EL PASO IH0010 (6348-53-001)

Items: 60

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6348-53-001
DBE Goal: N/A
Project: RMC - 634853001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $644,065.00
Date: 10/02/2019 (6 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$644,065.00
$731,940.00
Over/Under Est: 13.64% $87,875.00
Over/Under Est: 23.91% $154,010.00
Amt Left: 9.04% $66,135.00
$1,362,400.00
Over/Under Est: 111.53% $718,335.00
Amt Left: 86.14% $630,460.00
Delta: -70.71% -$564,325.00

Bid Items & Bid Tabulations

60 Total 0 of 60
EL PASO  |  IH0010  |  EL PASO  |  6348-53-001  |  10/02/2019  |  $644,065.00  |  RMC - 634853001  |  METAL BEAM GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APACHE BARRICADE & SIGN
E. G. L. CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
MOBILIZATION
LS 1.000 $15,000.000 $100.000 $50,000.000 $130,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $20.000 $30.000 $25.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $25.000 $30.000 $25.000 $75.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,850.000 $900.000 $1,237.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $450.000 $100.000 $500.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $5.000 $15.000 $2.000 $15.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $240.000 $150.000 $160.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,300.000 $900.000 $1,600.000 $1,800.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $18,000.000 $14,000.000 $17,000.000 $20,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $15.000 $14.000 $22.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 200.000 $25.000 $20.000 $23.000 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $25.000 $30.000 $18.000 $30.000
RAISE RAIL ELEMENT
LF 800.000 $5.000 $15.000 $10.500 $15.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $40.000 $50.000 $53.000 $70.000
REALIGN POSTS
EA 300.000 $7.000 $10.000 $17.000 $16.000
REMOVE & REPLACE BLOCKOUT
EA 30.000 $5.000 $10.000 $16.000 $30.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $2,730.000 $2,450.000 $2,650.000 $3,500.000
REPLACE SGT OBJECT MARKER
EA 50.000 $15.000 $15.000 $22.000 $35.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $225.000 $300.000 $190.000 $125.000
REPLACE POSTS (TL-3)
EA 75.000 $40.000 $150.000 $120.000 $175.000
REPLACE POSTS (TL-4)
EA 100.000 $75.000 $149.000 $160.000 $175.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $140.000 $222.000 $250.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $100.000 $222.000 $250.000 $325.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $35.000 $250.000 $150.000 $1,500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $200.000 $250.000 $150.000 $1,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $80.000 $1,000.000 $700.000 $3,800.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $500.000 $1,200.000 $700.000 $4,500.000
CHECK / RE-TENSION CABLE
EA 5.000 $200.000 $500.000 $700.000 $850.000
POST AND CABLE FENCE (REPAIR)
LF 500.000 $10.000 $3.000 $5.000 $35.000
REMOVE AND REPLACE (TRACC)
EA 4.000 $13,000.000 $14,000.000 $13,000.000 $20,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $20,000.000 $27,000.000 $27,500.000 $38,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $14,000.000 $22,000.000 $22,160.000 $30,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $25,200.000 $30,000.000 $31,000.000 $45,000.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 1.000 $220.000 $325.000 $3,000.000 $8,000.000
REPAIR (TRACC)
LF 100.000 $75.000 $100.000 $98.000 $300.000
REPAIR (WIDE TRACC)
LF 100.000 $75.000 $150.000 $98.000 $350.000
REPAIR (REACT)
EA 5.000 $1,000.000 $1,500.000 $350.000 $2,500.000
REPAIR REACT (MISC) (HARDWARE)
EA 10.000 $500.000 $275.000 $500.000 $2,500.000
REPAIR REACT (CYLINDERS)
EA 5.000 $200.000 $2,640.000 $3,000.000 $3,500.000
REPAIR REACT (W) (MISC) (HARDWARE)
EA 5.000 $1,000.000 $275.000 $350.000 $2,500.000
REPAIR REACT (W) (CYLINDERS)
EA 5.000 $1,000.000 $9,048.000 $10,000.000 $9,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $15,000.000 $22,000.000 $18,000.000 $30,000.000
REPAIR (SMTC) (N)
EA 1.000 $900.000 $800.000 $1,000.000 $2,500.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $20,000.000 $28,000.000 $22,000.000 $35,000.000
REPAIR (SMTC) (W)
EA 1.000 $900.000 $1,000.000 $1,500.000 $3,400.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $21,370.000 $21,360.000 $28,000.000 $30,000.000
REPAIR TAU II (N)
LF 20.000 $470.000 $300.000 $120.000 $1,700.000
REPAIR TAU II (W)
LF 20.000 $230.000 $300.000 $120.000 $2,200.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $30,000.000 $25,800.000 $29,000.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $45.000 $110.000 $250.000
TMA (STATIONARY)
DAY 92.000 $250.000 $275.000 $350.000 $1,000.000
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 80.000 $100.000 $95.000 $40.000 $150.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 40.000 $100.000 $95.000 $40.000 $150.000
1 LN CLOSURE 4 LN RD
HR 25.000 $130.000 $125.000 $40.000 $150.000
FREEWAY 1 LANE CLOSURE
HR 120.000 $140.000 $210.000 $40.000 $150.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 80.000 $100.000 $95.000 $40.000 $150.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 20.000 $125.000 $75.000 $40.000 $150.000
ONE LANE CONNECTING RAMP CLOSURE
HR 5.000 $130.000 $75.000 $40.000 $150.000
WORK AREA ON SHOULDER
HR 50.000 $100.000 $35.000 $40.000 $150.000
TURN AROUND CLOSURE
HR 40.000 $95.000 $35.000 $40.000 $150.000
Totals: $644,065.000 $731,940.000 $798,075.000 $1,362,400.000