ECTOR IH0020 (6346-90-001)

Items: 23

County: ECTOR
Length: N/A
Highway: IH0020
District: ODESSA
Control Number: 6346-90-001
DBE Goal: N/A
Project: RMC - 634690001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $516,850.00
Date: 10/03/2019 (6 years ago)
Contract Number: N/A
Type: ROADWAY ILLUMINATION MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$516,850.00
Over/Under Est: 13.92% $71,970.83
Over/Under Est: 20.17% $104,255.00
Amt Left: 5.48% $32,284.17
Over/Under Est: 23.59% $121,900.00
Amt Left: 8.48% $49,929.17
Delta: -2.84% -$17,645.00
Over/Under Est: 97.55% $504,200.00
Amt Left: 73.41% $432,229.17
Delta: -59.85% -$382,300.00

Bid Items & Bid Tabulations

23 Total 0 of 23
ECTOR  |  IH0020  |  ODESSA  |  6346-90-001  |  10/03/2019  |  $516,850.00  |  RMC - 634690001  |  ROADWAY ILLUM MAINT  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AMERICAN LIGHTING AND SIGNALIZATION, LLC
WILLIS ELECTRIC CO., LP
CHAMPION INFRASTRUCTURE, LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $250.000 $426.990 $265.000 $375.000 $300.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $325.000 $316.820 $325.000 $375.000 $400.000
MOBILIZATION (CALLOUT)
EA 12.000 $750.000 $6,929.270 $2,500.000 $500.000 $10,000.000
INSTALL ABOVE-GROUND CONDUIT
LF 150.000 $20.000 $12.810 $20.000 $20.000 $30.000
INSTALL UNDERGROUND CONDUIT
LF 1,500.000 $20.000 $13.830 $6.250 $20.000 $20.000
INSTALL CONDUCTOR
LF 25,000.000 $3.000 $2.040 $1.500 $3.250 $4.000
ROAD BORE
LF 1,000.000 $50.000 $22.090 $30.000 $35.000 $30.000
REPLACE LUMINAIRE FIXTURE (LED)
EA 500.000 $150.000 $211.250 $525.000 $300.000 $650.000
REPLACE LUMINAIRE POLE
EA 50.000 $1,000.000 $1,281.600 $750.000 $1,500.000 $1,500.000
REPLACE LUMINAIRE ARMS
EA 25.000 $500.000 $105.420 $500.000 $200.000 $600.000
REPLACE ELECTRICAL SERVICE
EA 10.000 $5,000.000 $5,731.460 $5,500.000 $8,500.000 $8,000.000
INSTALL GROUND BOX W/APRON
EA 25.000 $1,000.000 $1,189.290 $850.000 $900.000 $1,500.000
REMOVE GROUND BOX
EA 25.000 $250.000 $200.260 $150.000 $100.000 $500.000
REMOVE FOUNDATION
EA 10.000 $250.000 $702.870 $500.000 $350.000 $1,000.000
REPLACE TRANSFORMER BASE
EA 50.000 $750.000 $479.550 $450.000 $125.000 $1,200.000
REPLACE TRANSFORMER BASE COVER
EA 50.000 $25.000 $13.650 $25.000 $20.000 $100.000
REPLACE HAND HOLE COVER
EA 50.000 $25.000 $13.970 $25.000 $20.000 $50.000
REPLACE FUSE
EA 50.000 $25.000 $51.000 $20.000 $20.000 $50.000
REPLACE BREAKAWAY FUSE HOLDER
EA 50.000 $125.000 $109.380 $150.000 $235.000 $250.000
REPLACE PHOTOCELL AND BRACKET
EA 50.000 $150.000 $20.480 $50.000 $50.000 $150.000
RE-STRAP EXISTING CONDUIT
EA 10.000 $25.000 $38.940 $15.000 $25.000 $100.000
TROUBLESHOOT FOR REPAIRS
HR 150.000 $175.000 $197.250 $100.000 $135.000 $165.000
TMA (STATIONARY)
DAY 150.000 $200.000 $343.850 $300.000 $490.000 $300.000
Totals: $516,850.000 $588,820.830 $621,105.000 $638,750.000 $1,021,050.000