|
|
PREPARING ROW
|
STA
|
275.000
|
$4,000.000
|
$7,500.000
|
$12,697.790
|
$45,076.750
|
$50,900.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
2,900.000
|
$75.000
|
$12.000
|
$36.000
|
$15.550
|
$9.980
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
557.000
|
$40.000
|
$14.000
|
$21.000
|
$17.060
|
$21.780
|
|
|
REMOV CONC (CURB)
|
LF
|
541.000
|
$8.000
|
$4.500
|
$5.950
|
$7.950
|
$11.930
|
|
|
RMV (8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
263.000
|
$13.000
|
$18.000
|
$6.050
|
$14.940
|
$28.070
|
|
|
RMV (18") TRT/UNTRT BASE & ASPH PAV
|
SY
|
23,432.000
|
$15.000
|
$3.750
|
$7.400
|
$11.040
|
$10.650
|
|
|
RMV (7"-13") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,445.000
|
$10.000
|
$3.000
|
$5.950
|
$12.440
|
$7.900
|
|
|
EXCAV (ROADWAY)
|
CY
|
187,107.000
|
$14.000
|
$9.000
|
$9.600
|
$8.880
|
$1.850
|
|
|
EXCAV (SPECIAL)
|
CY
|
97,933.000
|
$20.000
|
$9.000
|
$9.950
|
$6.050
|
$4.180
|
|
|
EMBANK (FNL)(DC)(TY A)
|
CY
|
996,181.000
|
$20.000
|
$16.000
|
$16.500
|
$8.990
|
$13.420
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
1,000.000
|
$80.000
|
$50.000
|
$47.000
|
$40.000
|
$189.600
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
|
SY
|
391,479.000
|
$12.000
|
$11.000
|
$11.000
|
$10.950
|
$10.370
|
|
|
CEMENT
|
TON
|
2,317.000
|
$260.000
|
$390.000
|
$270.000
|
$260.130
|
$285.270
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
380,204.000
|
$3.000
|
$1.500
|
$5.500
|
$3.290
|
$3.290
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
58,800.000
|
$6.000
|
$6.500
|
$7.600
|
$5.700
|
$8.920
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
85,030.000
|
$125.000
|
$105.000
|
$88.000
|
$98.990
|
$166.090
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
41,362.000
|
$175.000
|
$125.000
|
$115.000
|
$123.710
|
$183.690
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
7,150.000
|
$15.000
|
$2.500
|
$0.900
|
$3.900
|
$1.430
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
6,265.000
|
$60.000
|
$1.000
|
$6.350
|
$5.000
|
$52.200
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
9,714.000
|
$35.000
|
$1.000
|
$6.150
|
$5.000
|
$52.200
|
|
|
CUT & RESTORING PAV
|
SY
|
148.000
|
$350.000
|
$300.000
|
$171.000
|
$508.040
|
$294.870
|
|
|
CEM STABIL BKFL
|
CY
|
922.000
|
$500.000
|
$225.000
|
$173.000
|
$235.000
|
$140.560
|
|
|
FLOWABLE BACKFILL
|
CY
|
5,002.000
|
$250.000
|
$275.000
|
$180.000
|
$235.000
|
$180.080
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,080.000
|
$3.500
|
$6.500
|
$4.650
|
$2.500
|
$22.840
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
580.000
|
$120.000
|
$250.000
|
$260.000
|
$169.040
|
$137.740
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,348.000
|
$340.000
|
$300.000
|
$340.000
|
$245.710
|
$251.250
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
42.000
|
$450.000
|
$690.000
|
$690.000
|
$698.280
|
$765.480
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,974.000
|
$500.000
|
$500.000
|
$530.000
|
$389.740
|
$435.940
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
72.000
|
$340.000
|
$315.000
|
$320.000
|
$320.160
|
$351.290
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
1,213.000
|
$500.000
|
$725.000
|
$720.000
|
$730.360
|
$805.180
|
|
|
DRILL SHAFT (HIGH MAST POLE) (54 IN)
|
LF
|
972.000
|
$800.000
|
$900.000
|
$900.000
|
$899.000
|
$1,002.570
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
352.000
|
$900.000
|
$1,200.000
|
$1,200.000
|
$1,196.000
|
$1,333.790
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
169.000
|
$500.000
|
$440.000
|
$440.000
|
$439.000
|
$489.580
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$700.000
|
$700.000
|
$700.000
|
$699.400
|
$779.980
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
402.600
|
$1,900.000
|
$1,200.000
