Show Job Controls
Bid Cobra

EL PASO US 85 (0001-04-099)

Items: 63

County: EL PASO
Length: N/A
Highway: US 85
District: EL PASO
Control Number: 0001-04-099
DBE Goal: 650.0%
Project: BR 2024(837)
Guaranty: N/A
Time: 232 WORKING DAYS
Engineer's Estimate: $5,745,766.00
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JONATHAN CONCHA
ALDO MADRID
MONICA RUIZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,745,766.00
$4,910,196.30
Over/Under Est: -14.54% -$835,569.70
Over/Under Est: 4.35% $250,151.80
Amt Left: 22.11% $1,085,721.50
Over/Under Est: 4.91% $281,867.65
Amt Left: 22.76% $1,117,437.35
Delta: -0.53% -$31,715.85
$9,203,572.38
Over/Under Est: 60.18% $3,457,806.38
Amt Left: 87.44% $4,293,376.08
Delta: -52.69% -$3,175,938.73
Subcontractor Percentage Amount
HARDY HOLE DRILLING 12.64% $669,633.50
BAG REINFORCING LLC 4.89% $259,059.16
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 1.65% $87,412.60
MAJOR MOTION LOGISTICS, LLC 1.13% $59,864.39
PMI PAVEMENT MARKING, LLC 0.37% $19,601.61
PENHALL COMPANY 0.24% $12,714.56
SCOTT DERR PAINTING CO, LLC 0.22% $11,655.01
TRI STATE ELECTRIC, LTD. 0.20% $10,595.47
HERNANDEZ CONCRETE PUMPING, INC 0.00% $0.00
CONCRETE PUMPING, INC. DBA CPI 0.00% $0.00
Total: 21.34% $1,130,536.30

