Show Job Controls
Bid Cobra

EL PASO IH0010 (6388-46-001)

Items: 68

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6388-46-001
DBE Goal: N/A
Project: RMC - 638846001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $755,965.00
Date: 10/07/2021 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL, CHAINLINK FENCE & ROCKWALL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$755,965.00
$992,133.00
Over/Under Est: 31.24% $236,168.00
$1,320,290.00
Over/Under Est: 74.65% $564,325.00
Amt Left: 33.08% $328,157.00

Bid Items & Bid Tabulations

68 Total 0 of 68
EL PASO  |  IH0010  |  EL PASO  |  6388-46-001  |  10/07/2021  |  $755,965.00  |  RMC - 638846001  |  METAL BEAM GUARDRAIL, CHAINLINK FENC...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APACHE BARRICADE & SIGN
DIGG COMMERCIAL, LLC
RAIL (HANDRAIL)(TY A)
LF 25.000 $180.000 $25.000 $200.000
RAIL (HANDRAIL)(TY B)
LF 50.000 $150.000 $25.000 $210.000
RAIL (HANDRAIL)(TY C)
LF 25.000 $160.000 $25.000 $225.000
RAIL (HANDRAIL)(TY D)
LF 50.000 $160.000 $25.000 $220.000
RAIL (HANDRAIL)(TY E)
LF 10.000 $180.000 $25.000 $320.000
RAIL (HANDRAIL)(TY F)
LF 10.000 $200.000 $25.000 $340.000
MOBILIZATION
LS 1.000 $25,000.000 $1,000.000 $100,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 15.000 $30.000 $45.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $30.000 $45.000 $60.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,310.000 $1,100.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $130.000 $84.000 $250.000
REMOVE METAL BEAM GUARD FENCE
LF 10.000 $10.000 $18.000 $44.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $425.000 $375.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,550.000 $900.000 $3,500.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $21,000.000 $17,000.000 $30,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 500.000 $35.000 $13.000 $40.000
CHAIN LINK FENCE (REPAIR) (6')
LF 500.000 $20.000 $8.000 $20.000
CHAIN LINK FENCE (REMOVE)
LF 125.000 $5.000 $2.000 $15.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,800.000 $1,300.000 $2,500.000
CHAIN LINK FENCE (REPAIR) (4')
LF 100.000 $15.000 $8.000 $30.000
CHAIN LINK FENCE (INSTALL) (8')
LF 100.000 $25.000 $29.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $30.000 $17.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $45.000 $16.000 $50.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $60.000 $19.000 $54.000
RAISE RAIL ELEMENT
LF 100.000 $35.000 $15.000 $25.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $70.000 $48.000 $100.000
REALIGN POSTS
EA 150.000 $45.000 $5.000 $30.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $20.000 $8.000 $32.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $22.000 $3,100.000 $3,100.000
REPLACE SGT OBJECT MARKER
EA 25.000 $60.000 $13.000 $60.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $240.000 $200.000
REPLACE POSTS (TL-3)
EA 15.000 $115.000 $123.000 $150.000
REPLACE POSTS (TL-4)
EA 300.000 $160.000 $210.000 $170.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $300.000 $125.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $400.000 $125.000 $350.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $400.000 $275.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $400.000 $275.000 $350.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 3.000 $1,300.000 $1,370.000 $1,800.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,000.000 $1,700.000 $2,100.000
REPLACE CABLE (TL-3)
LF 50.000 $6.000 $4.950 $10.000
REPLACE CABLE (TL-4)
LF 50.000 $8.000 $4.950 $12.000
CHECK / RE-TENSION CABLE
EA 5.000 $450.000 $495.000 $10.000
POST AND CABLE FENCE (REPAIR)
LF 600.000 $10.000 $5.000 $20.000
REMOVE AND REPLACE (TRACC)
EA 2.000 $13,500.000 $18,304.000 $20,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $27,200.000 $28,840.000 $21,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $22,000.000 $22,130.000 $25,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $31,000.000 $32,000.000 $30,000.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 8.000 $300.000 $485.000 $500.000
REPAIR (WIDE TRACC)
LF 25.000 $155.000 $150.000 $2,500.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $150.000 $850.000 $2,400.000
REPAIR REACT (N) (CYLINDERS)
EA 5.000 $4,300.000 $3,100.000 $120.000
REPAIR (REACT 350) (W)
EA 5.000 $3,200.000 $3,200.000 $5,000.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $350.000 $850.000 $2,000.000
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $7,200.000 $3,100.000 $3,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $21,600.000 $22,950.000 $14,000.000
REPAIR (SMTC) (N)
EA 1.000 $815.000 $1,700.000 $3,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $28,000.000 $24,000.000 $2,500.000
REPAIR (SMTC) (W)
EA 1.000 $1,000.000 $1,900.000 $2,500.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $26,500.000 $25,900.000 $32,000.000
REPAIR TAU II (N)
LF 10.000 $300.000 $1,800.000 $350.000
REPAIR TAU II (W)
LF 20.000 $300.000 $1,800.000 $250.000
REMOVE AND REPLACE TAU II (W)
EA 2.000 $2,500.000 $34,000.000 $26,000.000
REPAIR (NARROW REACT 350)
EA 2.000 $1,100.000 $700.000 $1,500.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $24,000.000 $26,000.000 $16,000.000
REPAIR (TAU)(MASH)(N)
LF 10.000 $250.000 $225.000 $1,000.000
STONE MASONRY (ROCK WALL)
SF 500.000 $13.000 $9.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $150.000 $50.000 $1,500.000
TMA (STATIONARY)
DAY 150.000 $375.000 $165.000 $500.000
Totals: $755,965.000 $992,133.000 $1,320,290.000