MOBILIZATION
|
LS
|
1.000
|
$20,000.000
|
$12,000.000
|
|
|
MOBILIZATION (CALLOUT 1)
|
EA
|
2.000
|
$4,000.000
|
$1,600.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
5.000
|
$2,000.000
|
$1,300.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
150.000
|
$2.000
|
$1.250
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
150.000
|
$3.000
|
$1.300
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
250.000
|
$3.000
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
250.000
|
$4.000
|
$3.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
250.000
|
$4.000
|
$3.250
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
150.000
|
$4.000
|
$4.000
|
|
|
ELEC CONDR (NO.3) INSULATED
|
LF
|
150.000
|
$5.000
|
$5.500
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
150.000
|
$5.000
|
$5.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,350.000
|
$1,250.000
|
|
|
GROUND BOX TY 1 (304848)W/APRON
|
EA
|
5.000
|
$3,150.000
|
$3,000.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
500.000
|
$6.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
500.000
|
$7.000
|
$6.900
|
|
|
REMOVAL OF CABLES
|
LF
|
1,000.000
|
$2.000
|
$1.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
2.000
|
$2,300.000
|
$1,450.000
|
|
|
INSTALL OF SIGNAL POLE ASSM
|
EA
|
5.000
|
$2,800.000
|
$2,600.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
7.000
|
$100.000
|
$125.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
135.000
|
$65.000
|
$90.000
|
|
|
1 LN CLOSURE 2 LN RD NO SHOULDERS
|
HR
|
10.000
|
$115.000
|
$150.000
|
|
|
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
|
HR
|
10.000
|
$115.000
|
$155.000
|
|
|
1 LN CLOSURE 4 LN RD
|
HR
|
5.000
|
$110.000
|
$200.000
|
|
|
2 LN CLOSURE 4 LN RD
|
HR
|
5.000
|
$115.000
|
$250.000
|
|
|
FREEWAY 1 LANE CLOSURE
|
HR
|
20.000
|
$155.000
|
$300.000
|
|
|
FREEWAY 2 LANE CLOSURE
|
HR
|
5.000
|
$210.000
|
$350.000
|
|
|
FREEWAY 3 LANE CLOSURE
|
HR
|
1.000
|
$250.000
|
$500.000
|
|
|
FREEWAY 4 LANE CLOSURE
|
HR
|
1.000
|
$280.000
|
$800.000
|
|
|
EXIT OR ENTRANCE RAMP CLOSURE
|
HR
|
5.000
|
$110.000
|
$225.000
|
|
|
FREEWAY CLOSURE SEQUENCE DAYTIME ONLY
|
HR
|
1.000
|
$300.000
|
$250.000
|
|
|
COMPLETE FREEWAY CLOSURE
|
HR
|
1.000
|
$400.000
|
$300.000
|
|
|
ONE LANE FRONTAGE ROAD CLOSURE
|
HR
|
10.000
|
$125.000
|
$200.000
|
|
|
TWO LANE FRONTAGE ROAD CLOSURE
|
HR
|
10.000
|
$155.000
|
$300.000
|
|
|
ONE LANE CONNECTING RAMP CLOSURE
|
HR
|
5.000
|
$120.000
|
$300.000
|
|
|
TWO LANE CONNECTING RAMP CLOSURE
|
HR
|
1.000
|
$185.000
|
$500.000
|
|
|
WORK AREA ON SHOULDER
|
HR
|
40.000
|
$95.000
|
$125.000
|
|
|
TURN AROUND CLOSURE
|
HR
|
5.000
|
$95.000
|
$200.000
|
|
|
FURNISH ADDITIONAL FLAGGER
|
HR
|
1.000
|
$45.000
|
$55.000
|
|
|
PILOT VEHICLE AND OPERATOR
|
HR
|
1.000
|
$45.000
|
$75.000
|
|
|
TROUBLESHOOT EQUIPMENT
|
HR
|
160.000
|
$150.000
|
$290.000
|
|
|
TROUBLESHOOT PWR,SIG,INTER & COM
|
HR
|
50.000
|
$150.000
|
$325.000
|
|
|
GRAFFITI REMOVAL
|
SF
|
5.000
|
$200.000
