EL PASO BU 54A (0167-02-083)
Items: 179
County: EL PASO
Length: 0.2000 MILES
Highway: BU 54A
District: EL PASO
Control Number: 0167-02-083
DBE Goal: 5.0%
Project: STP 2025(711)VRU
Guaranty: $54,000.00
Time: 272 WORKING DAYS
Engineer's Estimate: $2,631,303.70
Date: 05/02/2025 (1 year ago)
Contract Number: 5253219
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184474
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JONATHAN CONCHA
EL PASO BU 54A (0167-02-083)
Project Name: N/A
Project: STP 2025(711)VRU
Length: 0.2000 MILES
Project Type: CONSTRUCTION
Limits From: AT DEER AVE
Limits To: .
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
EL PASO YARBROUGH (0924-06-683)
Project Name: ELP_YARBROUGHDR_COEP_1 (2022)
Project: STP 2B24(507)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT SAN PAULO DR
Limits To: .
Project Description: INSTALL TRAFFIC SIGNAL
EL PASO SH 20 (0001-01-072)
Project Name: ELP_SH0020_2-TAR (2022)
Project: STP 2025(782)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT MONTOYA RD
Limits To: .
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW
EL PASO LEE TREVINO DR (0924-06-717)
Project Name: LEE TREVINO SFTY (T WEISKOPF | MONTWOOD)
Project: STP 2025(737)HESG
Length: 0.0000 MILES
Project Type: HAZARD ELIMINATION & SAFETY
Limits From: (ON LEE TREVINO DR) TOM WEISKOPF DR
Limits To: 0.1 MI S OF MONTWOOD DR
Project Description: INSTALL WARNING/GUIDE SIGNS, IMPROVE SCHOOL ZONE, DYNAMIC SPEED FEEDBACK SIGNS
EL PASO PIEDRAS ST (0924-06-720)
Project Name: PIEDRAS SFTY (SH 20 | GATEWAY EAST BLVD)
Project: STP 2025(737)HESG
Length: 0.0000 MILES
Project Type: HAZARD ELIMINATION & SAFETY
Limits From: (ON PIEDRAS ST) SH 20
Limits To: GATEWAY EAST BLVD
Project Description: INSTALL LED FLASHING CHEVRONS (CURVE), INSTALL EDGE MARKING
EL PASO STANTON ST (0924-06-684)
Project Name: ELP_STANTONST_COEP_1 (2022)
Project: STP 2B24 (508)VRUG
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT BOSTON AVE
Limits To: .
Project Description: PEDESTRIAN HYBRID BEACON
EL PASO DIANA (0924-06-715)
Project Name: DIANA DR PED SAFETY (LOUIS | RILEY)
Project: STP 2025(737)HESG
Length: 0.0000 MILES
Project Type: HAZARD ELIMINATION & SAFETY
Limits From: (ON DIANA DR) LOUIS DR
Limits To: RILEY CT
Project Description: PEDESTRIAN HYBRID BEACON, INSTALL PEDESTRIAN CROSSWALK, INSTALL SIDEWALKS
EL PASO FM 2529 (2326-01-031)
Project Name: ELP_FM2529_1-TAR (2022)
Project: STP 2025(783)VRU
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT DEER AVE
Limits To: .
Project Description: IMPROVE TRAFFIC SIGNAL
EL PASO BU 54A (0167-02-090)
Project Name: ELP_BU0054A_2-CAT11S (2022)
Project: STP 2B24(507)HES
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT MESQUITE HILLS
Limits To: .
Project Description: INSTALL TRAFFIC SIGNALS
EL PASO FM 1281 (3451-01-049)
Project Name: ELP_FM1281_1-TAR
Project: F 2025(781)
Length: 0.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT ASCENCION ST
Limits To: .
Project Description: INSTALL TRAFFIC SIGNAL
EL PASO OTHER (0924-06-723)
Project Name: STANTON ST SFTY (MONTANA | MISSOURI)
Project: STP 2025(737)HESG
Length: 0.0000 MILES
Project Type: HAZARD ELIMINATION & SAFETY
Limits From: (ON STANTON ST) MONTANA AVE
Limits To: MISSOURI AVE
Project Description: INSTALL WARNING/GUIDE SIGNS, WRONG WAY DRIVER WARNING MARKINGS, DYNAMIC SPEED FEEDBACK SIGNS
EL PASO OTHER (0924-06-718)
Project Name: MONTWOOD DR SAFETY (NOVIEMBRE | RATNER)
Project: STP 2025(737)HESG
Length: 0.0000 MILES
Project Type: HAZARD ELIMINATION & SAFETY
Limits From: (ON MONTWOOD DR) NOVIEMBRE DR
Limits To: RATNER CIR
Project Description: IMPROVE SCHOOL ZONE, DYNAMIC SPEED FEEDBACK SIGNS, INSTALL PAVEMENT MARKINGS
Bidders (2)
| Bidder | Total Amount | Over/Under Est | Amt Left From Low Bid | Delta Between Bidders |
|---|---|---|---|---|
|
E
Engineer's Estimate
|
$2,631,303.70 | |||
| $2,664,961.83 |
1.28%
$33,658.13
|
|||
| $3,194,662.61 |
21.41%
$563,358.91
|
19.88%
$529,700.78
|
E
Engineer's Estimate
$2,631,303.70
1
Awarded
$2,664,961.83
Over/Under Est:
1.28%
$33,658.13
$3,194,662.61
Over/Under Est:
21.41%
$563,358.91
Amt Left:
19.88%
$529,700.78
Bid Items & Bid Tabulations
179
Total
0 of 179
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
| Description | Amount |
|---|---|
| SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) | $25,000.00 |
| EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) | $15,000.00 |
| PUBLIC UTILITY FORCE ACCT WORK (PART) | $70,000.00 |
| LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) | $65,000.00 |
| Total: | $175,000.00 |
