EL PASO IH0010 (6372-23-001)

Items: 67

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6372-23-001
DBE Goal: N/A
Project: RMC - 637223001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $873,811.00
Date: 11/04/2020 (5 years ago)
Contract Number: N/A
Type: MBGF, CHAINLINK FENCE & ROCK WALL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$873,811.00
Over/Under Est: -9.1% -$79,517.80
Over/Under Est: -8.69% -$75,911.00
Amt Left: 0.45% $3,606.80
Over/Under Est: -2.06% -$17,985.00
Amt Left: 7.75% $61,532.80
Delta: -7.26% -$57,926.00
$878,650.00
Over/Under Est: 0.55% $4,839.00
Amt Left: 10.62% $84,356.80
Delta: -2.67% -$22,824.00
Over/Under Est: 5.19% $45,384.00
Amt Left: 15.72% $124,901.80
Delta: -4.61% -$40,545.00
Over/Under Est: 19.99% $174,639.00
Amt Left: 32% $254,156.80
Delta: -14.06% -$129,255.00
Over/Under Est: 21.88% $191,160.25
Amt Left: 34.08% $270,678.05
Delta: -1.58% -$16,521.25

Bid Items & Bid Tabulations

67 Total 0 of 67
EL PASO  |  IH0010  |  EL PASO  |  6372-23-001  |  11/04/2020  |  $873,811.00  |  RMC - 637223001  |  MBGF, CHAINLINK FENCE & ROCK WALL RE...  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SYNERGY PROJECT CONTRACTORS, INC.
APACHE BARRICADE & SIGN
E. G. L. CONSTRUCTION, INC.
MIJELUM, L.L.C.
LESNA CONSTRUCTION, INC.
DOUBLE H CONTRACTING INC.
MARTINEZ BROS. CONTRACTORS, LLC
RAIL (HANDRAIL)(TY A)
LF 50.000 $95.000 $194.700 $50.000 $95.000 $150.000 $125.000 $195.000 $106.250
RAIL (HANDRAIL)(TY B)
LF 100.000 $120.000 $165.200 $50.000 $105.000 $80.000 $150.000 $195.000 $118.750
RAIL (HANDRAIL)(TY C)
LF 50.000 $136.000 $177.000 $50.000 $180.000 $150.000 $220.000 $195.000 $206.250
RAIL (HANDRAIL)(TY D)
LF 75.000 $93.000 $177.000 $50.000 $190.000 $120.000 $270.000 $195.000 $231.250
RAIL (HANDRAIL)(TY E)
LF 20.000 $115.000 $194.700 $50.000 $185.000 $120.000 $220.000 $195.000 $218.750
RAIL (HANDRAIL)(TY F)
LF 20.000 $136.000 $218.300 $50.000 $205.000 $150.000 $270.000 $195.000 $243.750
MOBILIZATION
LS 1.000 $10,000.000 $20,000.000 $1,000.000 $15,000.000 $20,000.000 $80,000.000 $90,000.000 $75,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $35.000 $30.680 $30.000 $28.000 $50.000 $35.000 $40.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $35.000 $29.500 $30.000 $32.000 $150.000 $40.000 $50.000 $115.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,730.000 $1,180.000 $900.000 $950.000 $300.000 $1,750.000 $1,400.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $360.000 $88.500 $325.000 $500.000 $500.000 $700.000 $600.000 $475.000
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $12.000 $11.800 $15.000 $19.000 $150.000 $20.000 $25.000 $15.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $330.000 $147.500 $450.000 $500.000 $150.000 $500.000 $350.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,670.000 $1,180.000 $1,200.000 $600.000 $700.000 $2,000.000 $4,000.000 $718.750
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $25,785.000 $18,231.000 $19,000.000 $15,176.000 $16,000.000 $18,500.000 $14,000.000 $16,470.000
CHAIN LINK FENCE (INSTALL) (6')