|
$425.000
|
|
|
SYSTEM COMPONENT DEVICE
|
EA
|
5.000
|
$175.000
|
$275.000
|
|
|
CCTV CAMERA (INCL PAN,TILT AND LENS)
|
EA
|
5.000
|
$350.000
|
$375.000
|
|
|
CCTV CAMERA CONTROLLER
|
EA
|
3.000
|
$250.000
|
$400.000
|
|
|
CCTV CONTROLLER CABINET (POLE MNT)
|
EA
|
2.000
|
$1,200.000
|
$350.000
|
|
|
CCTV CAMERA POLE
|
EA
|
2.000
|
$2,500.000
|
$3,500.000
|
|
|
PREVENT MAINT OF CCTV CAMERA SYS
|
EA
|
50.000
|
$200.000
|
$245.000
|
|
|
BATTERIES
|
EA
|
5.000
|
$875.000
|
$750.000
|
|
|
AMBER OR COLOR DMS CONTROLLER
|
EA
|
5.000
|
$1,000.000
|
$1,200.000
|
|
|
EQUIPMENT CABINET
|
EA
|
3.000
|
$1,000.000
|
$3,500.000
|
|
|
TROUBLESHOOT FIBER OPT CBL(MULTI-MODE)
|
HR
|
15.000
|
$330.000
|
$155.000
|
|
|
TROUBLESHOOT FIBER OPT CBL(SINGLE-MODE)
|
HR
|
15.000
|
$330.000
|
$275.000
|
|
|
FIBER OPTIC CABLE (MULTI-MODE)
|
LF
|
700.000
|
$30.000
|
$6.000
|
|
|
FIBER OPTIC CABLE (SINGLE-MODE)
|
LF
|
700.000
|
$30.000
|
$9.000
|
|
|
SPLICE FIBER OPT CABLE (MULTI-MODE)
|
EA
|
5.000
|
$1,500.000
|
$1,000.000
|
|
|
SPLICE FIBER OPT CABLE (SINGLE-MODE)
|
EA
|
10.000
|
$1,850.000
|
$3,500.000
|
|
|
SPLICE INDIVIDUAL FIBER
|
EA
|
20.000
|
$187.500
|
$75.000
|
|
|
HUB BUILDING
|
EA
|
2.000
|
$6,000.000
|
$7,000.000
|
|
|
HUB BUILDING PREVENTIVE MAINTENANCE
|
EA
|
10.000
|
$2,000.000
|
$2,500.000
|
|
|
HUB CABINET PREVENTIVE MAINTENANCE
|
EA
|
50.000
|
$2,000.000
|
$1,250.000
|
|
|
LANE CONTROL SIGNAL (HOV)
|
EA
|
3.000
|
$1,125.000
|
$550.000
|
|
|
LANE CONTROL SIGNAL (FRWY)
|
EA
|
2.000
|
$1,625.000
|
$550.000
|
|
|
ELECTRICAL SERVICE
|
EA
|
5.000
|
$6,600.000
|
$5,800.000
|
|
|
ELECTRICAL SERVICE ENCLOSURE
|
EA
|
5.000
|
$1,750.000
|
$4,000.000
|
|
|
BORE CONDUIT (2")
|
LF
|
175.000
|
$65.000
|
$32.000
|
|
|
BORE CONDUIT (3")
|
LF
|
560.000
|
$70.000
|
$40.000
|
|
|
TRENCH CONDUIT (2")
|
LF
|
350.000
|
$62.000
|
$19.500
|
|
|
TRENCH CONDUIT (3")
|
LF
|
350.000
|
$66.000
|
$21.000
|
|
|
ABOVE GROUND CONDUIT (2")
|
LF
|
70.000
|
$65.000
|
$30.000
|
|
|
ABOVE GROUND CONDUIT (3")
|
LF
|
70.000
|
$70.000
|
$65.000
|
|
|
VIVDS DETECTOR CAMERA
|
EA
|
5.000
|
$720.000
|
$750.000
|
|
|
PED POLE FOUNDATION
|
EA
|
5.000
|
$2,400.000
|
$2,500.000
|
|
|
EQUIPMENT CABINET FOUNDATION
|
EA
|
2.000
|
$3,750.000
|
$5,500.000
|
|
|
SIGNAL POLE FOUNDATION
|
EA
|
2.000
|
$3,650.000
|
$4,500.000
|
|
|
OPEN TRANSPORTATION NETWORK (OTN)
|
LS
|
5.000
|
$1,000.000
|
$5,500.000
|
|
|
BLUETOOTH DETECTOR
|
EA
|
5.000
|
$600.000
|
$550.000
|
|
|
DMS (AMBER)
|
EA
|
1.000
|
$2,000.000
|
$22,600.000
|
|
|
DMS (COLOR)
|
EA
|
1.000
|
$2,000.000
|
$23,000.000
|
|
|
DMS MAINTENANCE (AMBER)
|
EA
|
10.000
|
$3,450.000
|
$3,500.000
|
|
|
DMS MAINTENANCE (COLOR)
|
EA
|
10.000
|
$3,450.000
|
$3,500.000
|
|
|
FIELD ETHERNET SWITCH
|
EA
|
10.000
|
$800.000
|
$650.000
|
|
|
VIDEO ENCODER
|
EA
|
10.000
|
$525.000
|
$850.000
|
|
|
CELLULAR MODEM
|
EA
|
5.000
|
$475.000
|
$650.000
|
|
|
TRAFFIC SIGNAL LAMP (12")LED
|
EA
|
60.000
|
$225.000
|
$169.000
|
|
Totals: |
$693,005.000
|
$692,027.500
|