PREPARING ROW
|
STA
|
6.000
|
$1,000.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
620.000
|
$5.000
|
$3.500
|
$10.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
380.000
|
$20.000
|
$25.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
990.000
|
$9.000
|
$2.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
32.000
|
$20.000
|
$35.000
|
$80.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
5,289.000
|
$20.000
|
$18.000
|
$12.000
|
|
|
FL BS (CMP IN PLC)(RAP) (6")
|
SY
|
3,631.000
|
$10.000
|
$6.500
|
$18.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
233.000
|
$50.000
|
$70.000
|
$59.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
171.000
|
$6.000
|
$15.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
157.000
|
$160.000
|
$175.000
|
$120.000
|
|
|
CUT & RESTORING PAV
|
SY
|
8.000
|
$100.000
|
$1,200.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
838.000
|
$330.000
|
$300.000
|
$340.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
47.200
|
$1,700.000
|
$1,100.000
|
$1,150.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
59.700
|
$1,400.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
54.300
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
76.000
|
$600.000
|
$450.000
|
$800.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
11,040.000
|
$30.000
|
$25.000
|
$26.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
71.000
|
$800.000
|
$700.000
|
$525.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,428.420
|
$200.000
|
$250.000
|
$275.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
261.000
|
$500.000
|
$500.000
|
$340.000
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
512.000
|
$125.000
|
$65.000
|
$75.000
|
|
|
RAIL (TY T80SS)
|
LF
|
468.000
|
$200.000
|
$115.000
|
$80.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
137.000
|
$225.000
|
$190.000
|
$220.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$150,000.000
|
$65,000.000
|
$300,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$15,000.000
|
$2,500.000
|
$12,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$205,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$10,000.000
|
$10,000.000
|
$18,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$60.000
|
$28.500
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$20.000
|
$10.150
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
623.000
|
$30.000
|
$21.000
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
623.000
|
$10.000
|
$11.250
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
75.000
|
$5.000
|
$7.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
75.000
|
$2.000
|
$1.400
|
$1.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,290.000
|
$40.000
|
$75.000
|
$92.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,290.000
|
$9.000
|
$7.000
|
$15.000
|
|
|
CONC CURB (TY II)
|
LF
|
572.000
|
$10.000
|
$18.000
|
$14.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
575.000
|
$24.000
|
$28.000
|
$33.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,250.000
|
$28.000
|
$35.000
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$3,000.000
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,100.000
|
$1,400.000
|
$3,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,110.000
|
$2.500
|
$3.500
|
$4.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$400.000
|
$350.000
|
$800.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$3,200.000
|
$4,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$350.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$750.000
|
$600.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$30,000.000
|
$30,000.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$10,500.000
|
$18,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
190.000
|
$18.000
|
$31.850
|
$36.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
190.000
|
$30.000
|
$39.850
|
$44.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
848.000
|
$1.300
|
$3.700
|
$5.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,696.000
|
$1.600
|
$3.700
|
$5.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,300.000
|
$1,925.000
|
$2,300.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,500.000
|
$3,355.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$17.000
|
$55.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$25.000
|
$55.000
|
$40.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
560.000
|
$0.200
|
$2.350
|
$5.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
560.000
|
$0.200
|
$2.350
|
$5.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,120.000
|
$0.200
|
$1.600
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
520.000
|
$0.750
|
$4.100
|
$7.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
520.000
|
$0.750
|
$4.100
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
14.000
|
$4.000
|
$27.000
|
$80.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,120.000
|
$0.200
|
$1.300
|
$4.000
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
188.000
|
$110.000
|
$160.000
|
$140.000
|
|
|
D-GR HMA TY-C SAC-A PG70-22
|
TON
|
157.000
|
$80.000
|
$170.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
171.000
|
$6.000
|
$15.000
|
$17.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$7,000.000
|
$12,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$185.000
|
$350.000
|
$130.000
|
|
Totals: |
$2,613,367.000
|
$2,488,273.050
|
$2,958,134.500
|