LF 1,000.000 $31.000 $17.700 $19.000 $29.000 $20.000 $20.000 $20.000 $17.500
CHAIN LINK FENCE (REPAIR) (6')
LF 1,000.000 $9.000 $15.340 $19.000 $29.000 $10.000 $8.000 $50.000 $15.000
CHAIN LINK FENCE (REMOVE)
LF 250.000 $7.000 $2.360 $12.000 $4.000 $5.000 $5.000 $20.000 $4.500
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 2.000 $1,720.000 $1,770.000 $1,200.000 $1,500.000 $500.000 $2,000.000 $2,500.000 $2,000.000
CHAIN LINK FENCE (REPAIR) (4')
LF 200.000 $18.000 $12.980 $32.000 $22.000 $10.000 $8.000 $50.000 $15.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $18.000 $18.000 $15.000 $16.000 $23.000 $11.000 $18.000 $16.250
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 200.000 $30.000 $31.860 $35.000 $30.000 $25.000 $20.000 $40.000 $50.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $36.000 $28.320 $35.000 $34.000 $20.000 $35.000 $50.000 $50.000
RAISE RAIL ELEMENT
LF 200.000 $10.000 $14.160 $15.000 $50.000 $5.000 $10.000 $20.000 $45.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $60.000 $43.660 $50.000 $60.000 $80.000 $52.000 $65.000 $56.250
REALIGN POSTS
EA 300.000 $12.000 $10.620 $10.000 $35.000 $30.000 $20.000 $50.000 $11.250
REMOVE & REPLACE BLOCKOUT
EA 60.000 $24.000 $17.700 $10.000 $35.000 $30.000 $17.000 $60.000 $81.250
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,100.000 $2,360.000 $2,700.000 $2,300.000 $2,500.000 $2,950.000 $3,150.000 $3,500.000
REPLACE SGT OBJECT MARKER
EA 50.000 $25.000 $14.160 $15.000 $50.000 $30.000 $35.000 $50.000 $81.250
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $190.000 $206.500 $250.000 $500.000 $100.000 $280.000 $10.000 $350.000
REPLACE POSTS (TL-3)
EA 30.000 $100.000 $133.340 $150.000 $120.000 $100.000 $175.000 $300.000 $162.500
REPLACE POSTS (TL-4)
EA 100.000 $170.000 $159.300 $175.000 $100.000 $100.000 $200.000 $350.000 $175.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $300.000 $171.100 $225.000 $500.000 $200.000 $350.000 $400.000 $400.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $300.000 $271.400 $225.000 $500.000 $200.000 $350.000 $400.000 $437.500
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $300.000 $236.000 $250.000 $1,500.000 $200.000 $1,000.000 $500.000 $600.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $120.000 $265.500 $250.000 $1,500.000 $200.000 $1,000.000 $500.000 $625.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $895.000 $885.000 $1,000.000 $90.000 $2,000.000 $1,500.000 $1,000.000 $437.500
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,075.000 $1,003.000 $1,500.000 $90.000 $2,000.000 $2,000.000 $1,200.000 $625.000
REPLACE CABLE (TL-3)
LF 100.000 $3.000 $6.020 $5.000 $10.000 $10.000 $10.000 $20.000 $10.000
REPLACE CABLE (TL-4)
LF 100.000 $8.000 $9.440 $5.000 $10.000 $10.000 $10.000 $20.000 $11.250
CHECK / RE-TENSION CABLE
EA 5.000 $600.000 $472.000 $300.000 $600.000 $50.000 $500.000 $1,000.000 $537.500
POST AND CABLE FENCE (REPAIR)
LF 500.000 $5.000 $2.950 $5.000 $5.000 $30.000 $10.000 $5.000 $17.500
REMOVE AND REPLACE (TRACC)
