EL PASO IH0010 (6349-87-001)

Items: 49

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6349-87-001
DBE Goal: N/A
Project: RMC - 634987001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $589,520.00
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$589,520.00
$690,550.00
Over/Under Est: 17.14% $101,030.00
Over/Under Est: 27.78% $163,791.00
Amt Left: 9.09% $62,761.00
Over/Under Est: 30.93% $182,365.00
Amt Left: 11.78% $81,335.00
Delta: -2.47% -$18,574.00
Over/Under Est: 65.39% $385,480.00
Amt Left: 41.19% $284,450.00
Delta: -26.31% -$203,115.00

Bid Items & Bid Tabulations

49 Total 0 of 49
EL PASO  |  IH0010  |  EL PASO  |  6349-87-001  |  12/04/2019  |  $589,520.00  |  RMC - 634987001  |  METAL BEAM GUARDRAIL FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E. G. L. CONSTRUCTION, INC.
APACHE BARRICADE & SIGN
LESNA CONSTRUCTION, INC.
DOUBLE H CONTRACTING INC.
MOBILIZATION
LS 1.000 $15,000.000 $60,000.000 $100.000 $50,000.000 $90,000.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $8.000 $19.000 $5.000 $12.000 $15.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $390.000 $600.000 $250.000 $250.000 $500.000
CABLE BARRIER SYSTEM (TL-4)
LF 100.000 $10.000 $30.000 $10.000 $40.000 $40.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 1.000 $2,600.000 $500.000 $1,800.000 $1,750.000 $4,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $18.000 $19.000 $13.000 $14.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $30.000 $75.000 $25.000 $27.000 $50.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $30.000 $35.000 $30.000 $40.000 $60.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $55.000 $29.000 $55.000 $70.000 $150.000
REALIGN POSTS
EA 200.000 $15.000 $10.000 $10.000 $30.000 $125.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 70.000 $20.000 $35.000 $17.000 $25.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $28.000 $26.000 $28.000 $40.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 450.000 $38.000 $46.000 $100.000 $45.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $35.000 $300.000 $100.000 $2,190.000 $500.000
REPLACE TERMINAL ANCHOR POSTS
EA 150.000 $140.000 $25.000 $292.000 $250.000 $700.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $940.000 $1,500.000 $1,400.000 $1,000.000 $2,500.000
REPLACE SGT OBJECT MARKER
EA 20.000 $22.000 $25.000 $30.000 $50.000 $150.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $255.000 $100.000 $250.000 $300.000 $250.000
REPLACE POSTS (TL-4)
EA 250.000 $150.000 $120.000 $175.000 $155.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $170.000 $500.000 $190.000 $319.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 3.000 $170.000 $500.000 $190.000 $319.000 $250.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 4.000 $280.000 $1,500.000 $300.000 $1,000.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $1,200.000 $90.000 $700.000 $3,035.000 $500.000
REPLACE CABLE (TL-4)
LF 250.000 $4.000 $10.000 $6.000 $20.000 $20.000
POST AND CABLE FENCE (REMOVAL)
LF 100.000 $5.000 $3.500 $3.000 $10.000 $25.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 2.000 $45.000 $300.000 $50.000 $460.000 $500.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 20.000 $4.000 $150.000 $20.000 $50.000 $50.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 2.000 $45.000 $350.000 $50.000 $1,500.000 $500.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $18.000 $110.000 $50.000 $60.000 $150.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 20.000 $4.000 $110.000 $5.000 $35.000 $50.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $14,350.000 $16,000.000 $16,416.000 $19,500.000 $20,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $23,350.000 $26,000.000 $27,203.000 $35,000.000 $20,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $17,350.000 $21,000.000 $21,904.000 $28,000.000 $20,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $27,620.000 $31,000.000 $32,826.000 $42,000.000 $20,000.000
REPAIR (TRACC)
LF 50.000 $95.000 $200.000 $195.000 $112.000 $500.000
REPAIR (WIDE TRACC)
LF 50.000 $100.000 $200.000 $195.000 $180.000 $500.000
REPAIR REACT (N) (MISC HARDWARE)
EA 5.000 $1,940.000 $100.000 $800.000 $1,000.000 $500.000
REPAIR REACT (N) (FRONT SECTION)
EA 5.000 $1,200.000 $1,000.000 $2,500.000 $650.000 $500.000
REPAIR REACT (N) (CYLINDERS)
EA 5.000 $2,950.000 $5,000.000 $3,074.000 $3,600.000 $500.000
REPAIR (QUAD) (W) (BAY)
EA 2.000 $1,845.000 $800.000 $11,500.000 $2,000.000 $500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $1,117.000 $300.000 $800.000 $1,500.000 $500.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $2,960.000 $9,000.000 $8,838.000 $12,500.000 $500.000
REMOVE AND REPLACE (FASTRACC)
EA 1.000 $19,000.000 $17,000.000 $18,287.000 $20,000.000 $20,000.000
REPAIR (FASTRACC)
LF 50.000 $503.000 $200.000 $195.000 $150.000 $500.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $21,000.000 $35,000.000 $20,000.000 $22,000.000 $500.000
REPAIR (QUAD) (W) (NOSE)
EA 5.000 $1,341.000 $800.000 $995.000 $1,250.000 $500.000
REPAIR QUAD (W) (MISC HARDWARE)
EA 5.000 $1,341.000 $800.000 $495.000 $1,250.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $100.000 $75.000 $200.000 $500.000
TMA (STATIONARY)
DAY 130.000 $275.000 $350.000 $875.000 $120.000 $500.000
Totals: $589,520.000 $690,550.000 $753,311.000 $771,885.000 $975,000.000