Bid Items & Bid Tabulations

63 Total 0 of 63
EL PASO  |  US 85  |  EL PASO  |  0001-04-099  |  04/04/2024  |  $5,745,766.00  |  BR 2024(837)  |  BRIDGE REPL  |  232 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
INTERNATIONAL EAGLE ENTERPRISES, INC.
HORIZONE CONSTRUCTION I, LTD
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 8.600 $5,000.000 $10,000.000 $1,000.000 $1,241.000 $23,250.000
REMOVING CONC (PAV)
SY 1,297.000 $10.000 $25.000 $80.000 $30.490 $55.000
REMOVING CONC (CURB)
LF 130.000 $10.000 $8.000 $10.000 $38.390 $25.000
REMOVING CONC (MISC)
SY 364.000 $30.000 $85.000 $300.000 $30.490 $100.000
REMOVE CONC (RAIL)
LF 258.000 $85.000 $25.000 $50.000 $18.200 $120.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 34.000 $10.000 $50.000 $200.000 $30.960 $170.000
EXCAVATION (ROADWAY)
CY 4,212.000 $15.000 $20.000 $15.000 $24.030 $31.600
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 1,690.000 $30.000 $20.000 $15.000 $24.100 $43.500
PROOF ROLLING
HR 20.000 $150.000 $85.000 $50.000 $120.720 $140.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,490.000 $16.000 $22.000 $12.000 $15.500 $15.000
CEMENT
TON 17.000 $250.000 $320.000 $500.000 $300.000 $225.000
CEMENT TREAT (NEW BASE) (6")
SY 1,490.000 $4.000 $10.000 $4.000 $23.000 $5.600
PRIME COAT (SS-1H)
GAL 262.000 $6.250 $10.000 $7.000 $41.110 $12.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 1,307.000 $80.000 $128.000 $85.000 $120.450 $215.000
CEM STABIL BKFL
CY 100.000 $120.000 $230.000 $160.000 $291.150 $400.000
TEMPORARY SPL SHORING
SF 6,050.000 $25.000 $4.000 $20.000 $45.000 $80.000
DRILL SHAFT (24 IN)
LF 424.000 $250.000 $250.000 $260.000 $288.610 $238.500
DRILL SHAFT (30 IN)
LF 2,300.000 $400.000 $325.000 $305.000 $330.500 $284.750
CL C CONC (ABUT)(HPC)
CY 24.400 $1,500.000 $1,850.000 $1,700.000 $2,040.640 $4,000.000
CL C CONC (CAP)(HPC)
CY 144.300 $1,500.000 $2,500.000 $2,200.000 $2,482.910 $5,500.000
CL C CONC (COLUMN)(HPC)
CY 30.200 $1,400.000 $3,000.000 $1,800.000 $2,482.910 $12,000.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 22,333.000 $25.000 $19.500 $15.000 $22.750 $27.000
APPROACH SLAB (HPC)
CY 58.100 $800.000 $950.000 $600.000 $985.450 $1,400.000
PRESTR CONC SLAB BEAM (4SB15)
LF 2,385.830 $250.000 $280.000 $280.000 $330.420 $373.000
PRESTR CONC SLAB BEAM (5SB15)
LF 2,385.830 $300.000 $280.000 $280.000 $330.420 $373.000
RIPRAP (CONC)(5 IN)
CY 26.000 $550.000 $750.000 $600.000 $304.540 $1,450.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 1,165.000 $315.000 $250.000 $210.000 $442.000 $176.000
RAIL (TY SSTR)
LF 596.000 $60.000 $60.000 $90.000 $175.500 $200.000
RAIL (TY SSTR)(HPC)
LF 1,231.000 $75.000 $65.000 $90.000 $195.000 $175.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 622.000 $85.000 $60.000 $90.000 $175.500 $210.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 216.000 $215.000 $235.000 $260.000 $341.850 $475.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $350,000.000 $150,000.000 $950,000.000 $311,706.730 $890,000.000
MOBILIZATION
LS 1.000 $495,070.000 $250,000.000 $550,000.000 $62,465.000 $920,200.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $25,000.000 $9,000.000 $15,000.000 $6,754.800 $26,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $25.000 $45.000 $32.530 $36.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $13.000 $12.000 $20.000 $15.430 $12.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,020.000 $4.000 $5.850 $5.000 $9.480 $9.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,020.000 $1.000 $1.250 $1.000 $1.690 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 180.000 $10.000 $5.850 $8.000 $9.510 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 180.000 $5.000 $2.500 $1.000 $2.750 $2.600
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 720.000 $3.000 $9.000 $11.000 $25.770 $40.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 720.000 $3.000 $9.000 $9.000 $25.770 $12.000
PRM CTB(TRAN SGL SLOPE TO CTB) SPL(HPC)
LF 622.000 $200.000 $55.000 $85.000 $130.000 $240.000
CONC CURB (TY II)
LF 336.000 $20.000 $30.000 $15.000 $28.680 $55.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $1,000.000 $1,850.000 $1,000.000 $1,388.240 $1,075.000
REMOVE SM RD SN SUP&AM
EA 2.000 $150.000 $205.000 $150.000 $390.000 $715.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 9.000 $27.000 $40.000 $22.000 $21.030 $1,075.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 18.000 $30.000 $40.000 $22.000 $21.030 $1,075.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 120.000 $6.000 $8.000 $8.000 $10.400 $12.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,330.000 $1.500 $1.930 $8.000 $2.510 $5.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 440.000 $0.500 $0.710 $5.000 $0.923 $0.750
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,700.000 $0.500 $0.410 $4.250 $0.533 $0.500
REFL PAV MRK TY II (Y) 6" (SLD)
LF 1,720.000 $0.500 $0.420 $4.250 $0.546 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 440.000 $1.000 $2.010 $6.000 $2.310 $5.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 1,700.000 $1.000 $1.270 $4.250 $1.650 $4.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,720.000 $1.500 $1.270 $4.250 $1.650 $4.000
REFL PAV MRKR TY II-C-R
EA 22.000 $8.000 $10.750 $10.000 $13.980 $15.000
PAV SURF PREP FOR MRK (6")
LF 5,130.000 $0.500 $0.400 $3.000 $0.520 $0.500
D-GR HMA TY-D SAC-B PG64-22
TON 72.000 $130.000 $250.000 $150.000 $194.000 $326.000
TACK COAT
GAL 79.000 $50.000 $15.000 $25.000 $17.160 $25.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $400.000 $400.000 $2,000.000 $975.000 $650.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $12,000.000 $15,000.000 $18,125.380 $17,500.000
TMA (MOBILE OPERATION)
DAY 8.000 $500.000 $625.000 $600.000 $978.040 $1,000.000
Totals: $5,745,766.000 $4,910,196.300 $5,995,917.800 $6,027,633.683 $9,203,572.380