|
$1,660.000
|
$1,577.060
|
$999.970
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
509.600
|
$1,800.000
|
$1,600.000
|
$1,480.000
|
$1,192.200
|
$1,268.150
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
505.600
|
$1,750.000
|
$1,100.000
|
$1,140.000
|
$1,639.680
|
$1,022.470
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
317.000
|
$1,000.000
|
$550.000
|
$610.000
|
$878.200
|
$646.970
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
101,890.000
|
$50.000
|
$30.000
|
$34.000
|
$30.640
|
$29.800
|
|
|
APPROACH SLAB (HPC)
|
CY
|
612.600
|
$820.000
|
$650.000
|
$490.000
|
$729.690
|
$796.750
|
|
|
RET WALL (MSE) (HORIZONTAL SCHEME)
|
SF
|
258,244.000
|
$85.000
|
$50.000
|
$48.000
|
$78.710
|
$49.100
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
4,509.850
|
$180.000
|
$275.000
|
$300.000
|
$355.000
|
$304.740
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,469.660
|
$190.000
|
$275.000
|
$310.000
|
$355.000
|
$304.920
|
|
|
CONCRETE PAINT FINISH
|
SF
|
703,597.000
|
$1.000
|
$0.700
|
$0.540
|
$0.320
|
$0.300
|
|
|
OPAQUE SEALER FINISH
|
SF
|
703,597.000
|
$1.000
|
$0.820
|
$0.750
|
$0.320
|
$0.840
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
166.500
|
$1,500.000
|
$550.000
|
$580.000
|
$608.900
|
$670.460
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
723.000
|
$450.000
|
$400.000
|
$600.000
|
$615.480
|
$635.020
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
127.000
|
$1,000.000
|
$700.000
|
$660.000
|
$696.280
|
$705.580
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
109.000
|
$580.000
|
$800.000
|
$620.000
|
$644.710
|
$658.540
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,089.000
|
$300.000
|
$500.000
|
$603.000
|
$623.620
|
$635.020
|
|
|
RAIL (TY SSTR)
|
LF
|
12,782.000
|
$80.000
|
$55.000
|
$67.000
|
$51.490
|
$89.530
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
5,560.300
|
$190.000
|
$65.000
|
$85.000
|
$63.390
|
$109.310
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
197.000
|
$400.000
|
$550.000
|
$580.000
|
$575.610
|
$951.990
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
915.000
|
$280.000
|
$225.000
|
$300.000
|
$206.300
|
$306.090
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
331.000
|
$360.000
|
$425.000
|
$310.000
|
$245.640
|
$809.970
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
445.000
|
$375.000
|
$325.000
|
$340.000
|
$296.640
|
$332.560
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
218.000
|
$450.000
|
$475.000
|
$510.000
|
$435.220
|
$557.460
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
395.000
|
$490.000
|
$550.000
|
$620.000
|
$494.730
|
$555.200
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
119.000
|
$520.000
|
$725.000
|
$830.000
|
$622.720
|
$708.610
|
|
|
CONC BOX CULV (10 FT X 4 FT)
|
LF
|
586.000
|
$1,250.000
|
$1,150.000
|
$1,330.000
|
$1,040.160
|
$1,125.860
|
|
|
CONC BOX CULV (10 FT X 5 FT)
|
LF
|
851.000
|
$1,500.000
|
$1,200.000
|
$1,390.000
|
$1,094.900
|
$1,204.140
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,681.000
|
$150.000
|
$100.000
|
$132.000
|
$107.360
|
$93.550
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
3,105.000
|
$300.000
|
$275.000
|
$310.000
|
$314.200
|
$285.580
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
1,202.000
|
$90.000
|
$125.000
|
$113.000
|
$198.510
|
$90.970
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$9,200.000
|
$6,000.000
|
$9,000.000
|
$8,968.700
|
$8,356.390
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
17.000
|
$11,500.000
|
$8,500.000
|
$11,400.000
|
$11,389.540
|
$10,356.270
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$11,000.000
|
$7,500.000
|
$10,600.000
|
$12,439.680
|
$9,529.020
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$7,000.000
|
$7,000.000
