EL PASO FM 258 (0002-14-046)

Items: 108

County: EL PASO
Length: 0.0000 MILES
Highway: FM 258
District: EL PASO
Control Number: 0002-14-046
DBE Goal: 3.0%
Project: F 2025(864)
Guaranty: $24,000.00
Time: 119 WORKING DAYS
Engineer's Estimate: $1,220,791.57
Date: 07/02/2025 (11 months ago)
Contract Number: 7253228
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206569
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW, INSTALL SIDEWALKS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$1,220,791.57
$1,219,020.08
Over/Under Est: -0.15% -$1,771.49
Subcontractor Percentage Amount
TRI STATE ELECTRIC, LTD. 14.28% $177,653.14
APACHE BARRICADE & SIGN 7.70% $95,793.36
PMI PAVEMENT MARKING, LLC 7.32% $91,065.89
DLC CONSTRUCTION, INC. 0.33% $4,105.43
Total: 29.63% $368,617.82

Bid Items & Bid Tabulations

108 Total 0 of 108
EL PASO  |  FM 258  |  EL PASO  |  0002-14-046  |  07/02/2025  |  $1,220,791.57  |  F 2025(864)  |  HAZARD ELIM & SAFETY  |  119 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HORIZONE CONSTRUCTION I, LTD
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 3.000 $1,047.330 $1,374.900
REMOV CONC (DRIVEWAYS)
SY 74.000 $45.930 $13.610
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 22.000 $55.020 $13.620
REMOV CONC (CURB)
LF 33.000 $18.000 $25.280
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 518.000 $9.500 $13.610
EXCAV (ROADWAY)
CY 464.000 $39.310 $32.950
EMBANK (FNL)(DC)(TY A)
CY 76.000 $21.820 $77.470
LOOSE AGGR GRND COVER
SY 1,027.000 $30.000 $15.520
PRIME COAT (MULTI OPTION)
GAL 30.000 $18.440 $15.810
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 21.000 $255.800 $212.870
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
TON 98.000 $353.350 $212.870
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 24.000 $349.670 $456.680
ADJUSTING MANHOLES
EA 1.000 $1,576.430 $1,125.800
ADJUSTING MANHOLES (WATER METER)
EA 17.000 $788.220 $662.970
REMOVE STR (BOLLARD)
EA 5.000 $594.350 $1,157.060
REMOV STR (PIPE)
EA 1.000 $500.000 $1,157.060
MOBILIZATION
LS 1.000 $60,000.000 $41,654.250
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,500.000 $8,337.860
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 32.000 $140.000 $84.150
TMA (STATIONARY)
DAY 111.000 $275.000 $336.600
TMA (MOBILE OPERATION)
DAY 4.000 $489.520 $1,402.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,559.000 $5.170 $6.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,559.000 $1.590 $1.990
CONC CURB (TY II)
LF 464.000 $45.250 $19.030
CONC CURB (SPECIAL)
LF 3,171.000 $80.000 $97.910
DRIVEWAYS (CONC)
SY 1,104.000 $131.450 $82.710
CONC SIDEWALKS (5")
SY 1,814.000 $91.980 $69.650
CURB RAMPS (TY 2)
EA 2.000 $2,718.220 $1,857.760
CURB RAMPS (TY 7)
EA 5.000 $2,741.410 $1,823.680
CONC DIRECTIONAL ISLAND
SY 70.000 $140.130 $108.870
CHAIN LINK FENCE (INSTALL) (6')
LF 163.000 $38.170 $84.150
CHAIN LINK FENCE (REMOVE)
LF 146.000 $18.190 $52.510
WIRE FENCE (TY B)
LF 119.000 $45.000 $84.150
WIRE FENCE (REMOVE)
LF 106.000 $7.040 $50.400
RELOCATE EXISTING MAILBOX
EA 15.000 $484.680 $380.600
RELOCATE RD IL ASM (TRANS-BASE)
EA 3.000 $3,800.000 $3,930.840
CONDT (PVC) (SCH 40) (2")
LF 465.000 $19.160 $23.630
ELEC CONDR (NO.6) INSULATED
LF 1,485.000 $3.040 $3.910
GROUND BOX TY A (122311)W/APRON
EA 1.000 $2,096.890 $1,891.070
REMOVE GROUND BOX
EA 3.000 $500.000 $620.630
REMOVE ELECTRICAL SERVICES
EA 2.000 $914.900 $1,149.780
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
EA 1.000 $10,000.000 $13,215.130
ELC SRV TY D 120/240 060(NS)SS(E)GC(O)
EA 1.000 $10,000.000 $12,986.030
ALUMINUM SIGNS (TY A)
SF 54.000 $49.390 $43.180
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 33.000 $46.270 $39.350
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $838.410 $1,156.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $894.440 $1,222.100
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $1,000.000 $1,266.850
