EL PASO SH 20 (0001-02-055)

Items: 74

County: EL PASO
Length: N/A
Highway: SH 20
District: EL PASO
Control Number: 0001-02-055
DBE Goal: N/A
Project: NH 2019(781)
Guaranty: N/A
Time: 240 WORKING DAYS
Engineer's Estimate: $12,898,154.87
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$12,898,154.87
$11,457,248.30
Over/Under Est: -11.17% -$1,440,906.57
Over/Under Est: -7.13% -$919,051.08
Amt Left: 4.55% $521,855.49
$13,653,069.55
Over/Under Est: 5.85% $754,914.68
Amt Left: 19.17% $2,195,821.25
Delta: -13.97% -$1,673,965.76
Over/Under Est: 11.94% $1,539,442.03
Amt Left: 26.01% $2,980,348.60
Delta: -5.75% -$784,527.35

Bid Items & Bid Tabulations

74 Total 0 of 74
EL PASO  |  SH 20  |  EL PASO  |  0001-02-055  |  11/06/2019  |  $12,898,154.87  |  NH 2019(781)  |  REHAB OF EXIST ROAD  |  240 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. A. R. CONCRETE, INC.
LESNA CONSTRUCTION, INC.
J.D. ABRAMS, L.P.
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW
STA 180.000 $1,000.000 $250.000 $350.000 $5,500.000 $1,000.000
REMOVING CONC (MEDIANS)
SY 319.000 $10.000 $16.000 $25.000 $162.000 $12.000
REMOVING CONC (SIDEWALKS)
SY 324.000 $12.000 $16.000 $25.000 $92.000 $11.000
REMOVING CONC (DRIVEWAYS)
SY 776.000 $12.000 $13.000 $25.000 $26.000 $10.000
REMOVING CONC (CURB)
LF 64,808.000 $4.900 $1.300 $3.000 $2.500 $2.250
REMOVING CONC (CURB AND GUTTER)
LF 60.000 $7.000 $13.000 $4.000 $8.500 $10.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 2,300.000 $4.000 $2.000 $2.000 $0.700 $1.250
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,839.000 $4.000 $3.000 $3.000 $2.300 $3.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 350.000 $12.000 $12.000 $5.000 $7.400 $5.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 206,784.000 $1.500 $3.000 $3.000 $4.000 $4.500
EMBANKMENT (ORIGINAL)(DENS CONT)(TY B)
CY 900.000 $13.000 $20.000 $40.000 $1.000 $25.000
VEGETATION BARRIER
SY 408.000 $1.150 $3.000 $4.000 $7.000 $3.000
PROOF ROLLING
HR 40.000 $108.000 $80.000 $80.000 $68.000 $80.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 63,565.000 $3.000 $6.000 $4.000 $11.100 $3.650
SUPERPAVE MIXTURES SP-B PG64-22
TON 90,553.000 $73.500 $61.750 $63.000 $63.500 $78.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 23,749.000 $68.000 $73.000 $66.000 $66.000 $85.000
TACK COAT
GAL 62,313.000 $2.550 $4.000 $4.000 $4.500 $3.250
PLANE ASPH CONC PAV (3")
SY 206,784.000 $2.000 $1.000 $1.600 $0.640 $1.100
STRUCT EXCAV (BOX)
CY 900.000 $20.000 $18.000 $18.000 $2.500 $13.000
TRENCH EXCAVATION PROTECTION
LF 500.000 $3.000 $6.000 $7.000 $12.600 $3.000
CONC BOX CULV (5 FT X 3 FT)
LF 450.000 $235.000 $285.000 $375.000 $360.000 $400.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $7,500.000 $14,000.000 $14,000.000 $16,000.000 $14,000.000
INLET (COMPL)(TY 1)(SPL)
EA 3.000 $6,500.000 $6,800.000 $30,000.000 $14,000.000 $8,600.000
INLET(COMPL)(CURB)(SPL)
EA 2.000 $7,000.000 $6,800.000 $35,000.000 $65,000.000 $9,300.000
ADJUSTING MANHOLES
EA 2.000 $1,000.000 $350.000 $800.000 $600.000 $700.000
ADJUSTING INLETS
EA 6.000 $1,853.710 $350.000 $900.000 $2,500.000 $1,800.000
ADJUSTING MANHOLES (SANITARY)
EA 41.000 $1,536.540 $250.000 $450.000 $700.000 $1,200.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 43.000 $550.000 $260.000 $450.000 $590.000 $600.000
MOBILIZATION
LS 1.000 $361,560.870 $577,000.000 $750,000.000 $750,000.000 $1,080,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $10,000.000 $15,000.000 $15,000.000 $26,700.000 $19,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 890.000 $22.000 $15.000 $15.000 $1.000 $19.000
CONSTRUCTION EXITS (REMOVE)