|
$10,000.000
|
$10,969.710
|
$10,187.050
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$18,000.000
|
$4,000.000
|
$22,000.000
|
$7,554.620
|
$6,177.570
|
|
|
INLET (SPCL) (TY MSE2) (TOP ONLY)
|
EA
|
2.000
|
$12,000.000
|
$5,500.000
|
$9,500.000
|
$11,784.090
|
$12,843.610
|
|
|
INLET (COMPL) (TY MSE2)
|
EA
|
25.000
|
$9,300.000
|
$11,500.000
|
$10,100.000
|
$17,461.520
|
$18,542.260
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$12,000.000
|
$20,000.000
|
$15,900.000
|
$23,723.080
|
$8,493.860
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$15,000.000
|
$22,000.000
|
$18,400.000
|
$25,183.550
|
$9,800.950
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
3.000
|
$11,500.000
|
$10,000.000
|
$8,500.000
|
$16,309.550
|
$4,461.120
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$32,500.000
|
$16,000.000
|
$18,100.000
|
$20,419.830
|
$12,039.330
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$12,000.000
|
$15,000.000
|
$15,300.000
|
$16,792.810
|
$9,821.550
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$14,000.000
|
$24,000.000
|
$29,000.000
|
$40,640.800
|
$26,892.590
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
6.000
|
$27,000.000
|
$25,000.000
|
$38,000.000
|
$44,810.400
|
$35,312.610
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$27,150.000
|
$28,000.000
|
$48,000.000
|
$49,807.890
|
$41,248.510
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$27,300.000
|
$30,000.000
|
$60,000.000
|
$64,817.060
|
$56,746.190
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
3.000
|
$15,000.000
|
$15,000.000
|
$12,900.000
|
$22,286.160
|
$19,327.480
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$23,400.000
|
$25,000.000
|
$13,700.000
|
$31,714.040
|
$49,132.320
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$25,500.000
|
$28,000.000
|
$22,000.000
|
$30,874.800
|
$60,809.480
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$40,000.000
|
$30,000.000
|
$17,500.000
|
$36,219.340
|
$86,700.260
|
|
|
WINGWALL (SW - 0) (HW=4 FT)
|
EA
|
1.000
|
$12,000.000
|
$10,000.000
|
$8,900.000
|
$17,656.060
|
$6,782.330
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
25.000
|
$1,300.000
|
$2,300.000
|
$2,200.000
|
$3,456.120
|
$3,254.090
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$1,700.000
|
$2,400.000
|
$2,700.000
|
$2,531.220
|
$3,448.970
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$2,400.000
|
$2,700.000
|
$2,522.230
|
$3,524.400
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
48.000
|
$2,200.000
|
$2,400.000
|
$2,600.000
|
$3,780.120
|
$4,006.120
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,900.000
|
$2,400.000
|
$3,100.000
|
$2,799.300
|
$4,519.120
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$1,500.000
|
$1,200.000
|
$1,060.000
|
$1,344.430
|
$1,094.150
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
317.000
|
$200.000
|
$45.000
|
$79.000
|
$80.680
|
$42.980
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$12,000,000.000
|
$9,500,000.000
|
$11,523,244.600
|
$12,750,000.000
|
$13,993,721.880
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
59.000
|
$3,000.000
|
$25,000.000
|
$11,000.000
|
$50,145.500
|
$12,600.510
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$12,250.000
|
$15,000.000
|
$13,000.000
|
$18,294.500
|
$21,844.170
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$315.000
|
$185.000
|
$270.000
|
$275.000
|
$384.520
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
240.000
|
$250.000
|
$550.000
|
$380.000
|
$350.000
|
$694.150
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
2,522.000
|
$50.000
|
$27.000
|
$37.000
|
$36.000
|
$61.340
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,522.000
|
$22.000
|
$12.000
|
$15.500
|
$15.000
|
$27.880
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,016.000