EA 1.000 $17,886.000 $16,933.000 $19,000.000 $14,500.000 $16,000.000 $19,000.000 $14,000.000 $16,470.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $31,000.000 $33,925.000 $29,000.000 $24,075.000 $30,000.000 $35,000.000 $100.000 $30,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $23,850.000 $23,069.000 $19,000.000 $21,400.000 $24,000.000 $25,000.000 $18,000.000 $35,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $33,890.000 $37,465.000 $31,000.000 $35,000.000 $31,000.000 $36,000.000 $24,000.000 $37,187.500
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 1.000 $295.000 $413.000 $450.000 $3,100.000 $1,000.000 $600.000 $1,000.000 $343.750
REPAIR (WIDE TRACC)
LF 50.000 $145.000 $165.200 $225.000 $200.000 $1,000.000 $50.000 $100.000 $175.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $120.000 $94.400 $900.000 $300.000 $500.000 $1,200.000 $250.000 $2,250.000
REPAIR REACT (N) (CYLINDERS)
EA 5.000 $3,580.000 $4,602.000 $3,000.000 $500.000 $500.000 $5,000.000 $3,000.000 $4,750.000
REPAIR (REACT 350) (W)
EA 2.000 $4,770.000 $3,540.000 $3,000.000 $250.000 $1,000.000 $3,000.000 $2,500.000 $3,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $295.000 $265.500 $1,000.000 $600.000 $500.000 $1,400.000 $500.000 $1,187.500
REPAIR REACT (W) (CYLINDERS)
EA 2.000 $10,735.000 $7,410.000 $3,000.000 $1,000.000 $500.000 $4,000.000 $10,000.000 $11,875.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $26,235.000 $21,240.000 $21,000.000 $22,000.000 $20,000.000 $25,000.000 $24,000.000 $22,500.000
REPAIR (SMTC) (N)
EA 1.000 $1,135.000 $826.000 $1,700.000 $500.000 $500.000 $3,200.000 $1,200.000 $3,750.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $31,000.000 $28,320.000 $27,000.000 $25,000.000 $20,000.000 $30,000.000 $26,000.000 $22,500.000
REPAIR (SMTC) (W)
EA 1.000 $1,195.000 $1,003.000 $3,200.000 $500.000 $3,500.000 $3,500.000 $1,400.000 $3,500.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $25,635.000 $27,140.000 $22,000.000 $23,000.000 $25,000.000 $27,000.000 $22,000.000 $28,750.000
REPAIR TAU II (N)
LF 20.000 $360.000 $295.000 $750.000 $250.000 $200.000 $250.000 $500.000 $500.000
REPAIR TAU II (W)
LF 20.000 $360.000 $295.000 $900.000 $250.000 $100.000 $250.000 $500.000 $525.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $32,885.000 $24,308.000 $32,000.000 $30,000.000 $18,000.000 $27,000.000 $26,000.000 $2,750.000
REPAIR (NARROW REACT 350)
EA 2.000 $1,790.000 $1,062.000 $2,300.000 $1,000.000 $500.000 $1,500.000 $5,000.000 $562.500
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $20,035.000 $25,370.000 $25,000.000 $19,000.000 $22,000.000 $23,000.000 $25,000.000 $27,500.000
REPAIR (TAU)(MASH)(N)
LF 20.000 $230.000 $289.100 $750.000 $1,000.000 $300.000 $250.000 $500.000 $2,500.000
STONE MASONRY (ROCK WALL)
SF 1,000.000 $25.000 $11.800 $16.000 $25.000 $20.000 $15.000 $60.000 $56.250
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $120.000 $118.000 $40.000 $280.000 $1,000.000 $200.000 $100.000 $562.500
TMA (STATIONARY)
DAY 150.000 $275.000 $177.000 $290.000 $600.000 $500.000 $200.000 $250.000 $212.500
Totals: $873,811.000 $794,293.200 $797,900.000 $855,826.000 $878,650.000 $919,195.000 $1,048,450.000 $1,064,971.250