Bid Cobra

EL PASO IH 10 (2121-01-091)

Items: 171

County: EL PASO
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 2121-01-091
DBE Goal: N/A
Project: CM 2018(087)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $7,890,470.60
Date: 12/06/2017 (8 years ago)
Contract Number: N/A
Type: REHAB AND OPERATIONAL IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,890,470.60
Over/Under Est: -4.31% -$340,098.27
Over/Under Est: -1.21% -$95,092.30
Amt Left: 3.24% $245,005.97
$7,850,753.15
Over/Under Est: -0.5% -$39,717.45
Amt Left: 3.98% $300,380.82
Delta: -0.71% -$55,374.85
$8,086,337.65
Over/Under Est: 2.48% $195,867.05
Amt Left: 7.1% $535,965.32
Delta: -3.00% -$235,584.50

Bid Items & Bid Tabulations

171 Total 0 of 171
EL PASO  |  IH 10  |  EL PASO  |  2121-01-091  |  12/06/2017  |  $7,890,470.60  |  CM 2018(087)  |  REHAB AND OPERATIONAL IMPRVS  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INTERNATIONAL EAGLE ENTERPRISES, INC.
JORDAN FOSTER CONSTRUCTION, LLC
DAN WILLIAMS COMPANY
J.D. ABRAMS, L.P.
PREPARING ROW
STA 146.180 $300.000 $400.000 $205.000 $750.000 $2,680.000
REMOVING CONC (RIPRAP)
SY 6,309.000 $7.500 $8.500 $8.000 $8.000 $5.000
REMOVING CONC (SIDEWALKS)
SY 100.000 $20.000 $15.000 $12.000 $10.000 $8.500
REMOVING CONC (MISC)
SY 186.000 $20.000 $15.000 $12.000 $10.000 $7.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,183.000 $5.000 $8.000 $4.000 $1.500 $8.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 47.000 $60.000 $15.000 $20.000 $10.000 $9.000
REMOVING CONC (FLUME)
SY 36.000 $25.000 $20.000 $30.000 $12.000 $15.500
EXCAVATION (ROADWAY)
CY 32,693.000 $8.000 $5.000 $4.500 $5.500 $7.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 46,194.000 $7.000 $6.500 $7.800 $5.500 $4.000
EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPR)
CY 1,369.000 $27.000 $30.000 $81.000 $35.000 $64.000
LANDSCAPE EDGE
LF 1,889.000 $10.000 $4.000 $6.000 $14.000 $18.200
VEGETATION BARRIER
SY 5,023.000 $4.000 $1.750 $1.500 $1.500 $1.100
FL BS (CMP IN PLC)(TY A GR 5)(8")
SY 54,496.000 $9.000 $7.600 $6.250 $7.000 $8.500
PRIME COAT (AE-P)
GAL 10,877.000 $5.000 $4.090 $3.250 $3.500 $2.100
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 11,964.000 $55.000 $69.000 $70.000 $75.000 $71.000
PLANE ASPH CONC PAV (0" TO 3 1/2")
SY 71,385.000 $3.500 $1.600 $0.750 $1.000 $1.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 159.000 $35.000 $150.000 $67.000 $95.000 $99.000
STRUCT EXCAV (BOX)
CY 925.000 $5.000 $10.000 $13.000 $1.000 $3.000
STRUCT EXCAV (PIPE)
CY 514.000 $5.000 $10.000 $8.000 $1.000 $3.000
CEM STABIL BKFL
CY 523.000 $140.000 $120.000 $85.000 $135.000 $79.000
FLOWABLE BACKFILL
CY 402.000 $130.000 $110.000 $103.000 $135.000 $112.000
TRENCH EXCAVATION PROTECTION
LF 588.000 $20.000 $4.000 $3.000 $9.000 $5.500
TEMPORARY SPL SHORING
SF 9,845.000 $8.000 $11.000 $17.500 $17.000 $33.000
DRILL SHAFT (18 IN)
LF 100.000 $140.000 $175.000 $130.000 $155.000 $172.000
DRILL SHAFT (36 IN)
LF 420.000 $190.000 $225.000 $210.000 $250.000 $290.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $275.000 $356.000 $345.000 $345.000 $340.000
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $400.000 $408.000 $400.000 $395.000 $390.000
CL A CONC (FLUME)