SY 1,805.000 $7.000 $5.000 $3.000 $1.000 $7.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 130.000 $8.000 $8.000 $5.000 $5.700 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 130.000 $1.500 $6.500 $0.500 $3.200 $1.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 10,460.000 $7.500 $7.500 $5.000 $5.000 $8.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 240.000 $15.000 $23.000 $5.000 $15.000 $8.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 80,520.000 $5.000 $2.500 $2.500 $1.200 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 640.000 $7.000 $3.500 $2.500 $3.000 $7.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 10,460.000 $5.000 $6.000 $4.000 $5.000 $8.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 240.000 $5.500 $3.500 $4.000 $15.000 $8.000
CONC CURB (MONO) (TY II)
LF 68,176.000 $6.000 $5.000 $5.500 $7.250 $6.250
DRIVEWAYS (CONC) (HES)
SY 776.000 $65.000 $61.000 $62.000 $110.000 $58.000
CONC SIDEWALKS (4")
SY 325.000 $41.250 $44.000 $52.000 $43.000 $48.000
CURB RAMPS (TY 1)
EA 1.000 $1,180.000 $900.000 $1,100.000 $970.000 $1,200.000
CURB RAMPS (TY 7)
EA 12.000 $1,400.000 $1,200.000 $1,150.000 $970.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 2,201.000 $15.000 $71.000 $5.500 $17.000 $12.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 1,836.000 $14.000 $71.000 $5.500 $17.000 $12.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 24,909.000 $1.400 $1.000 $1.060 $1.000 $1.150
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 4,822.000 $2.250 $3.500 $3.200 $3.100 $2.000
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 150.000 $4.500 $5.000 $5.000 $4.700 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,543.000 $5.000 $7.000 $6.200 $6.200 $4.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 67.000 $80.000 $100.000 $100.000 $92.000 $80.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 45.000 $80.000 $90.000 $100.000 $92.000 $80.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 33.000 $30.000 $44.000 $45.000 $46.000 $40.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 10,636.000 $0.150 $0.250 $0.300 $0.230 $0.350
REFL PAV MRK TY II (W) 6" (BRK)
LF 19,000.000 $0.200 $0.350 $0.400 $0.340 $0.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 24,909.000 $0.500 $0.450 $0.500 $0.450 $0.650
REFL PAV MRK TY II (W) 12" (SLD)
LF 4,822.000 $1.250 $2.000 $2.200 $2.100 $1.500
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,513.000 $3.500 $4.000 $4.200 $4.200 $2.750
REFL PAV MRK TY II (W) (ARROW)
EA 65.000 $55.000 $60.000 $65.000 $63.000 $50.000
REFL PAV MRK TY II (W) (WORD)
EA 37.000 $50.000 $60.000 $65.000 $63.000 $50.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 24,212.000 $0.150 $0.200 $0.300 $0.230 $0.350
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 110.000 $3.000 $0.500 $0.550 $0.500 $1.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 19,000.000 $0.900 $0.700 $0.800 $0.750 $1.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 450.000 $3.000 $1.000 $1.100 $1.050 $1.000
REFL PAV MRKR TY II-C-R
EA 2,483.000 $3.500 $3.400 $3.400 $3.500 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 8,185.000 $0.600 $0.900 $0.950 $0.940 $0.650
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 28.000 $65.000 $72.000 $75.000 $250.000 $115.000
LEAN CONCRETE BASE (FN POS)
CY 5,030.000 $175.000 $33.000 $105.000 $100.000 $60.000
TMA (STATIONARY)
DAY 350.000 $200.000 $180.000 $80.000 $70.000 $200.000
WATER MAIN (PVC)(C-900)(12")
LF 205.000 $40.000 $94.000 $120.000 $87.000 $70.000
REMOVE EXIST WATER PIPE (12")
LF 200.000 $35.000 $54.000 $20.000 $13.300 $18.000
ADDITIONAL FITTINGS
LB 2,000.000 $5.000 $1.000 $4.000 $1.100 $2.000
CASING (STEEL) (24 IN) (OPEN TRENCH)
LF 30.000 $60.000 $170.000 $250.000 $440.000 $250.000
Totals: $12,898,154.870 $11,457,248.300 $11,979,103.790 $13,653,069.550 $14,437,596.900