|
|
MOBILIZATION
|
LS
|
1.000
|
$15,000.000
|
$500.000
|
$18,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.500
|
$2.000
|
$6.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
20.000
|
$100.000
|
$100.000
|
$200.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
500.000
|
$4.000
|
$10.000
|
$5.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
1.000
|
$300.000
|
$500.000
|
$2,990.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$16,000.000
|
$1,000.000
|
$17,700.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
9,000.000
|
$9.000
|
$20.000
|
$12.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
80.000
|
$20.000
|
$30.000
|
$35.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
350.000
|
$18.000
|
$30.000
|
$17.500
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
550.000
|
$27.000
|
$50.000
|
$33.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
80.000
|
$37.000
|
$50.000
|
$70.000
|
|
|
REALIGN POSTS
|
EA
|
300.000
|
$8.000
|
$10.000
|
$14.500
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
10.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
2,500.000
|
$9.000
|
$30.000
|
$13.750
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
550.000
|
$29.000
|
$100.000
|
$40.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
3.000
|
$140.000
|
$20.000
|
$200.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
220.000
|
$135.000
|
$100.000
|
$262.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
115.000
|
$1,300.000
|
$8.000
|
$1,175.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
10.000
|
$26.000
|
$5.000
|
$35.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
1,000.000
|
$55.000
|
$80.000
|
$64.500
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
5.000
|
$250.000
|
$100.000
|
$315.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
10.000
|
$250.000
|
$100.000
|
$315.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
5.000
|
$45.000
|
$100.000
|
$100.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
2.000
|
$200.000
|
$500.000
|
$3,000.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
6,800.000
|
$1.500
|
$7.000
|
$3.500
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
550.000
|
$7.500
|
$1.000
|
$7.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
5.000
|
$41.000
|
$1.000
|
$100.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$14.000
|
$2.000
|
$18.750
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
5.000
|
$48.000
|
$1.000
|
$100.000
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
10.000
|
$25.000
|
$10.000
|
$50.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
50.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
2.000
|
$12,000.000
|
$10,000.000
|
$15,000.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
1.000
|
$14,000.000
|
$20,000.000
|
$23,000.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
3.000
|
$10,000.000
|
$10,000.000
|
$17,095.000
|
|
|
REPAIR (TRACC)
|
LF
|
10.000
|
$60.000
|
$500.000
|
$100.000
|
|
|
REPAIR (WIDE TRACC)
|
LF
|
5.000
|
$30.000
|
$200.000
|
$100.000
|
|
|
REPAIR (NARROW REACT 350)
|
LF
|
5.000
|
$30.000
|
$100.000
|
$100.000
|
|
|
REPAIR REACT (MISC) (HARDWARE)
|
EA
|
1.000
|
$30.000
|
$100.000
|
$100.000
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
1.000
|
$14,000.000
|
$20,000.000
|
$19,020.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
1.000
|
$1,000.000
|
$300.000
|
$2,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
1.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
|
|
REMOVE AND REPLACE (SHORTRACC)
|
EA
|
1.000
|
$3,000.000
|
$15,000.000
|
$13,175.000
|
|
|
REPAIR (SHORTRACC)
|
LF
|
5.000
|
$200.000
|
$100.000
|
$350.000
|
|
|
REMOVE AND REPLACE (TAU II) (N)
|
EA
|
1.000
|
$20,000.000
|
$20,000.000
|
$25,500.000
|
|
|
REPAIR TAU II (N) (MISC HARDWARE)
|
EA
|
2.000
|
$800.000
|
$300.000
|
$3,500.000
|
|
|
REPAIR TAU II (N)
|
LF
|
2.000
|
$400.000
|
$100.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$100.000
|
$500.000
|
$65.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 1)
|
EA
|
25.000
|
$120.000
|
$1.000
|
$500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 2)
|
EA
|
25.000
|
$120.000
|
$1.000
|
$500.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 3)
|
EA
|
25.000
|
$120.000
|
$1.000
|
$375.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 5)
|
EA
|
60.000
|
$120.000
|
$1.000
|
$550.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 9)
|
EA
|
35.000
|
$120.000
|
$1.000
|
$550.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 12)
|
EA
|
20.000
|
$120.000
|
$1.000
|
$250.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 14)
|
EA
|
30.000
|
$120.000
|
$1.000
|
$585.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 16)
|
EA
|
20.000
|
$120.000
|
$1.000
|
$250.000
|
|
|
LANE CLOSURE (SETUP AND REMOV)(TY 17)
|
EA
|
10.000
|
$120.000
|
$1.000
|
$50.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 1)
|
HR
|
200.000
|
$40.000
|
$1.000
|
$70.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 2)
|
HR
|
200.000
|
$40.000
|
$1.000
|
$48.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 3)
|
HR
|
200.000
|
$40.000
|
$1.000
|
$35.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 5)
|
HR
|
480.000
|
$40.000
|
$1.000
|
$40.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 9)
|
HR
|
280.000
|
$40.000
|
$1.000
|
$50.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 12)
|
HR
|
160.000
|
$40.000
|
$1.000
|
$50.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 14)
|
HR
|
240.000
|
$40.000
|
$1.000
|
$475.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 16)
|
HR
|
160.000
|
$40.000
|
$1.000
|
$100.000
|
|
|
LANE CLOSURE (MAINTENANCE) (TY 17)
|
HR
|
80.000
|
$40.000
|
$1.000
|
$30.000
|
|
Totals: |
$685,665.000
|
$684,590.000
|
$1,071,910.000
|