CY 82.500 $500.000 $280.000 $305.000 $350.000 $465.000
CL C CONC (ABUT)(HPC)
CY 55.000 $950.000 $700.000 $800.000 $650.000 $705.000
CL C CONC (CAP)(HPC)
CY 15.100 $1,400.000 $1,000.000 $1,100.000 $1,500.000 $1,385.000
CL C CONC (COLUMN)(HPC)
CY 22.200 $1,200.000 $1,000.000 $1,400.000 $1,000.000 $2,210.000
CL C CONC (RAIL FOUNDATION)
CY 309.200 $300.000 $320.000 $315.000 $325.000 $313.000
CL C CONC (COLLAR)
EA 6.000 $350.000 $350.000 $1,000.000 $650.000 $537.000
REINF CONC SLAB (HPC)
SF 6,240.000 $24.000 $20.000 $22.000 $20.000 $20.200
APPROACH SLAB (HPC)
CY 42.000 $582.000 $350.000 $425.000 $450.000 $442.000
RETAINING WALL (CAST - IN - PLACE)
SF 5,330.000 $70.000 $50.000 $58.000 $65.000 $59.000
RETAINING WALL (SPECIAL)
SF 788.000 $70.000 $55.000 $73.000 $35.000 $50.000
PRESTR CONC GIRDER (TX54)
LF 956.000 $179.000 $185.000 $160.000 $180.000 $195.000
CONCRETE PAINT FINISH
SF 24,060.000 $1.000 $1.600 $0.300 $0.500 $0.860
OPAQUE SEALER FINISH
SF 24,060.000 $0.600 $0.550 $0.300 $0.750 $0.750
RIPRAP (CONC)(5 IN)
CY 39.000 $350.000 $280.000 $270.000 $250.000 $307.000
RIPRAP (CONC)(CL B)
CY 423.000 $300.000 $270.000 $269.000 $250.000 $288.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 210.000 $462.000 $300.000 $260.000 $475.000 $295.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 156.000 $250.000 $50.000 $94.000 $85.000 $63.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 4,402.000 $85.000 $70.000 $71.000 $60.000 $74.000
RIPRAP (CONC)(FLUME)
CY 97.000 $500.000 $300.000 $275.000 $260.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 73.000 $700.000 $270.000 $325.000 $375.000 $385.000
STR STEEL (MISC NON - BRIDGE)
LB 866.000 $12.000 $12.000 $10.000 $20.000 $13.000
RAIL (TY T551)
LF 2,277.000 $45.000 $50.000 $70.000 $45.000 $64.000
RAIL (TY T551)(HPC)
LF 552.000 $70.000 $65.000 $80.000 $75.000 $48.000
RAIL (TY PR1)
LF 850.000 $100.000 $85.000 $92.000 $85.000 $101.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 52.000 $100.000 $80.000 $105.000 $80.000 $99.000
GABION MATTRESSES (GALV)(18 IN)
SY 1,342.000 $115.000 $55.000 $72.000 $65.000 $94.000
CONC BOX CULV (5 FT X 3 FT)
LF 252.000 $265.000 $300.000 $285.000 $250.000 $300.000
CONC BOX CULV (6 FT X 3 FT)
LF 664.000 $300.000 $315.000 $320.000 $325.000 $325.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 7.000 $500.000 $500.000 $600.000 $750.000 $1,900.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 44.000 $500.000 $400.000 $650.000 $375.000 $1,500.000
RC PIPE (CL III)(24 IN)
LF 998.000 $80.000 $65.000 $65.000 $62.000 $91.000
RC PIPE (CL III)(30 IN)
LF 95.000 $100.000 $110.000 $108.000 $95.000 $277.000
RC PIPE (CL III)(42 IN)
LF 10.000 $130.000 $160.000 $397.000 $275.000 $450.000
RC PIPE (CL III)(48 IN)
LF 7.000 $145.000 $190.000 $500.000 $275.000 $616.000
RC PIPE (CL III)(54 IN)
LF 10.000 $165.000 $220.000 $650.000 $300.000 $835.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
EA 4.000 $3,300.000 $4,500.000 $6,200.000 $4,200.000 $4,200.000
HEADWALL (CH - FW - 30) (DIA= 30 IN)