|
$45.000
|
$32.500
|
$24.000
|
$30.000
|
$61.340
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,016.000
|
$20.000
|
$14.000
|
$12.500
|
$12.000
|
$13.380
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
34,563.000
|
$7.000
|
$4.250
|
$5.300
|
$5.150
|
$6.690
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
34,563.000
|
$2.000
|
$1.350
|
$1.200
|
$1.150
|
$2.230
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
4,630.000
|
$10.000
|
$7.250
|
$5.450
|
$5.250
|
$7.810
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,630.000
|
$4.000
|
$1.950
|
$1.550
|
$1.500
|
$2.230
|
|
|
CONSTRUCTING DETOURS
|
SY
|
24,897.000
|
$40.000
|
$70.000
|
$63.000
|
$62.430
|
$181.970
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
5,670.000
|
$90.000
|
$10.000
|
$15.000
|
$12.320
|
$12.490
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
21,450.000
|
$20.000
|
$5.500
|
$6.900
|
$6.050
|
$5.750
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
5,670.000
|
$15.000
|
$5.250
|
$15.500
|
$11.320
|
$12.490
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
5,994.000
|
$140.000
|
$125.000
|
$114.000
|
$112.680
|
$162.360
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
321.000
|
$280.000
|
$250.000
|
$230.000
|
$278.470
|
$349.470
|
|
|
PERM CTB (SGL SLOPE) (MOD)
|
LF
|
1,060.000
|
$500.000
|
$550.000
|
$360.000
|
$584.970
|
$488.070
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
2,628.000
|
$130.000
|
$90.000
|
$83.000
|
$104.480
|
$88.200
|
|
|
CONC CURB (TY IV)
|
LF
|
5,918.000
|
$20.000
|
$17.500
|
$12.000
|
$18.800
|
$12.940
|
|
|
CONC SIDEWALKS (5")
|
SY
|
678.000
|
$120.000
|
$80.000
|
$61.000
|
$72.080
|
$68.990
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$4,000.000
|
$2,200.000
|
$1,330.000
|
$1,320.000
|
$1,411.100
|
|
|
CURB RAMPS (TY 7)
|
EA
|
21.000
|
$3,000.000
|
$2,100.000
|
$1,110.000
|
$1,100.000
|
$1,175.970
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
250.000
|
$415.000
|
$350.000
|
$500.000
|
$463.000
|
$557.600
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
10,063.000
|
$30.000
|
$30.000
|
$31.000
|
$30.160
|
$49.310
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
53.000
|
$2,000.000
|
$1,450.000
|
$2,100.000
|
$1,100.000
|
$3,082.040
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
7.000
|
$2,500.000
|
$2,800.000
|
$3,500.000
|
$3,000.750
|
$4,314.830
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
60.000
|
$3,000.000
|
$3,400.000
|
$3,500.000
|
$2,990.000
|
$4,931.250
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$3,500.000
|
$900.000
|
$1,530.000
|
$1,280.000
|
$7,806.450
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
15.000
|
$2,000.000
|
$750.000
|
$1,530.000
|
$1,080.000
|
$5,576.040
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
34.000
|
$12,000.000
|
$20,500.000
|
$12,200.000
|
$7,750.000
|
$20,073.760
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
11,536.000
|
$5.000
|
$8.000
|
$7.000
|
$20.000
|
$10.040
|
|
|
GATE (SPECIAL)
|
EA
|
6.000
|
$2,500.000
|
$8,500.000
|
$4,800.000
|
$8,000.000
|
$6,133.630
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
11,831.000
|
$30.000
|
$20.500
|
$42.000
|
$33.200
|
$34.200
|
|
|
HI MST IL POLE (125 FT)( 80 MPH)
|
EA
|
36.000
|
$59,000.000
|
$42,500.000
|
$42,000.000
|
$42,328.650
|
$47,205.280
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
11.000
|
$62,000.000
|
$52,500.000
|
$52,000.000
|
$52,049.000
|
$58,045.500
|
|
|
LED HI MST IL ASM (6 FIXT) (TY S)
|
EA
|
3.000
|
$43,200.000
|
$46,100.000
|
$46,000.000
|
$46,100.000
|
$51,411.100
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
13.000
|
$41,500.000
|
$46,000.000
|
$46,000.000
|
$45,929.000
|
$51,220.430
|
|
|
LED HI MST IL ASM (6 FIXT) (TY B)
|
EA
|
27.000
|
