Show Job Controls
Bid Cobra

EL PASO SH 20 (0001-02-079)

Items: 28

County: EL PASO
Length: N/A
Highway: SH 20
District: EL PASO
Control Number: 0001-02-079
DBE Goal: 0.0%
Project: F 2B24(194)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $3,619,662.22
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JONATHAN CONCHA
ALDO MADRID
MONICA RUIZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,619,662.22
$2,966,194.40
Over/Under Est: -18.05% -$653,467.82
Over/Under Est: -12.17% -$440,375.76
Amt Left: 7.18% $213,092.06
Subcontractor Percentage Amount
J-KEN PIPE & STEEL, L.L.C. 1.85% $54,874.60
BORDER DRILLING LLC 0.74% $21,949.84
APACHE BARRICADE & SIGN 0.00% $0.00
Total: 2.59% $76,824.44

Bid Items & Bid Tabulations

28 Total 0 of 28
EL PASO  |  SH 20  |  EL PASO  |  0001-02-079  |  06/06/2024  |  $3,619,662.22  |  F 2B24(194)  |  HAZARD ELIM & SAFETY  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRI STATE ELECTRIC, LTD.
MARTINEZ BROS. CONTRACTORS, LLC
EXCAVATION (SPECIAL)
CY 5.550 $5,000.000 $1,200.000 $409.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 1,244.000 $425.000 $335.000 $409.500
MOBILIZATION
LS 1.000 $50,000.000 $85,000.000 $95,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $11,000.000 $9,800.000 $10,132.200
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 150.000 $8.290 $12.000 $9.360
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.000 $50.000 $3.510
CONC SIDEWALKS (4")
SY 19.000 $78.000 $85.000 $93.600
REMOVE RD IL ASM (TRANS-BASE)
EA 51.000 $1,000.000 $750.000 $862.500
REPLACE LUMINAIRE W/LED (250W EQ)
EA 5.000 $750.000 $595.000 $805.000
REPLACE LUMINAIRE W/LED (400W EQ)
EA 13.000 $776.250 $635.000 $833.750
IN RD IL (TY SA) 30T-4-4 (250W EQ) LED
EA 62.000 $5,662.440 $5,926.000 $6,325.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 14.000 $5,359.500 $6,100.000 $6,123.750
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 56.000 $7,381.430 $6,200.000 $6,164.000
CONDT (PVC) (SCH 40) (2")
LF 21,324.000 $25.000 $18.500 $16.380
CONDT (PVC) (SCH 40) (2") (BORE)
LF 12,988.000 $40.000 $28.000 $28.175
CONDT (RM) (2")
LF 25.000 $51.640 $85.000 $25.300
ELEC CONDR (NO.8) INSULATED
LF 110,976.000 $2.820 $2.650 $2.875
ELEC CONDR (NO.4) INSULATED
LF 150.000 $3.380 $3.800 $5.463
GROUND BOX TY A (122311)W/APRON
EA 58.000 $1,525.000 $1,100.000 $1,150.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 8.000 $10,020.000 $9,500.000 $10,407.500
IRRIG SYS OPERATION AND REPAIR
MO 4.000 $1,092.500 $1,000.000 $1,901.250
PLANT BED MAINTENANCE
CYC 10.000 $1,207.500 $1,000.000 $1,345.500
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 67.000 $154.620 $149.000 $183.187
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $190.000 $75.000 $117.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 1.000 $3,131.250 $1,250.000 $7,475.000
REMOVE EXISTING CABLES (POWER)
LF 68,100.000 $2.000 $0.350 $1.438
TMA (STATIONARY)
DAY 140.000 $219.750 $285.000 $351.000
LED DECORATIVE ILLUM ASSEMB 8' ARM-100W
EA 20.000 $10,000.000 $8,449.000 $7,992.500
Totals: $3,619,662.220 $2,966,194.400 $3,179,286.474