EL PASO IH 10 (2121-05-046)

Items: 67

County: EL PASO
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 2121-05-046
DBE Goal: N/A
Project: BR 2022(646)
Guaranty: N/A
Time: 123 WORKING DAYS
Engineer's Estimate: $2,613,367.00
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,613,367.00
$2,488,273.05
Over/Under Est: -4.79% -$125,093.95
Over/Under Est: 13.19% $344,767.50
Amt Left: 18.88% $469,861.45

Bid Items & Bid Tabulations

67 Total 0 of 67
EL PASO  |  IH 10  |  EL PASO  |  2121-05-046  |  06/02/2022  |  $2,613,367.00  |  BR 2022(646)  |  BRIDGE REPL  |  123 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
INTERNATIONAL EAGLE ENTERPRISES, INC.
PREPARING ROW
STA 6.000 $1,000.000 $2,000.000 $5,000.000
REMOVING CONC (CURB)
LF 620.000 $5.000 $3.500 $10.000
REMOVING CONC (CTB)
LF 380.000 $20.000 $25.000 $25.000
REMOVING STAB BASE & ASPH PAV (9")
SY 990.000 $9.000 $2.000 $15.000
EXCAVATION (ROADWAY)
CY 32.000 $20.000 $35.000 $80.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,289.000 $20.000 $18.000 $12.000
FL BS (CMP IN PLC)(RAP) (6")
SY 3,631.000 $10.000 $6.500 $18.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 233.000 $50.000 $70.000 $59.000
PRIME COAT (AE-P)
GAL 171.000 $6.000 $15.000 $15.000
CEM STABIL BKFL
CY 157.000 $160.000 $175.000 $120.000
CUT & RESTORING PAV
SY 8.000 $100.000 $1,200.000 $250.000
DRILL SHAFT (36 IN)
LF 838.000 $330.000 $300.000 $340.000
CL C CONC (ABUT)(HPC)
CY 47.200 $1,700.000 $1,100.000 $1,150.000
CL C CONC (CAP)(HPC)
CY 59.700 $1,400.000 $1,500.000 $1,200.000
CL C CONC (COLUMN)(HPC)
CY 54.300 $1,000.000 $1,300.000 $1,000.000
CL C CONC (RAIL FOUNDATION)
CY 76.000 $600.000 $450.000 $800.000
REINF CONC SLAB (HPC)
SF 11,040.000 $30.000 $25.000 $26.000
APPROACH SLAB (HPC)
CY 71.000 $800.000 $700.000 $525.000
PRESTR CONC GIRDER (TX28)
LF 1,428.420 $200.000 $250.000 $275.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 261.000 $500.000 $500.000 $340.000
RAIL (TY T551)(HPC)
LF 512.000 $125.000 $65.000 $75.000
RAIL (TY T80SS)
LF 468.000 $200.000 $115.000 $80.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 137.000 $225.000 $190.000 $220.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $150,000.000 $65,000.000 $300,000.000
REMOV STR (APPROACH SLAB)
EA 2.000 $15,000.000 $2,500.000 $12,000.000
MOBILIZATION
LS 1.000 $200,000.000 $205,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $10,000.000 $18,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $60.000 $28.500 $25.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $20.000 $10.150 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 623.000 $30.000 $21.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 623.000 $10.000 $11.250 $10.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 75.000 $5.000 $7.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 75.000 $2.000 $1.400 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,290.000 $40.000 $75.000 $92.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,290.000 $9.000 $7.000 $15.000
CONC CURB (TY II)
LF 572.000 $10.000 $18.000 $14.000
MTL W-BEAM GD FEN (TIM POST)
LF 575.000 $24.000 $28.000 $33.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,250.000 $28.000 $35.000 $38.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $3,000.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,100.000 $1,400.000 $3,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,110.000 $2.500 $3.500 $4.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $400.000 $350.000 $800.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,000.000 $3,200.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $350.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $750.000 $600.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $30,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $10,500.000 $18,000.000
CONDT (PVC) (SCH 40) (2")
LF 190.000 $18.000 $31.850 $36.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 190.000 $30.000 $39.850 $44.000
ELEC CONDR (NO.8) BARE
LF 848.000 $1.300 $3.700 $5.000
ELEC CONDR (NO.8) INSULATED
LF 1,696.000 $1.600 $3.700 $5.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,300.000 $1,925.000 $2,300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,500.000 $3,355.000 $5,000.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 6.000 $17.000 $55.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $25.000 $55.000 $40.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 560.000 $0.200 $2.350 $5.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 560.000 $0.200 $2.350 $5.000
PAVEMENT SEALER 4"
LF 1,120.000 $0.200 $1.600 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 520.000 $0.750 $4.100 $7.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 520.000 $0.750 $4.100 $7.000
REFL PAV MRKR TY II-A-A
EA 14.000 $4.000 $27.000 $80.000
PAV SURF PREP FOR MRK (4")
LF 1,120.000 $0.200 $1.300 $4.000
D-GR HMA TY-B PG70-22
TON 188.000 $110.000 $160.000 $140.000
D-GR HMA TY-C SAC-A PG70-22
TON 157.000 $80.000 $170.000 $140.000
TACK COAT
GAL 171.000 $6.000 $15.000 $17.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $10,000.000 $7,000.000 $12,000.000
TMA (STATIONARY)
DAY 40.000 $185.000 $350.000 $130.000
Totals: $2,613,367.000 $2,488,273.050 $2,958,134.500