Show Job Controls
Bid Cobra

EL PASO IH0010 (6373-74-001)

Items: 79

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6373-74-001
DBE Goal: N/A
Project: RMC - 637374001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $873,830.00
Date: 12/02/2020 (5 years ago)
Contract Number: N/A
Type: METAL BEAM, CHAINLINK FENCE & ROCK WALL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$873,830.00
$728,749.50
Over/Under Est: -16.6% -$145,080.50
Over/Under Est: -8.19% -$71,543.00
Amt Left: 10.09% $73,537.50
Over/Under Est: -3.67% -$32,040.80
Amt Left: 15.51% $113,039.70
Delta: -4.92% -$39,502.20
Over/Under Est: -0.47% -$4,130.00
Amt Left: 19.34% $140,950.50
Delta: -3.32% -$27,910.80

Bid Items & Bid Tabulations

79 Total 0 of 79
EL PASO  |  IH0010  |  EL PASO  |  6373-74-001  |  12/02/2020  |  $873,830.00  |  RMC - 637374001  |  METAL BEAM, CHAINLINK FENCE & ROCK W...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APACHE BARRICADE & SIGN
E. G. L. CONSTRUCTION, INC.
SYNERGY PROJECT CONTRACTORS, INC.
LESNA CONSTRUCTION, INC.
RAIL (HANDRAIL)(TY A)
LF 50.000 $95.000 $75.000 $95.000 $120.840 $125.000
RAIL (HANDRAIL)(TY B)
LF 100.000 $120.000 $75.000 $105.000 $142.500 $150.000
RAIL (HANDRAIL)(TY C)
LF 50.000 $136.000 $75.000 $180.000 $153.900 $210.000
RAIL (HANDRAIL)(TY D)
LF 75.000 $93.000 $75.000 $190.000 $159.600 $250.000
RAIL (HANDRAIL)(TY E)
LF 20.000 $115.000 $75.000 $185.000 $171.000 $210.000
RAIL (HANDRAIL)(TY F)
LF 20.000 $136.000 $75.000 $205.000 $188.100 $250.000
MOBILIZATION
LS 1.000 $10,000.000 $1,000.000 $10,000.000 $22,800.000 $30,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $35.000 $27.000 $32.000 $29.640 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $35.000 $28.000 $25.000 $28.500 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,730.000 $900.000 $1,500.000 $1,140.000 $1,450.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $360.000 $95.000 $500.000 $114.000 $575.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $12.000 $9.000 $5.000 $9.120 $5.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $330.000 $125.000 $600.000 $142.500 $400.000
CABLE BARRIER SYSTEM (TL-4)
LF 100.000 $30.000 $12.000 $26.000 $14.820 $12.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 2.000 $500.000 $2,100.000 $29.000 $2,280.000 $1,950.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $22,000.000 $23,760.000 $15,000.000 $14,250.000 $23,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $27,000.000 $23,500.000 $16,000.000 $24,510.000 $25,500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 1,000.000 $31.000 $34.500 $14.000 $17.100 $22.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $9.000 $18.500 $21.000 $14.820 $8.000
CHAIN LINK FENCE (REMOVE)
LF 250.000 $7.000 $2.250 $8.000 $2.280 $5.000
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,720.000 $1,480.000 $800.000 $1,710.000 $2,500.000
CHAIN LINK FENCE (REPAIR) (4')
LF 200.000 $18.000 $19.000 $28.000 $12.540 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $18.000 $12.500 $16.500 $15.960 $9.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $30.000 $28.000 $16.000 $30.780 $19.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $36.000 $28.000 $35.000 $27.360 $30.000
RAISE RAIL ELEMENT
LF 200.000 $10.000 $14.000 $19.000 $13.680 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $60.000 $45.000 $29.000 $42.180 $44.000
REALIGN POSTS
EA 300.000 $12.000 $9.000 $15.000 $10.260 $20.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $35.000 $12.000 $35.000 $19.380 $20.000
REMOVE & REPLACE BLOCKOUT
EA 50.000 $24.000 $15.000 $10.000 $17.100 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $26.000 $14.000 $16.000 $20.520 $28.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 400.000 $46.000 $49.000 $33.000 $79.800 $38.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $300.000 $36.000 $150.000 $217.300 $400.000
REPLACE TERMINAL ANCHOR POSTS
EA 150.000 $25.000 $75.000 $240.000 $148.200 $300.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $3,100.000 $2,800.000 $1,500.000 $2,280.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $1,500.000 $925.000 $1,800.000 $1,368.000 $900.000