EA 1.000 $5,300.000 $5,000.000 $9,300.000 $9,000.000 $11,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $6,000.000 $4,000.000 $4,800.000 $5,500.000 $11,000.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $8,500.000 $6,000.000 $9,000.000 $9,000.000 $12,000.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 1.000 $8,700.000 $7,000.000 $9,800.000 $10,000.000 $12,500.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $10,000.000 $4,000.000 $4,700.000 $6,000.000 $11,200.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $11,500.000 $5,000.000 $6,300.000 $9,000.000 $11,300.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $13,000.000 $5,500.000 $9,000.000 $9,500.000 $11,700.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $8,000.000 $4,000.000 $7,700.000 $7,000.000 $12,600.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $8,500.000 $5,000.000 $8,400.000 $8,500.000 $9,100.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $11,500.000 $5,000.000 $8,700.000 $8,500.000 $9,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $15,000.000 $7,000.000 $10,500.000 $10,500.000 $12,900.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $22,000.000 $8,000.000 $12,000.000 $12,500.000 $13,300.000
WINGWALL (SPL)
EA 1.000 $25,000.000 $10,000.000 $15,500.000 $20,000.000 $16,100.000
SET (TY I) (24 IN) (4: 1) (C)
EA 4.000 $2,000.000 $2,000.000 $1,600.000 $1,500.000 $2,400.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 8.000 $750.000 $8,060.000 $7,800.000 $8,000.000 $7,700.000
REMOV STR (HEADWALL)
EA 8.000 $1,500.000 $500.000 $1,900.000 $1,800.000 $215.000
REMOV STR (PIPE)
LF 1,211.000 $15.000 $9.000 $12.000 $19.000 $4.200
REMOV STR (MASONARY)
LF 30.000 $50.000 $100.000 $160.000 $20.000 $44.000
MOBILIZATION
LS 1.000 $370,899.000 $700,000.000 $775,000.000 $750,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $14,000.000 $9,500.000 $12,000.000 $13,500.000 $18,100.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 970.000 $25.000 $40.000 $40.000 $75.000 $26.700
ROCK FILTER DAMS (REMOVE)
LF 970.000 $7.000 $6.000 $9.000 $16.000 $8.700
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 720.000 $20.000 $20.000 $11.000 $12.000 $9.000
CONSTRUCTION EXITS (REMOVE)
SY 720.000 $10.000 $8.000 $6.000 $6.000 $0.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 810.000 $1.500 $3.000 $4.500 $5.500 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 810.000 $1.000 $1.000 $1.000 $1.250 $1.000
CONSTRUCTING DETOURS
SY 14,857.000 $28.000 $24.000 $20.000 $22.000 $25.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 18,210.000 $7.500 $6.000 $5.000 $4.250 $6.500
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 29,220.000 $7.000 $3.000 $3.500 $3.250 $6.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 18,210.000 $7.500 $4.000 $4.750 $4.000 $4.700
CONC CURB (TY II)
LF 52.000 $5.000 $15.000 $22.000 $20.000 $9.000
CONC CURB & GUTTER (TY II)
LF 29,199.000 $9.000 $10.000 $9.500 $13.000 $9.600
DRIVEWAYS (CONC)
SY 1,204.000 $50.000 $40.000 $38.000 $45.000 $38.500
CONC SIDEWALKS (4")
SY 52.000 $30.000 $60.000 $32.500 $35.000 $32.000
CURB RAMPS (TY 2)
EA 4.000 $2,800.000 $1,000.000 $1,000.000 $950.000 $940.000
CURB RAMPS (TY 21)
EA 1.000 $2,000.000 $1,000.000 $1,150.000 $1,200.000 $1,050.000
CONC MEDIAN
SY 19.000 $55.000 $100.000 $37.000 $38.000 $33.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,173.000 $23.000 $24.000 $23.000 $22.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,200.000 $1,900.000 $2,200.000 $1,850.000
