Show Job Controls
Bid Cobra

ECTOR IH0020 (6398-28-001)

Items: 25

County: ECTOR
Length: N/A
Highway: IH0020
District: ODESSA
Control Number: 6398-28-001
DBE Goal: N/A
Project: RMC - 639828001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $505,600.00
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SERGIO MIRANDA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$505,600.00
$506,040.00
Over/Under Est: 0.09% $440.00
Over/Under Est: 18.01% $91,050.00
Amt Left: 17.91% $90,610.00
$619,455.00
Over/Under Est: 22.52% $113,855.00
Amt Left: 22.41% $113,415.00
Delta: -3.82% -$22,805.00
Over/Under Est: 33.32% $168,465.00
Amt Left: 33.2% $168,025.00
Delta: -8.82% -$54,610.00
$698,500.00
Over/Under Est: 38.15% $192,900.00
Amt Left: 38.03% $192,460.00
Delta: -3.63% -$24,435.00

Bid Items & Bid Tabulations

25 Total 0 of 25
ECTOR  |  IH0020  |  ODESSA  |  6398-28-001  |  04/07/2022  |  $505,600.00  |  RMC - 639828001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AJ COMMERCIAL SERVICES, INC.
T&L CLEANING SERVICES LLC
HJC FARMS, INC.
DIGG COMMERCIAL, LLC
MIJELUM, L.L.C.
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 20.000 $50.000 $1.000 $200.000 $30.000 $150.000 $100.000
MOBILIZATION (CALLOUT)
EA 20.000 $350.000 $500.000 $100.000 $250.000 $1.000 $1,800.000
MOBILIZATION (EMERGENCY)
EA 45.000 $750.000 $800.000 $100.000 $400.000 $1.000 $2,200.000
TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $10.000 $100.000 $1.000 $500.000 $500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,500.000 $100.000 $1,200.000 $800.000 $1,600.000 $1,600.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 15.000 $400.000 $200.000 $200.000 $200.000 $500.000 $2,000.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $10.000 $400.000 $300.000 $200.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $100.000 $200.000 $100.000 $100.000 $200.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $25.000 $35.000 $50.000 $20.000 $25.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $25.000 $35.000 $50.000 $20.000 $25.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $30.000 $28.000 $30.000 $31.000 $20.000 $30.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $35.000 $32.000 $20.000 $25.000 $65.000 $150.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $50.000 $33.000 $20.000 $25.000 $55.000 $500.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $50.000 $40.000 $25.000 $45.000 $50.000 $80.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 300.000 $55.000 $60.000 $50.000 $88.000 $200.000 $70.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 10.000 $60.000 $200.000 $50.000 $95.000 $400.000 $250.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $150.000 $1.000 $200.000 $250.000 $300.000 $650.000
REALIGN POSTS
EA 150.000 $25.000 $50.000 $10.000 $15.000 $100.000 $70.000
REMOVE & REPLACE BLOCKOUT
EA 300.000 $30.000 $20.000 $20.000 $10.000 $15.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,800.000 $3,800.000 $7,000.000 $5,000.000 $2,345.000 $2,500.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 200.000 $70.000 $50.000 $50.000 $20.000 $200.000 $100.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 15.000 $200.000 $10.000 $10.000 $50.000 $250.000 $1,500.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 500.000 $5.000 $1.000 $5.000 $2.000 $5.000 $10.000
POST AND CABLE FENCE (REPAIR)
LF 4,500.000 $7.500 $9.000 $5.000 $20.000 $5.000 $10.000
TMA (STATIONARY)
DAY 75.000 $300.000 $700.000 $200.000 $800.000 $3,500.000 $500.000
Totals: $505,600.000 $506,040.000 $596,650.000 $619,455.000 $674,065.000 $698,500.000