Show Job Controls
Bid Cobra

EL PASO IH0010 (6330-08-001)

Items: 30

County: EL PASO
Length: N/A
Highway: IH0010
District: EL PASO
Control Number: 6330-08-001
DBE Goal: N/A
Project: RMC - 633008001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $450,283.41
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: SPALL AND FULL DEPTH REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$450,283.41
$772,020.00
Over/Under Est: 71.45% $321,736.59

Bid Items & Bid Tabulations

30 Total 0 of 30
EL PASO  |  IH0010  |  EL PASO  |  6330-08-001  |  05/01/2018  |  $450,283.41  |  RMC - 633008001  |  SPALL AND FULL DEPTH REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
CY 380.000 $450.000 $1,000.000
MOBILIZATION
LS 1.000 $8,009.050 $35,000.000
MOBILIZATION (CALLOUT 1)
EA 20.000 $650.000 $2,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $3.840 $5.500
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 900.000 $10.170 $11.000
PORT CONC TRAF BAR (STKPL,INSTL&RETRN)
LF 900.000 $60.000 $11.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $12,000.000 $10,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,297.680 $1,000.000
PREFAB PAV MRK TY C (W) (4") (BRK)
LF 1,000.000 $5.600 $6.000
PREFAB PAV MRK TY C (W) (4") (SLD)
LF 1,000.000 $5.600 $6.000
PREFAB PAV MRK TY C (Y) (4") (BRK)
LF 1,000.000 $5.600 $6.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 1,000.000 $5.600 $6.000
REFL PAV MRKR TY I-C
EA 200.000 $4.000 $8.500
REFL PAV MRKR TY II-C-R
EA 200.000 $4.300 $8.500
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 50.000 $14.000 $200.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $13,836.000 $6,500.000
TMA (MOBILE OPERATION)
HR 1,200.000 $55.000 $40.000
1 LN CLOSURE 4 LN RD
HR 400.000 $55.000 $140.000
2 LN CLOSURE 4 LN RD
HR 20.000 $60.000 $150.000
FREEWAY 1 LANE CLOSURE
HR 600.000 $60.000 $150.000
FREEWAY 2 LANE CLOSURE
HR 20.000 $65.000 $200.000
FREEWAY 3 LANE CLOSURE
HR 20.000 $75.000 $230.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 10.000 $60.000 $120.000
COMPLETE FREEWAY CLOSURE
HR 20.000 $125.000 $400.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 10.000 $55.000 $150.000
TWO LANE FRONTAGE ROAD CLOSURE
HR 40.000 $55.000 $200.000
ONE LANE CONNECTING RAMP CLOSURE
HR 24.000 $60.000 $150.000
TWO LANE CONNECTING RAMP CLOSURE
HR 24.000 $60.000 $200.000
WORK AREA ON SHOULDER
HR 16.000 $60.000 $120.000
TURN AROUND CLOSURE
HR 10.000 $40.000 $120.000
Totals: $450,283.410 $772,020.000