$41,000.000
|
$46,250.000
|
$46,000.000
|
$46,201.000
|
$51,523.760
|
|
|
LED HI MST IL ASM(6 FIXT) (TY B)SHLD
|
EA
|
4.000
|
$40,000.000
|
$46,700.000
|
$47,000.000
|
$46,669.000
|
$52,045.660
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
36,934.000
|
$19.500
|
$29.000
|
$29.000
|
$28.800
|
$32.120
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
4,975.000
|
$34.000
|
$28.000
|
$28.000
|
$27.500
|
$30.670
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
37,144.000
|
$49.000
|
$30.350
|
$30.000
|
$30.330
|
$33.820
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
5,895.000
|
$80.000
|
$29.000
|
$29.000
|
$29.000
|
$32.340
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
545.000
|
$28.000
|
$32.000
|
$32.000
|
$32.000
|
$35.690
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
185.000
|
$60.000
|
$40.000
|
$40.000
|
$40.000
|
$44.610
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
906.000
|
$22.000
|
$26.000
|
$26.000
|
$26.000
|
$29.000
|
|
|
CONDT (RM) (1")
|
LF
|
1,720.000
|
$34.000
|
$30.000
|
$30.000
|
$29.870
|
$33.310
|
|
|
CONDUIT (PREPARE)
|
LF
|
390.000
|
$4.000
|
$5.000
|
$5.000
|
$5.000
|
$5.580
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
32,914.000
|
$49.120
|
$45.000
|
$45.000
|
$44.910
|
$50.080
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
3,205.000
|
$60.000
|
$42.500
|
$42.000
|
$42.190
|
$47.050
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
31.000
|
$170.000
|
$125.000
|
$125.000
|
$125.000
|
$139.400
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
39,769.000
|
$2.000
|
$1.600
|
$1.600
|
$1.600
|
$1.780
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
44,547.000
|
$2.500
|
$3.050
|
$3.050
|
$3.050
|
$3.400
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
51,464.000
|
$5.100
|
$3.150
|
$3.150
|
$3.150
|
$3.510
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
27,240.000
|
$4.250
|
$4.000
|
$4.000
|
$4.000
|
$4.460
|
|
|
ITS GND BOX (POLY) TY 1 (243648)W/APRN
|
EA
|
76.000
|
$9,500.000
|
$3,855.000
|
$3,900.000
|
$3,852.000
|
$4,295.780
|
|
|
ITS GND BOX (POLY) TY 2 (366048)W/APRN
|
EA
|
12.000
|
$6,500.000
|
$6,300.000
|
$6,300.000
|
$6,300.000
|
$7,025.810
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
162.000
|
$1,900.000
|
$1,605.000
|
$1,600.000
|
$1,602.000
|
$1,786.560
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
27.000
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,230.420
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
4.000
|
$12,000.000
|
$9,000.000
|
$8,900.000
|
$8,900.000
|
$9,925.350
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
|
EA
|
3.000
|
$11,500.000
|
$11,000.000
|
$11,000.000
|
$11,000.000
|
$12,267.260
|
|
|
ELC SRV TY D 120/240 060(NS)GS(N)GC(O)
|
EA
|
1.000
|
$5,000.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$11,152.050
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)GC(O)
|
EA
|
2.000
|
$9,000.000
|
$9,000.000
|
$9,000.000
|
$8,991.000
|
$10,026.820
|
|
|
ELC SRV TY D 120/240 070(NS)GS(N)GC(O)
|
EA
|
1.000
|
$12,000.000
|
$9,000.000
|
$9,000.000
|
$8,999.000
|
$10,035.730
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
605.000
|
$40.000
|
$39.000
|
$39.000
|
$38.640
|
$43.090
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,283.000
|
$50.000
|
$40.000
|
$40.000
|
$39.660
|
$44.230
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
56.000
|
$900.000
|
$905.000
|
$900.000
|
$903.000
|
$1,007.030
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
83.000
|
$1,000.000
|
$990.000
|
$990.000
|
$988.000
|
$1,101.830
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
22.000
|
$1,150.000
|
$1,250.000
|
$1,210.000
|
$1,214.000
|
$1,353.860
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,200.000
|
$1,250.000
|
$1,200.000
|
$1,204.000
|