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $1,250.360 $1,566.610
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,086.800 $1,598.630
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $727.130 $557.230
REMOVE SM RD SN SUP&AM
EA 18.000 $157.770 $152.980
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000 $110.000 $68.850
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 7.000 $52.000 $46.710
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 1.000 $85.290 $46.710
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 120.000 $3.830 $2.290
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 80.000 $3.470 $2.290
REFL PAV MRK TY I (W)8"(BRK)(090MIL)
LF 12.000 $2.000 $3.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 728.000 $1.880 $2.550
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 142.000 $1.000 $5.720
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 764.000 $10.050 $12.170
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 20.000 $180.000 $210.380
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
EA 4.000 $125.000 $231.410
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 10.000 $200.000 $220.190
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 9.000 $48.330 $78.960
RE PM TY II (W) 6" (SLD)
LF 2,734.000 $0.950 $1.300
RE PM TY II (W) 8" (BRK)
LF 12.000 $2.000 $1.220
RE PM TY II (W) 8" (SLD)
LF 728.000 $0.440 $1.020
RE PM TY II (W) 12" (SLD)
LF 142.000 $2.500 $2.880
RE PM TY II (W) 24" (SLD)
LF 764.000 $3.000 $5.960
RE PM TY II (W) (ARROW)
EA 20.000 $50.000 $137.450
RE PM TY II (W) (NUMBER)
EA 4.000 $100.000 $152.870
RE PM TY II (W) (WORD)
EA 10.000 $75.000 $127.980
RE PM TY II (W) 18" (YLD TRI)
EA 9.000 $29.750 $85.900
RE PM TY II (Y) 6" (BRK)
LF 1,070.000 $0.580 $1.600
RE PM TY II (Y) 6" (SLD)
LF 8,789.000 $0.600 $0.380
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 2,734.000 $0.820 $0.350
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 1,070.000 $0.910 $1.050
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 8,789.000 $0.950 $1.280
REFL PAV MRKR TY I-C
EA 34.000 $6.130 $12.410
REFL PAV MRKR TY II-A-A
EA 345.000 $6.540 $12.410
ELIM EXT PM & MRKS (6")
LF 15,460.000 $0.780 $1.160
ELIM EXT PM & MRKS (8")
LF 684.000 $1.340 $1.330
ELIM EXT PM & MRKS (12")
LF 112.000 $1.910 $7.740
ELIM EXT PM & MRKS (24")
LF 311.000 $4.240 $10.320
ELIM EXT PM & MRKS (ARROW)
EA 10.000 $83.910 $232.130
ELIM EXT PM & MRKS (WORD)
EA 3.000 $92.110 $206.340
PAV SURF PREP FOR MRK (6")
LF 12,605.000 $0.440 $0.280
PAV SURF PREP FOR MRK (8")
LF 728.000 $0.460 $0.320
PAV SURF PREP FOR MRK (12")
LF 142.000 $0.660 $0.380
PAV SURF PREP FOR MRK (24")
LF 764.000 $3.140 $0.520
PAV SURF PREP FOR MRK (ARROW)
EA 20.000 $58.770 $54.560
PAV SURF PREP FOR MRK (NUMBER)
EA 4.000 $31.700 $58.910
PAV SURF PREP FOR MRK (WORD)
EA 10.000 $37.130 $109.400
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 9.000 $19.990 $63.110
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $8,000.000 $23,496.780
VEH SIG SEC (12")LED(GRN ARW)
EA 3.000 $367.920 $415.030
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $353.950 $415.030
VEH SIG SEC (12")LED(RED ARW)
EA 3.000 $353.140 $415.030
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 14.000 $214.610 $211.430
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 3.000 $237.710 $265.400
PED DETECT PUSH BUTTON (STANDARD)
EA 1.000 $450.000 $596.550
GROUND BOX (ADJUST)
EA 1.000 $550.000 $662.680
ITS RADIO (SNGL)(900 MHZ)-I-O
EA 1.000 $1,800.000 $7,095.640
ITS RADIO (SNGL)(900 MHZ)-I-U
EA 2.000 $2,300.000 $7,095.640
LED ROADSIDE SIGN
EA 6.000 $5,772.850 $4,392.850
INSTALL DRIVER FDBK SPEED SIGN ASSM
EA 4.000 $9,890.750 $6,271.980
REMOVE EXISTING CABLES (POWER)
LF 20.000 $1.980 $6.200
Totals: $1,220,791.570 $1,219,020.080
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $83,000.00
Total: $114,000.00