REPLACE SGT OBJECT MARKER
EA 20.000 $25.000 $18.000 $90.000 $20.520 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $190.000 $275.000 $100.000 $199.500 $300.000
REPLACE POSTS (TL-3)
EA 100.000 $100.000 $127.000 $100.000 $128.820 $125.000
REPLACE POSTS (TL-4)
EA 300.000 $170.000 $145.000 $150.000 $153.900 $165.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $300.000 $175.000 $5.000 $165.300 $350.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 3.000 $300.000 $175.000 $100.000 $262.200 $350.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 4.000 $300.000 $225.000 $1,000.000 $228.000 $850.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 4.000 $120.000 $225.000 $1,000.000 $256.500 $850.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $895.000 $725.000 $600.000 $855.000 $1,350.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,075.000 $1,200.000 $600.000 $969.000 $1,800.000
REPLACE CABLE (TL-3)
LF 250.000 $3.000 $5.000 $10.000 $5.810 $6.000
REPLACE CABLE (TL-4)
LF 250.000 $8.000 $5.000 $10.000 $9.120 $6.000
CHECK / RE-TENSION CABLE
EA 5.000 $600.000 $300.000 $1,000.000 $456.000 $500.000
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $3.500 $5.000 $100.000 $3.420 $10.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 2.000 $300.000 $125.000 $600.000 $171.000 $750.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 20.000 $150.000 $90.000 $50.000 $142.500 $25.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 2.000 $350.000 $250.000 $1,300.000 $307.800 $600.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $110.000 $65.000 $110.000 $96.900 $120.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 20.000 $110.000 $85.000 $110.000 $108.300 $25.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $15,340.000 $15,840.000 $15,500.000 $16,359.000 $16,250.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $26,840.000 $23,500.000 $23,000.000 $32,755.000 $26,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $20,840.000 $21,500.000 $20,000.000 $22,287.000 $23,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $28,735.000 $31,500.000 $31,200.000 $36,195.000 $34,500.000
REPAIR (WIDE TRACC)
LF 50.000 $145.000 $145.000 $150.000 $159.600 $150.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $120.000 $1,130.000 $250.000 $210.900 $300.000
REPAIR REACT (N) (CYLINDERS)
EA 2.000 $3,580.000 $3,172.000 $600.000 $4,446.000 $4,650.000
REPAIR (QUAD) (W) (BAY)
EA 2.000 $800.000 $900.000 $1,000.000 $741.000 $3,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $300.000 $1,200.000 $500.000 $456.000 $500.000
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $9,240.000 $3,500.000 $500.000 $7,410.000 $4,550.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $25,635.000 $21,000.000 $6,444.000 $26,220.000 $27,000.000
REPAIR TAU II (N)
LF 20.000 $360.000 $275.000 $155.000 $285.000 $375.000
REPAIR TAU II (W)
LF 20.000 $360.000 $275.000 $300.000 $364.800 $375.000
REPAIR (QUAD) (W) (NOSE)
EA 5.000 $800.000 $800.000 $900.000 $741.000 $1,750.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 5.000 $800.000 $1,200.000 $900.000 $684.000 $200.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $26,460.000 $25,800.000 $19,000.000 $23,484.000 $25,500.000
REPAIR REACT CABLE 350
LF 100.000 $50.000 $24.000 $25.000 $37.800 $30.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 1.000 $18,000.000 $21,800.000 $20,000.000 $8,436.000 $23,100.000
REPAIR (QUADGUARD)(MASH)(N)
LF 20.000 $267.000 $75.000 $250.000 $54.000 $30.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $20,035.000 $21,900.000 $25,000.000 $24,510.000 $23,000.000
REPAIR (TAU)(MASH)(N)
LF 20.000 $230.000 $175.000 $280.000 $393.300 $250.000
STONE MASONRY (ROCK WALL)
SF 500.000 $25.000 $9.500 $18.000 $11.400 $18.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $120.000 $35.000 $40.000 $114.000 $150.000
TMA (STATIONARY)
DAY 150.000 $275.000 $150.000 $200.000 $171.000 $100.000
Totals: $873,830.000 $728,749.500 $802,287.000 $841,789.200 $869,700.000