EL PASO IH0010 (6339-47-001)

Items: 52

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6339-47-001
DBE Goal: N/A
Project: RMC - 633947001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $561,177.50
Date: 01/09/2019 (7 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$561,177.50
$647,900.00
Over/Under Est: 15.45% $86,722.50
Over/Under Est: 31.62% $177,449.07
Amt Left: 14% $90,726.57
Over/Under Est: 33.5% $188,002.50
Amt Left: 15.63% $101,280.00
Delta: -1.43% -$10,553.43
Over/Under Est: 73.96% $415,023.66
Amt Left: 50.67% $328,301.16
Delta: -30.30% -$227,021.16

Bid Items & Bid Tabulations

52 Total 0 of 52
EL PASO  |  IH0010  |  EL PASO  |  6339-47-001  |  01/09/2019  |  $561,177.50  |  RMC - 633947001  |  METAL BEAM GUARD FENCE  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APACHE BARRICADE & SIGN
SYNERGY PROJECT CONTRACTORS, INC.
E. G. L. CONSTRUCTION, INC.
BOWEN INDUSTRIAL CONTRACTORS, INC.
MOBILIZATION
LS 1.000 $20,000.000 $1,000.000 $20,579.110 $30,000.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $20.000 $20.000 $31.460 $28.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 25.000 $20.000 $25.000 $36.130 $32.000 $22.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $1,500.000 $703.380 $950.000 $3,191.750
DOWNSTREAM ANCHOR TERMINAL ADJUSTMENT
EA 5.000 $500.000 $500.000 $70.000 $500.000 $495.600
REMOVE METAL BEAM GUARD FENCE
LF 25.000 $2.500 $10.000 $8.210 $19.000 $10.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $150.000 $200.000 $47.880 $500.000 $1,561.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $12,000.000 $2,500.000 $22,206.700 $19,800.000 $25,806.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $200.000 $2,500.000 $570.000 $1,500.000 $500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $10.000 $17.000 $15.960 $15.000 $8.920
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 200.000 $20.000 $25.000 $27.360 $75.000 $63.450
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 300.000 $12.000 $25.000 $21.660 $34.000 $87.010
RAISE RAIL ELEMENT
LF 800.000 $5.000 $2.000 $2.020 $8.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $23.000 $50.000 $45.600 $50.000 $86.880
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $35.000 $60.000 $43.320 $60.000 $188.800
REALIGN POSTS
EA 500.000 $4.000 $5.000 $13.110 $35.000 $19.860
REMOVE & REPLACE BLOCKOUT
EA 10.000 $10.000 $5.000 $52.950 $35.000 $36.930
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $2,500.000 $3,000.000 $2,773.370 $2,927.000 $4,974.630
REPLACE SGT OBJECT MARKER
EA 100.000 $25.000 $5.000 $30.430 $50.000 $40.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $180.000 $10.000 $316.820 $500.000 $436.330
REPLACE POSTS (TL-3)
EA 75.000 $35.000 $75.000 $104.280 $120.000 $120.780
REPLACE POSTS (TL-4)
EA 200.000 $60.000 $140.000 $131.110 $100.000 $137.110
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $240.000 $50.000 $199.500 $500.000 $419.880
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $240.000 $50.000 $228.000 $500.000 $419.880
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $50.000 $250.000 $136.800 $1,500.000 $349.800
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $50.000 $300.000 $85.000 $1,500.000 $349.800
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $100.000 $750.000 $524.400 $90.000 $6,270.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $130.000 $1,000.000 $550.620 $90.000 $6,270.000
POST AND CABLE FENCE (REPAIR)
LF 500.000 $3.000 $2.000 $10.260 $5.000 $6.830
REMOVE AND REPLACE (TRACC)
EA 4.000 $14,000.000 $15,000.000 $20,086.600 $14,500.000 $19,602.500
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $21,000.000 $25,000.000 $26,316.400 $24,075.000 $31,736.880
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $16,000.000 $18,000.000 $20,064.000 $19,900.000 $27,233.750
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $26,000.000 $24,000.000 $38,656.900 $35,000.000 $47,583.750
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 1.000 $350.000 $100.000 $3,560.860 $4,500.000 $6,497.880
REPAIR (TRACC)
LF 100.000 $100.000 $75.000 $58.140 $10.000 $20.780
REPAIR (WIDE TRACC)
LF 100.000 $100.000 $75.000 $199.500 $100.000 $25.130
REPAIR (REACT)
EA 5.000 $225.000 $500.000 $691.670 $1,000.000 $1,224.000
REPAIR REACT (MISC) (HARDWARE)
EA 10.000 $50.000 $150.000 $357.800 $300.000 $1,343.500
REPAIR REACT (CYLINDERS)
EA 10.000 $50.000 $500.000 $1,227.640 $500.000 $1,618.500
REPAIR REACT (W) (MISC) (HARDWARE)
EA 10.000 $75.000 $150.000 $577.540 $500.000 $1,343.500
REPAIR REACT (W) (CYLINDERS)
EA 10.000 $75.000 $500.000 $596.920 $500.000 $1,618.310
RUMLBLE STRIP
EA 100.000 $135.000 $50.000 $127.680 $250.000 $50.000
TMA (MOBILE OPERATION)
HR 450.000 $55.000 $54.000 $43.700 $60.000 $98.450
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 80.000 $150.000 $75.000 $78.800 $50.000 $128.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 80.000 $65.000 $75.000 $50.300 $50.000 $128.000
1 LN CLOSURE 4 LN RD
HR 25.000 $65.000 $65.000 $123.760 $50.000 $128.000
FREEWAY 1 LANE CLOSURE
HR 80.000 $88.000 $140.000 $138.080 $50.000 $128.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 40.000 $525.000 $40.000 $67.980 $60.000 $128.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 5.000 $150.000 $50.000 $78.680 $60.000 $128.000
ONE LANE CONNECTING RAMP CLOSURE
HR 5.000 $150.000 $75.000 $157.390 $60.000 $128.000
WORK AREA ON SHOULDER
HR 60.000 $120.000 $75.000 $76.240 $60.000 $128.000
TURN AROUND CLOSURE
HR 40.000 $120.000 $75.000 $90.780 $60.000 $128.000
Totals: $561,177.500 $647,900.000 $738,626.570 $749,180.000 $976,201.160