SHORT RADIUS
LF 95.000 $30.000 $26.840 $46.000 $28.000 $46.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,250.000 $34.550 $1,800.000 $950.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 1,400.000 $4.000 $57.750 $2.950 $2.500 $2.800
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 1.000 $2,400.000 $4.000 $3,900.000 $3,200.000 $3,900.000
REMOVE CABLE BARRIER
LF 56.000 $10.000 $1,550.000 $10.000 $12.000 $10.500
REMOVE CABLE BARRIER TERMINAL SECTION
EA 1.000 $500.000 $5,000.000 $1,000.000 $600.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $800.000 $2,500.000 $2,500.000 $2,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $1,500.000 $750.000 $1,000.000 $1,500.000 $975.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $600.000 $750.000 $310.000 $250.000 $310.000
CRASH CUSH ATTEN (INSTL)
EA 16.000 $10,000.000 $750.000 $10,000.000 $8,500.000 $8,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 21.000 $1,650.000 $750.000 $1,600.000 $600.000 $1,400.000
CRASH CUSH ATTEN (REMOVE)
EA 14.000 $850.000 $970.000 $700.000 $500.000 $1,400.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 2.000 $1,500.000 $3,000.000 $2,800.000 $2,800.000 $2,800.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $2,500.000 $2,200.000 $1,900.000 $1,900.000 $1,860.000
CONDT (PVC) (SCH 40) (2")
LF 810.000 $15.000 $26.840 $27.000 $26.000 $26.000
CONDT (PVC) (SCH 40) (3")
LF 2,920.000 $22.000 $34.550 $35.000 $33.000 $33.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 100.000 $40.000 $57.750 $56.000 $56.000 $56.000
ELEC CONDR (NO.8) INSULATED
LF 2,395.000 $2.000 $4.000 $3.500 $3.500 $3.500
GROUND BOX TY D (162922)
EA 1.000 $2,000.000 $1,550.000 $1,500.000 $1,500.000 $1,460.000
GROUND BOX TY 1 (122422)W/APRON
EA 4.000 $2,000.000 $5,000.000 $4,800.000 $4,800.000 $4,800.000
REMOVE GROUND BOX
EA 3.000 $550.000 $800.000 $550.000 $560.000 $555.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 51.000 $650.000 $750.000 $700.000 $700.000 $695.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $700.000 $750.000 $700.000 $700.000 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $800.000 $750.000 $710.000 $715.000 $710.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,000.000 $750.000 $700.000 $695.000 $690.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $965.000 $970.000 $900.000 $875.000 $870.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $950.000 $1,350.000 $1,300.000 $1,300.000 $1,300.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 2.000 $1,500.000 $850.000 $800.000 $790.000 $790.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,000.000 $2,400.000 $2,300.000 $2,800.000 $2,300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $375.000 $600.000 $400.000 $405.000 $400.000
REMOVE SM RD SN SUP&AM
EA 67.000 $162.000 $163.000 $160.000 $165.000 $158.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 17.000 $70.000 $63.000 $60.000 $75.000 $64.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $25.000 $20.000 $30.000 $10.000 $26.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 12,129.000 $0.500 $1.150 $2.000 $0.900 $1.100
