EL PASO FM 76 (0674-02-011)

Items: 68

County: EL PASO
Length: N/A
Highway: FM 76
District: EL PASO
Control Number: 0674-02-011
DBE Goal: N/A
Project: BR 2000(030)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $2,217,744.08
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,217,744.08
$2,025,296.00
Over/Under Est: -8.68% -$192,448.08
Over/Under Est: 0.08% $1,687.92
Amt Left: 9.59% $194,136.00
Over/Under Est: 1.38% $30,542.32
Amt Left: 11.01% $222,990.40
Delta: -1.30% -$28,854.40

Bid Items & Bid Tabulations

68 Total 0 of 68
EL PASO  |  FM 76  |  EL PASO  |  0674-02-011  |  07/11/2017  |  $2,217,744.08  |  BR 2000(030)  |  REPLACE BRIDGES AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
INTERNATIONAL EAGLE ENTERPRISES, INC.
LESNA CONSTRUCTION, INC.
PREPARING ROW
STA 6.000 $4,041.670 $2,000.000 $1,000.000 $1,500.000
REMOVING CONC (PAV)
SY 356.000 $27.000 $15.000 $14.000 $15.000
REMOVING CONC (RIPRAP)
SY 57.000 $18.000 $10.000 $10.000 $12.000
REMOVING CONC (SIDEWALKS)
SY 61.000 $14.430 $10.000 $10.000 $12.000
REMOVING CONC (CURB AND GUTTER)
LF 119.000 $7.000 $3.000 $4.000 $5.000
REMOVE CONC (WINGWALL)
CY 2.000 $304.980 $150.000 $500.000 $150.000
REMOVING CONC (HEADWALL)
CY 2.000 $250.000 $150.000 $500.000 $150.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 995.000 $8.540 $2.000 $9.000 $5.000
EXCAVATION (ROADWAY)
CY 2.000 $5.070 $60.000 $500.000 $30.000
EXCAVATION (CHANNEL)
CY 426.000 $10.930 $20.000 $8.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 443.000 $12.130 $30.000 $8.000 $15.000
PROOF ROLLING
HR 6.000 $92.320 $60.000 $75.000 $70.000
FL BS (CMP IN PLC)(TY A GR 5)(6")
SY 1,073.000 $14.000 $11.000 $18.000 $12.000
PRIME COAT (AE-P)
GAL 221.000 $4.440 $5.000 $5.000 $6.000
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 214.000 $99.510 $110.000 $90.000 $95.000
D-GR HMA(SQ) TY-D PG64-22
TON 38.000 $176.570 $150.000 $125.000 $95.000
PLANE ASPH CONC PAV(2" TO 4")
SY 220.000 $12.590 $12.000 $18.000 $6.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 155.000 $48.760 $75.000 $46.000 $65.000
CEM STABIL BKFL
CY 214.000 $90.000 $110.000 $95.000 $90.000
TRENCH EXCAVATION PROTECTION
LF 80.000 $3.160 $5.000 $180.000 $5.000
DRILL SHAFT (30 IN)
LF 1,026.000 $153.770 $180.000 $185.000 $205.000
CL A CONC (FLUME)
CY 2.000 $1,122.000 $1,000.000 $600.000 $600.000
CL C CONC (ABUT)(HPC)
CY 54.000 $900.000 $1,600.000 $800.000 $770.000
CL C CONC (FOOTING)
CY 4.000 $604.680 $400.000 $500.000 $400.000
CL C CONC (CULV)
CY 28.000 $2,004.950 $700.000 $750.000 $900.000
CL C CONC (HEADWALL)
CY 4.000 $2,399.230 $700.000 $750.000 $600.000
CL C CONC (WINGWALLS)
CY 4.000 $700.000 $700.000 $750.000 $600.000
REINF CONC SLAB (HPC)
SF 6,646.000 $22.000 $11.000 $15.000 $20.000
BRIDGE SIDEWALK (HPC)
SF 2,700.000 $8.800 $10.000 $10.000 $8.000
APPROACH SLAB (HPC)
CY 168.000 $400.000 $450.000 $400.000 $425.000
SHEAR KEY
CY 66.000 $321.400 $180.000 $300.000 $325.000
PRESTR CONC BOX BEAM (5B34)
LF 1,296.000 $221.570 $230.000 $225.000 $285.000
CONCRETE PAINT FINISH
SF 2,465.000 $0.400 $1.000 $6.000 $1.500
RIPRAP (CONC)(4 IN)
CY 11.000 $419.100 $600.000 $350.000 $320.000
RIPRAP (CONC)(6 IN)
CY 6.000 $419.100 $600.000 $380.000 $320.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 58.000 $215.000 $75.000 $250.000 $80.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 292.000 $124.930 $85.000 $300.000 $75.000
RAIL (TY T221)
LF 386.000 $91.330 $300.000 $80.000 $220.000
RAIL (HANDRAIL)(TY B)
LF 40.000 $150.000 $80.000 $100.000 $148.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 184.000 $89.740 $60.000 $97.000 $90.000
REMOV STR (BOX CULVERT)
LF 37.000 $48.810 $30.000 $145.000 $65.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $30,000.000 $14,000.000 $50,000.000 $25,000.000
MOBILIZATION
LS 1.000 $116,999.400 $100,000.000 $100,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $3,000.000 $10,000.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,150.000 $5.000 $5.000 $7.000 $4.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,150.000 $1.610 $1.000 $1.000 $1.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 60.000 $7.650 $13.000 $30.000 $15.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 60.000 $7.650 $13.000 $30.000 $10.000
CONC CURB (TY II)
LF 176.000 $19.160 $11.000 $12.000 $10.000
CONC CURB & GUTTER (TY II)
LF 167.000 $10.370 $13.000 $18.000 $16.000
DRIVEWAYS (CONC)
SY 194.000 $38.490 $55.000 $33.000 $38.000
CONC SIDEWALKS (5")
SY 95.000 $81.260 $55.000 $35.000 $35.000
CURB RAMPS (TY 1)
EA 2.000 $1,366.760 $800.000 $1,000.000 $1,200.000
CURB RAMPS (TY 7)
EA 2.000 $1,025.170 $800.000 $1,000.000 $1,250.000
CURB RAMPS (TY 10)
EA 10.000 $875.000 $900.000 $1,000.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $575.170 $460.000 $300.000 $550.000
REMOVE SM RD SN SUP&AM
EA 6.000 $171.740 $95.000 $150.000 $170.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 6.000 $258.330 $35.000 $150.000 $250.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 6.000 $217.740 $40.000 $150.000 $220.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 9.000 $37.670 $15.000 $300.000 $35.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,056.000 $0.100 $1.000 $4.000 $1.100
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,030.000 $0.110 $1.000 $4.000 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,056.000 $0.400 $2.000 $4.000 $2.200
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,030.000 $0.400 $2.000 $4.000 $2.200
REFL PAV MRKR TY II-A-A
EA 28.000 $2.950 $5.000 $80.000 $5.200
DITCH CLEANING AND RESHAPING (FOOT)
LF 520.000 $64.100 $5.000 $20.000 $10.000
NO. OF WORKING DAYS
$/D 9,000.000 $95.000 $81.000 $88.000 $95.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $6.070 $5,000.000 $6,000.000 $8,000.000
Totals: $2,217,744.080 $2,025,296.000 $2,219,432.000 $2,248,286.400