Show Job Controls
Bid Cobra

ECTOR IH0020 (6329-40-001)

Items: 27

County: ECTOR
Length: N/A
Highway: IH0020
District: ODESSA
Control Number: 6329-40-001
DBE Goal: N/A
Project: RMC - 632940001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $373,925.00
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: CALLOUT MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$373,925.00
$278,665.00
Over/Under Est: -25.48% -$95,260.00
$336,320.00
Over/Under Est: -10.06% -$37,605.00
Amt Left: 20.69% $57,655.00
Over/Under Est: 1.91% $7,125.00
Amt Left: 36.74% $102,385.00
Delta: -13.30% -$44,730.00

Bid Items & Bid Tabulations

27 Total 0 of 27
ECTOR  |  IH0020  |  ODESSA  |  6329-40-001  |  04/04/2018  |  $373,925.00  |  RMC - 632940001  |  CALLOUT MBGF  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
HJC FARMS, INC.
K-BAR SERVICES, INC.
MOBILIZATION (CALLOUT)
EA 20.000 $500.000 $100.000 $250.000 $500.000
MOBILIZATION (EMERGENCY)
EA 30.000 $500.000 $300.000 $500.000 $300.000
TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $1.000 $1.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $300.000 $1,200.000 $500.000 $1,000.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $100.000 $100.000 $1.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 40.000 $50.000 $100.000 $50.000 $250.000
GDRAIL END TRT(INST)(WOOD POST)(TY II)
EA 20.000 $4,000.000 $3,500.000 $3,500.000 $3,500.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 20.000 $4,000.000 $2,900.000 $4,500.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 30.000 $5.000 $30.000 $5.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 30.000 $5.000 $30.000 $5.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $25.000 $18.000 $21.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $25.000 $30.000 $1.000 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 75.000 $25.000 $30.000 $1.000 $10.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $25.000 $20.000 $1.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 300.000 $50.000 $40.000 $50.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $35.000 $50.000 $40.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $120.000 $150.000 $1.000 $250.000
REALIGN POSTS
EA 100.000 $15.000 $10.000 $5.000 $30.000
REMOVE & REPLACE BLOCKOUT
EA 500.000 $15.000 $10.000 $15.000 $20.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $35.000 $1.000 $1.000 $10.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $40.000 $50.000 $35.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 15.000 $20.000 $10.000 $35.000 $100.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,500.000 $5.000 $2.000 $4.000 $5.000
POST AND CABLE FENCE (REPAIR)
LF 500.000 $7.500 $1.000 $1.000 $10.000
REPAIR (GREAT SYS) (BAY)
EA 1.000 $2,000.000 $1,200.000 $1,000.000 $2,500.000
REPAIR (QUAD) (N) (NOSE)
EA 1.000 $2,500.000 $1,000.000 $200.000 $2,500.000
TMA (STATIONARY)
DAY 50.000 $300.000 $100.000 $400.000 $300.000
Totals: $373,925.000 $278,665.000 $336,320.000 $381,050.000