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,165.000 $0.600 $2.150 $2.000 $2.050 $2.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,977.000 $1.000 $2.250 $2.000 $1.200 $1.450
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 9.000 $50.000 $80.000 $45.000 $65.000 $75.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,962.000 $1.000 $2.250 $2.000 $1.200 $1.450
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,565.000 $2.000 $5.000 $1.600 $2.000 $2.600
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 60.000 $2.000 $2.000 $0.850 $1.050 $1.020
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,330.000 $0.750 $1.500 $0.850 $1.050 $1.020
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 860.000 $2.000 $5.000 $1.750 $3.800 $3.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 210.000 $5.000 $9.000 $3.500 $7.450 $7.450
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 13.000 $45.000 $160.000 $55.000 $150.000 $147.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $45.000 $160.000 $55.000 $150.000 $147.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 17,730.000 $0.250 $1.250 $0.500 $0.700 $0.670
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,850.000 $0.500 $1.250 $0.750 $0.950 $0.920
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,935.000 $0.250 $1.000 $0.500 $0.700 $0.670
RE PM W/RET REQ TY II (Y) 4" (BRK)
LF 3,415.000 $0.200 $1.000 $0.550 $0.550 $0.520
REFL PAV MRKR TY I-C
EA 83.000 $3.000 $15.000 $3.250 $4.500 $4.100
REFL PAV MRKR TY II-A-A
EA 65.000 $2.750 $15.000 $3.250 $4.500 $4.100
REFL PAV MRKR TY II-C-R
EA 370.000 $2.500 $15.000 $3.250 $4.500 $4.100
ELIM EXT PAV MRK & MRKS (4")
LF 12,909.000 $0.400 $1.250 $0.550 $0.750 $0.750
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 45.000 $12.000 $9.000 $7.000 $8.000 $8.000
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 80.000 $10.000 $14.000 $12.600 $13.000 $12.600
TRF SIG CBL (TY A)(18 AWG)(5 CONDR)
LF 80.000 $8.000 $7.000 $5.100 $5.250 $5.100
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $2,850.000 $5,000.000 $4,500.000 $4,500.000 $4,450.000
RELOC TRF SG PL AM(S)SNGL MST ARM POLE
EA 1.000 $3,000.000 $5,000.000 $4,600.000 $4,600.000 $4,550.000
PEDESTRIAN PUSH BUTTON POLE
EA 1.000 $2,500.000 $2,275.000 $320.000 $350.000 $320.000
LANDSCAPE AMENITY
EA 2.000 $11,000.000 $15,000.000 $13,000.000 $18,000.000 $18,500.000
RMV,STCKPL,CLN,RELY LOSE AGRGT & BLDRS
STA 13.000 $1,500.000 $1,500.000 $2,000.000 $3,200.000 $4,700.000
RETROFIT DET WARN SURF(CAST IN PLACE)
EA 5.000 $1,350.000 $800.000 $135.000 $375.000 $110.000
AESTHETIC FENCE
LF 516.000 $125.000 $185.000 $400.000 $225.000 $245.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $100.000 $50.000 $150.000 $145.000
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 80.000 $10.000 $4.000 $3.500 $3.500 $3.400
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
LF 3,325.000 $5.000 $14.000 $13.000 $13.000 $12.700
FIBER OPTIC CABLE ROAD MARKER
EA 21.000 $450.000 $400.000 $360.000 $355.000 $355.000
CONDUIT (PREPARE)
LF 15.000 $2.000 $838.000 $7.500 $7.500 $7.300
GROUND BOX (PREPARE)
EA 2.000 $1,400.000 $2,400.000 $2,300.000 $2,300.000 $2,300.000
Totals: $7,890,470.600 $7,550,372.330 $7,795,378.300 $7,850,753.150 $8,086,337.650