$1,342.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
8.000
|
$1,250.000
|
$1,850.000
|
$1,850.000
|
$1,846.200
|
$2,058.890
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
4.000
|
$1,900.000
|
$1,850.000
|
$1,820.000
|
$1,823.600
|
$2,033.690
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
7.000
|
$3,000.000
|
$3,500.000
|
$3,300.000
|
$3,333.000
|
$3,716.990
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
8.000
|
$4,000.000
|
$3,600.000
|
$3,600.000
|
$3,596.000
|
$4,010.290
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$400.000
|
$220.000
|
$220.000
|
$220.000
|
$245.340
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
|
EA
|
5.000
|
$5,500.000
|
$3,000.000
|
$3,000.000
|
$3,000.000
|
$3,345.620
|
|
|
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
|
EA
|
4.000
|
$6,200.000
|
$3,200.000
|
$3,100.000
|
$3,133.400
|
$3,494.400
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,854.000
|
$9.000
|
$8.550
|
$8.550
|
$8.550
|
$9.540
|
|
|
INS OH SN SUP(35 FT CANT)(CIRC TUBE)
|
EA
|
12.000
|
$140,000.000
|
$115,000.000
|
$111,000.000
|
$111,226.920
|
$124,041.240
|
|
|
INS OH SN SUP(40 FT CANT)(CIRC TUBE)
|
EA
|
1.000
|
$155,000.000
|
$115,000.000
|
$111,000.000
|
$111,167.390
|
$123,974.850
|
|
|
INS OH SN SUP(50 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$175,000.000
|
$115,000.000
|
$111,000.000
|
$110,969.990
|
$123,754.690
|
|
|
INS OH SN SUP(55 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$185,000.000
|
$115,000.000
|
$113,000.000
|
$113,441.720
|
$126,511.210
|
|
|
INS OH SN SUP(65 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$199,000.000
|
$125,000.000
|
$119,000.000
|
$118,930.690
|
$132,632.550
|
|
|
INS OH SN SUP(70 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$220,000.000
|
$125,000.000
|
$121,000.000
|
$120,515.230
|
$134,399.550
|
|
|
INS OH SN SUP(75 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$250,000.000
|
$180,000.000
|
$175,000.000
|
$175,000.300
|
$195,161.820
|
|
|
INS OH SN SUP(90 FT BRDG)(CIRC TUBE)
|
EA
|
1.000
|
$380,000.000
|
$195,000.000
|
$189,000.000
|
$188,517.240
|
$210,235.990
|
|
|
INS OH SN SUP(110 FT COMB)(CIRC TUBE)
|
EA
|
1.000
|
$450,000.000
|
$210,000.000
|
$202,000.000
|
$201,969.620
|
$225,238.240
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
62.000
|
$70.000
|
$60.000
|
$35.000
|
$35.270
|
$55.480
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
34.000
|
$35.000
|
$60.000
|
$30.000
|
$45.830
|
$92.460
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
26.000
|
$45.000
|
$60.000
|
$35.000
|
$34.920
|
$55.480
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
14.000
|
$110.000
|
$175.000
|
$95.000
|
$85.290
|
$128.390
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$40.000
|
$75.000
|
$57.000
|
$25.190
|
$49.810
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
41,631.000
|
$3.500
|
$1.050
|
$1.150
|
$1.250
|
$1.260
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
49,018.000
|
$1.500
|
$1.050
|
$1.150
|
$1.250
|
$1.260
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
41,631.000
|
$1.000
|
$1.050
|
$1.150
|
$1.250
|
$1.260
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
49,018.000
|
$3.000
|
$1.050
|
$1.150
|
$1.250
|
$1.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,051.000
|
$2.000
|
$2.350
|
$2.750
|
$2.550
|
$4.940
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,123.000
|
$2.500
|
$2.350
|
$2.750
|
$1.470
|
$4.940
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
4,987.000
|
$1.150
|
$1.240
|
$1.350
|
$1.410
|
$1.490
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,487.000
|
$2.000
|
$1.340
|
$1.450
|
$1.530
|
$1.610
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
3,364.000
|
$1.500
|
$2.350
|
$2.550
|
$2.650
|
$2.820
