Show Job Controls
Bid Cobra

EL PASO IH0010 (6344-57-001)

Items: 48

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6344-57-001
DBE Goal: N/A
Project: RMC - 634457001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $737,925.00
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: MISCELLANEOUS CONCRETE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$737,925.00
Over/Under Est: -2.42% -$17,840.00
Over/Under Est: 74.34% $548,575.00
Amt Left: 78.66% $566,415.00
$1,429,300.00
Over/Under Est: 93.69% $691,375.00
Amt Left: 98.49% $709,215.00
Delta: -11.10% -$142,800.00

Bid Items & Bid Tabulations

48 Total 0 of 48
EL PASO  |  IH0010  |  EL PASO  |  6344-57-001  |  08/07/2019  |  $737,925.00  |  RMC - 634457001  |  MISCELLANEOUS CONC REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INTERNATIONAL EAGLE ENTERPRISES, INC.
DOUBLE H CONTRACTING INC.
DAN WILLIAMS COMPANY
REMOVING CONC (RIPRAP)
SY 1,800.000 $25.000 $14.700 $40.000 $18.000
REMOVING CONC (CURB)
LF 8,000.000 $6.000 $2.000 $15.000 $6.000
REMOVE CONC (WINGWALL)
CY 15.000 $245.000 $100.000 $200.000 $225.000
REMOVING CONC (MISC)
SY 300.000 $60.000 $15.000 $75.000 $18.000
REMOVING CONC (HEADWALL)
CY 15.000 $200.000 $120.000 $200.000 $225.000
REMOVE CONC (RAIL)
LF 100.000 $40.000 $25.000 $150.000 $35.000
FLOWABLE BACKFILL
CY 100.000 $175.000 $120.000 $180.000 $500.000
CL A CONC (MISC)
SY 75.000 $300.000 $75.000 $180.000 $200.000
CL C CONC (HEADWALL)
CY 10.000 $720.000 $1,000.000 $2,000.000 $2,000.000
CL C CONC (WINGWALLS)
CY 10.000 $700.000 $1,000.000 $2,000.000 $2,000.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 100.000 $100.000 $200.000 $225.000 $550.000
CONC STR REPAIR (STANDARD)
SF 300.000 $75.000 $150.000 $225.000 $375.000
RIPRAP (CONC)(CL B)
CY 320.000 $400.000 $260.000 $750.000 $750.000
RAIL (HANDRAIL)(TY A)
LF 100.000 $105.000 $100.000 $250.000 $150.000
MOBILIZATION
LS 1.000 $40,000.000 $5,000.000 $100,000.000 $140,000.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 100.000 $10.000 $30.000 $35.000 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 300.000 $8.000 $5.000 $35.000 $10.000
PORT CONC TRAF BAR (STKPL,INSTL&RETRN)
LF 100.000 $20.000 $20.000 $15.000 $75.000
CONC CURB (MONO) (TY II)
LF 8,000.000 $10.000 $7.000 $22.000 $30.000
CONC CURB & GUTTER (TY II)
LF 50.000 $20.000 $20.000 $35.000 $75.000
CONC SIDEWALKS (4")
SY 50.000 $45.000 $60.000 $50.000 $90.000
CURB RAMPS (SPECIAL)
SY 10.000 $200.000 $150.000 $200.000 $250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $1,000.000 $3,000.000 $20,000.000 $3,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,650.000 $1,000.000 $5,000.000 $900.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $650.000 $1,000.000 $5,000.000 $900.000
CRASH CUSHION ATTEN (INSTALL) (TRACC)
EA 1.000 $17,000.000 $30,000.000 $20,000.000 $30,000.000
CONCRETE RAIL REPAIR (TYPE 551)
LF 50.000 $100.000 $150.000 $350.000 $400.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $85.000 $50.000 $500.000 $200.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $5,000.000 $5,000.000 $5,000.000 $8,000.000
TMA (MOBILE OPERATION)
HR 1,000.000 $50.000 $40.000 $50.000 $150.000
1 LN CLOSURE 4 LN RD
HR 115.000 $130.000 $300.000 $100.000 $130.000
2 LN CLOSURE 4 LN RD
HR 130.000 $140.000 $200.000 $100.000 $130.000
FREEWAY 1 LANE CLOSURE
HR 300.000 $130.000 $225.000 $100.000 $130.000
FREEWAY 2 LANE CLOSURE
HR 30.000 $230.000 $350.000 $150.000 $130.000
FREEWAY 3 LANE CLOSURE
HR 5.000 $250.000 $700.000 $250.000 $80.000
FREEWAY 4 LANE CLOSURE
HR 5.000 $280.000 $700.000 $400.000 $100.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 325.000 $110.000 $150.000 $150.000 $130.000
FREEWAY CLOSURE SEQUENCE DAYTIME ONLY
HR 10.000 $250.000 $750.000 $750.000 $40.000
COMPLETE FREEWAY CLOSURE
HR 10.000 $350.000 $1,200.000 $500.000 $110.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 150.000 $120.000 $250.000 $125.000 $130.000
TWO LANE FRONTAGE ROAD CLOSURE
HR 40.000 $175.000 $280.000 $150.000 $130.000
ONE LANE CONNECTING RAMP CLOSURE
HR 20.000 $140.000 $200.000 $200.000 $130.000
TWO LANE CONNECTING RAMP CLOSURE
HR 20.000 $225.000 $190.000 $250.000 $130.000
WORK AREA ON SHOULDER
HR 150.000 $95.000 $200.000 $100.000 $130.000
TURN AROUND CLOSURE
HR 40.000 $95.000 $150.000 $100.000 $130.000
FURNISH ADDITIONAL FLAGGER
HR 10.000 $45.000 $50.000 $100.000 $20.000
PILOT VEHICLE AND OPERATOR
HR 10.000 $70.000 $60.000 $150.000 $50.000
FURNISH ADDITIONAL ARROW BOARD
HR 10.000 $10.000 $65.000 $50.000 $10.000
Totals: $737,925.000 $720,085.000 $1,286,500.000 $1,429,300.000