9.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 50.000 $30.000 $9.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 8,500.000 $30.000 $27.000 $24.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 125.000 $140.000 $145.000 $40.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 600.000 $55.000 $49.000 $30.000
RAISE RAIL ELEMENT
LF 100.000 $25.000 $17.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $70.000 $57.000 $70.000
REALIGN POSTS
EA 220.000 $11.000 $7.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $30.000 $24.000 $20.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 110.000 $3,100.000 $3,500.000 $4,000.000
REPLACE SGT OBJECT MARKER
EA 25.000 $20.000 $12.000 $20.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $220.000 $425.000 $400.000
REPLACE POSTS (TL-3)
EA 15.000 $145.000 $130.000 $250.000
REPLACE POSTS (TL-4)
EA 325.000 $250.000 $298.000 $400.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $260.000 $125.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $450.000 $125.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $280.000 $150.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $200.000 $150.000 $1,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 3.000 $1,200.000 $300.000 $1,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,750.000 $1,200.000 $1,500.000
REPLACE CABLE (TL-3)
LF 50.000 $5.000 $5.250 $5.000
REPLACE CABLE (TL-4)
LF 200.000 $7.000 $5.250 $7.000
CHECK / RE-TENSION CABLE
EA 5.000 $450.000 $275.000 $500.000
POST AND CABLE FENCE (REPAIR)
LF 1,250.000 $15.000 $19.000 $10.000
REMOVE AND REPLACE (TRACC)
EA 4.000 $6,000.000 $19,000.000 $30,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $27,200.000 $19,000.000 $50,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $22,000.000 $12,000.000 $30,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $31,000.000 $19,000.000 $45,000.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 8.000 $130.000 $250.000 $500.000
REPAIR (TRACC)
EA 2.000 $747.000 $250.000 $2,750.000
REPAIR (WIDE TRACC)
LF 125.000 $155.000 $175.000 $150.000
REPAIR REACT (N) (MISC HARDWARE)
EA 10.000 $800.000 $650.000 $500.000
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $3,200.000 $1,500.000 $4,000.000
REPAIR (REACT 350) (W)
EA 5.000 $3,200.000 $3,200.000 $3,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $850.000 $850.000 $500.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $3,200.000 $2,600.000 $4,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $19,000.000 $19,000.000 $3,500.000
REPAIR (SMTC) (N)
EA 10.000 $2,500.000 $2,500.000 $1,500.000
REMOVE AND REPLACE (SMTC) (W)
EA 2.000 $28,000.000 $18,000.000 $50,000.000
REPAIR (SMTC) (W)
EA 2.000 $2,000.000 $1,500.000 $2,000.000
REMOVE AND REPLACE (TAU II) (N)
EA 2.000 $26,500.000 $24,000.000 $30,000.000
REPAIR TAU II (N)
LF 100.000 $800.000 $1,200.000 $1,000.000
REPAIR TAU II (W)
LF 150.000 $1,100.000 $1,600.000 $1,000.000
REMOVE AND REPLACE TAU II (W)
EA 4.000 $30,000.000 $32,000.000 $40,000.000
REPAIR (NARROW REACT 350)
EA 2.000 $1,100.000 $875.000 $1,000.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $18,000.000 $19,000.000 $30,000.000
REPAIR (TAU)(MASH)(N)
LF 10.000 $250.000 $800.000 $1,000.000
REMOVE AND REPLACE (NARROW DELTA)
EA 2.000 $30,000.000 $21,800.000 $26,000.000
REPAIR (NARROW DELTA)
EA 2.000 $6,000.000 $1,800.000 $5,000.000
STONE MASONRY (ROCK WALL)
SF 500.000 $16.000 $43.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $86.000 $50.000 $70.000
TMA (STATIONARY)
DAY 400.000 $350.000 $135.000 $1.000
Totals: $1,990,089.000 $1,934,332.500 $2,131,750.000