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,890.000
|
$2.900
|
$3.050
|
$3.350
|
$3.430
|
$3.670
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
1,217.000
|
$14.000
|
$8.000
|
$8.750
|
$8.630
|
$9.610
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
24.000
|
$290.000
|
$135.000
|
$147.000
|
$137.510
|
$162.180
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
16.000
|
$240.000
|
$180.000
|
$197.000
|
$188.720
|
$216.240
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
10.000
|
$330.000
|
$350.000
|
$380.000
|
$355.900
|
$420.480
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
22.000
|
$360.000
|
$150.000
|
$164.000
|
$148.300
|
$180.210
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
|
EA
|
6.000
|
$540.000
|
$830.000
|
$910.000
|
$947.970
|
$997.120
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
|
EA
|
6.000
|
$550.000
|
$1,240.000
|
$1,350.000
|
$1,420.340
|
$1,489.700
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
39,770.000
|
$1.700
|
$1.100
|
$1.200
|
$1.250
|
$1.330
|
|
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
|
LF
|
39,791.000
|
$2.500
|
$1.100
|
$1.200
|
$1.250
|
$1.330
|
|
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
|
LF
|
17,026.000
|
$0.900
|
$0.870
|
$0.950
|
$1.000
|
$1.050
|
|
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
|
LF
|
48,674.000
|
$1.400
|
$0.810
|
$0.880
|
$0.920
|
$0.970
|
|
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
|
LF
|
55,253.000
|
$1.200
|
$0.810
|
$0.880
|
$0.930
|
$0.970
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
109.000
|
$25.000
|
$6.000
|
$6.550
|
$6.830
|
$7.200
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,404.000
|
$15.000
|
$5.250
|
$5.750
|
$6.830
|
$6.310
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
29,149.000
|
$2.000
|
$0.650
|
$0.710
|
$0.580
|
$0.780
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
444.000
|
$2.500
|
$1.300
|
$1.400
|
$1.440
|
$1.560
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
80.000
|
$7.000
|
$2.600
|
$2.850
|
$2.890
|
$3.120
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
7.000
|
$200.000
|
$120.000
|
$131.000
|
$128.360
|
$144.150
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
7.000
|
$200.000
|
$130.000
|
$142.000
|
$144.410
|
$156.170
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$50,000.000
|
$45,000.000
|
$39,000.000
|
$39,444.000
|
$43,988.290
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$30,000.000
|
$37,000.000
|
$37,000.000
|
$36,999.000
|
$41,261.600
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
26.000
|
$380.000
|
$440.000
|
$440.000
|
$440.000
|
$490.690
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
23.000
|
$400.000
|
$429.000
|
$430.000
|
$429.000
|
$478.420
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
36.000
|
$410.000
|
$422.000
|
$420.000
|
$422.000
|
$470.620
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
9.000
|
$350.000
|
$406.000
|
$410.000
|
$406.000
|
$452.770
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
36.000
|
$380.000
|
$421.000
|
$420.000
|
$421.000
|
$469.500
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
9.000
|
$350.000
|
$400.000
|
$400.000
|
$400.000
|
$446.080
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
23.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,115.210
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
4.000
|
$310.000
|
$300.000
|
$300.000
|
$300.000
|
$334.550
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
41.000
|
$225.000
|
$285.000
|
$290.000
|
$285.000
|
$317.830
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
10,149.000
|
$1.900
|
$1.700
|
$1.700
|
$1.690
|
$1.880
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
10,325.000
|
$3.500
|
$3.000
|
$3.000
|
$2.990
|
$3.330
