EL PASO VARIOUS (0924-00-119)
Items: 92
County: EL PASO
Length: 236.4470 MILES
Highway: VARIOUS
District: EL PASO
Control Number: 0924-00-119
DBE Goal: 0.0%
Project: F 2025(291)
Guaranty: $90,000.00
Time: 122 WORKING DAYS
Engineer's Estimate: $4,523,277.59
Date: 12/04/2024 (1 year ago)
Contract Number: 12243210
Type: PREVENTIVE MAINTENANCE
Project ID: A00058845
Project Description: FY 2025 STRIPING
Mail/Deliver Bids To: N/A
EL PASO VARIOUS (0924-00-119)
Project Name: N/A
Project: F 2025(291)
Length: 236.4470 MILES
Project Type: TRAFFIC CONTROL DEVICES
Limits From: DISTRICTWIDE
Limits To: .
Project Description: FY 2025 STRIPING
BREWSTER US 67 (0075-01-024)
Project Name: ELP_US0067_1-TAR
Project: STP 2025(325)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: US 67 / US 90 JCT
Limits To: PECOS / BREWSTER COUNTY LINE
Project Description: MILLED CENTERLINE RUMBLE STRIPS
EL PASO GRAND RIVER DR (0924-06-662)
Project Name: ELP_GRANDRIVERDR_EPCOUNTY_1
Project: STP 2025(277)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: GRAND RIVER DRIVE
Limits To: NOTRE DAME LANE
Project Description: INSTALL CENTERLINE STRIPING
EL PASO WHITETAIL DEER DR (0924-06-661)
Project Name: ELP_WHITETAILDEERDR_EPCOUNTY_1
Project: STP 2025(277)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: (ON WHITETAIL DEER DR) GREG DR
Limits To: COTTONTAIL DR
Project Description: INSTALL CENTERLINE STRIPING
EL PASO SH 20 (0001-01-071)
Project Name: ELP_SH0020_1-CAT11S (2022)
Project: F 2025(326)
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: LINDBERGH AVE
Limits To: MESA ST
Project Description: INSTALL CONTINUOUS TURN LANE
Bidders (4)
| Bidder | Total Amount | Over/Under Est | Amt Left From Low Bid | Delta Between Bidders |
|---|---|---|---|---|
|
E
Engineer's Estimate
|
$4,523,277.59 | |||
| $3,964,117.93 |
-12.36%
-$559,159.66
|
|||
| $4,492,765.11 |
-0.67%
-$30,512.48
|
13.34%
$528,647.18
|
||
| $4,651,889.88 |
2.84%
$128,612.29
|
17.35%
$687,771.95
|
-3.54%
-$159,124.77
|
|
| $5,724,056.11 |
26.55%
$1,200,778.52
|
44.4%
$1,759,938.18
|
-23.05%
-$1,072,166.23
|
E
Engineer's Estimate
$4,523,277.59
1
Awarded
$3,964,117.93
Over/Under Est:
-12.36%
-$559,159.66
$4,492,765.11
Over/Under Est:
-0.67%
-$30,512.48
Amt Left:
13.34%
$528,647.18
$4,651,889.88
Over/Under Est:
2.84%
$128,612.29
Amt Left:
17.35%
$687,771.95
Delta:
-3.54%
-$159,124.77
$5,724,056.11
Over/Under Est:
26.55%
$1,200,778.52
Amt Left:
44.4%
$1,759,938.18
Delta:
-23.05%
-$1,072,166.23
Bid Items & Bid Tabulations
92
Total
0 of 92