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
2,939.000
|
$3.750
|
$3.400
|
$3.350
|
$3.360
|
$3.750
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
6,615.000
|
$5.500
|
$5.150
|
$5.100
|
$5.120
|
$5.710
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
6.000
|
$15,500.000
|
$16,000.000
|
$15,900.000
|
$15,883.000
|
$17,712.850
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$17,100.000
|
$16,000.000
|
$16,000.000
|
$15,996.000
|
$17,838.830
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
2.000
|
$15,600.000
|
$17,000.000
|
$16,600.000
|
$16,601.000
|
$18,513.560
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
4.000
|
$17,300.000
|
$17,000.000
|
$17,000.000
|
$16,982.000
|
$18,938.450
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
1.000
|
$40,500.000
|
$43,000.000
|
$43,000.000
|
$42,885.000
|
$47,825.730
|
|
|
PED POLE ASSEMBLY
|
EA
|
20.000
|
$5,000.000
|
$4,000.000
|
$3,400.000
|
$3,396.000
|
$3,787.240
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
23.000
|
$1,500.000
|
$935.000
|
$940.000
|
$935.000
|
$1,042.720
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$4,200.000
|
$4,000.000
|
$3,400.000
|
$3,397.400
|
$3,788.780
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
715,146.000
|
$1.500
|
$1.800
|
$1.750
|
$1.700
|
$0.840
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
76,039.000
|
$1.000
|
$5.500
|
$7.450
|
$9.560
|
$13.380
|
|
|
HEADWALL (STONE MASONRY)
|
SF
|
39,294.000
|
$18.000
|
$19.000
|
$22.000
|
$28.230
|
$27.880
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
2,315.000
|
$3.000
|
$3.050
|
$3.050
|
$3.050
|
$3.400
|
|
|
VIVDS PROSR SYS
|
EA
|
2.000
|
$8,500.000
|
$4,255.000
|
$4,300.000
|
$4,251.000
|
$4,740.740
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
15.000
|
$5,900.000
|
$6,000.000
|
$6,000.000
|
$5,981.000
|
$6,670.060
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
2.000
|
$600.000
|
$550.000
|
$550.000
|
$550.000
|
$613.350
|
|
|
VIVDS CABLING
|
LF
|
7,624.000
|
$4.400
|
$2.600
|
$2.600
|
$2.590
|
$2.890
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$40,000.000
|
$32,000.000
|
$32,000.000
|
$32,000.000
|
$35,686.570
|
|
|
ITS RVSD(DATA COLL ONLY)(INSTL ONLY)
|
EA
|
3.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,115.210
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
2.000
|
$30,000.000
|
$25,000.000
|
$25,000.000
|
$24,996.000
|
$27,875.740
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
2.000
|
$5,500.000
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
$6,691.230
|
|
|
GROUND BOX (PREPARE)
|
EA
|
8.000
|
$700.000
|
$600.000
|
$600.000
|
$600.000
|
$669.120
|
|
|
INSTALLATION OF CELLULAR MODEM
|
EA
|
4.000
|
$4,500.000
|
$1,755.000
|
$1,760.000
|
$1,755.000
|
$1,957.190
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
6.000
|
$3,200.000
|
$2,200.000
|
$2,200.000
|
$2,200.000
|
$2,453.450
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
180.000
|
$160.000
|
$135.000
|
$135.000
|
$135.000
|
$150.550
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
33,994.000
|
$5.000
|
$4.500
|
$4.500
|
$4.500
|
$5.020
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
14.000
|
$4,000.000
|
$2,650.000
|
$2,700.000
|
$2,650.000
|
$2,955.300
|
|
|
FIBER OPTIC CBL (SNGL-MODE)(72 FIBER)
|
LF
|
100.000
|
$8.000
|
$15.000
|
$15.000
|
$15.000
|
$16.730
|
|
|
FO CBL (12 SMF)(PIGTAIL)
|
LF
|
12,240.000
|
$5.000
|
$8.000
|
$7.850
|
$7.860
|
$8.770
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
2.000
|
$400.000
|
$1,075.000
|
$1,070.000
|
$1,072.000
|
$1,195.490
|
|
|
LED AESTHETIC LIGHT ASSEMBLY
|
EA
|
10.000
|
$20,000.000
|
$85,000.000
|
$84,000.000
|
$83,655.000
|
$93,292.800
|
|
Totals: |
$139,660,521.080
|
$112,560,910.840
|
$116,396,410.080
|
$129,141,414.045
|
$140,035,874.103
|