ECTOR SL 338 (2224-01-119)

Items: 64

County: ECTOR
Length: N/A
Highway: SL 338
District: ODESSA
Control Number: 2224-01-119
DBE Goal: 0.0%
Project: C 2224-1-119
Guaranty: N/A
Time: 155 WORKING DAYS
Engineer's Estimate: $8,664,879.39
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
PRELETTINGQUESTIONS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,664,879.39
Over/Under Est: -8.25% -$714,929.70
$8,429,801.95
Over/Under Est: -2.71% -$235,077.44
Amt Left: 6.04% $479,852.26
Subcontractor Percentage Amount
TEX OP CONSTRUCTION, LP 2.33% $185,233.83
DOUBLE A CONTRACTING, L.P. 1.94% $154,229.02
DESERT PAVING, INC. 1.60% $127,199.20
CONTRACTORS SERVICE, LTD. 0.97% $77,114.51
DK CONTRACTING, LLC 0.69% $54,854.65
AIMS COMPANIES 0.12% $9,539.94
R.E.B.D. TRUCKING LLC 0.00% $0.00
Total: 7.65% $608,171.15

Bid Items & Bid Tabulations

64 Total 0 of 64
ECTOR  |  SL 338  |  ODESSA  |  2224-01-119  |  12/05/2023  |  $8,664,879.39  |  C 2224-1-119  |  HWY IMPRV  |  155 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNF CONSTRUCTION, INC.
REMOVING CONC (DRIVEWAYS)
SY 84.000 $150.000 $140.000 $55.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 55,069.000 $8.900 $8.720 $9.000
REMOVING STAB BASE & ASPH PAV(14")
SY 3,928.000 $9.330 $16.510 $25.000
EXCAVATION (ROADWAY)
CY 1,000.000 $35.000 $35.000 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 70.000 $1,500.000 $900.000 $1,135.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,000.000 $35.000 $35.000 $12.000
BACKFILL (TY B)
STA 202.000 $400.000 $175.000 $160.000
BLADING
HR 20.000 $275.000 $439.400 $275.000
PROOF ROLLING
HR 20.000 $100.000 $175.000 $115.000
FL BS (CMP IN PLC)(TY A GR 4)(7")
SY 3,980.000 $23.000 $31.750 $20.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 79,862.000 $1.250 $1.000 $1.750
PRIME COAT (AE-P)
GAL 25,474.000 $5.100 $5.080 $5.500
FOG SEAL (CSS-1H)
GAL 2,100.000 $7.000 $5.070 $5.000
ASPH (AC-20-5TR)
GAL 20,927.000 $6.000 $4.870 $5.000
AGGR(TY-PB GR-4 SAC-A)
CY 501.000 $260.000 $196.000 $230.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 200.000 $120.000 $150.000 $135.000
PLANE CONC PAV(0" TO 1-1/2")
SY 340.000 $40.000 $45.980 $7.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 8.000 $12,100.000 $13,512.500 $11,000.000
CLEAN EXIST CULVERTS
EA 15.000 $3,900.000 $2,012.500 $1,800.000
MOBILIZATION
LS 1.000 $778,691.300 $400,000.000 $842,900.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,500.000 $35,000.000 $51,250.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,873.000 $11.100 $13.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,873.000 $3.500 $5.000 $2.000
RUMBLE STRIPS (SHOULDER)
LF 7,948.000 $0.200 $0.240 $0.250
RUMBLE STRIPS (CENTERLINE)
LF 28,138.000 $0.200 $0.320 $0.300
ALUMINUM SIGNS (TY A)
SF 27.000 $55.000 $36.800 $35.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 37.000 $950.000 $874.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $1,400.000 $979.800 $960.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,200.000 $1,269.600 $1,175.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $830.000 $1,059.150 $1,055.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,300.000 $1,401.850 $1,290.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,150.000 $1,338.600 $1,290.000
REMOVE SM RD SN SUP&AM
EA 53.000 $125.000 $150.000 $120.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 40.000 $25.000 $100.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
EA 40.000 $100.000 $79.350 $105.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 3,277.000 $1.000 $0.750 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 88,100.000 $0.350 $0.290 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,469.000 $0.550 $0.290 $0.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 81,368.000 $0.450 $0.290 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,121.000 $2.300 $2.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 912.000 $4.250 $2.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,300.000 $2.700 $2.000 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 276.000 $1.000 $3.450 $3.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,051.000 $1.100 $1.140 $1.250
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,639.000 $0.900 $1.090 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 44,050.000 $0.950 $0.860 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,234.000 $0.850 $1.090 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 40,684.000 $0.900 $0.860 $1.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 276.000 $22.000 $16.100 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $360.000 $287.500 $300.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 3.000 $550.000 $747.500 $650.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $350.000 $368.000 $400.000
REFL PAV MRKR TY I-C
EA 360.000 $4.500 $4.030 $5.000
REFL PAV MRKR TY II-A-A
EA 1,200.000 $4.200 $3.450 $5.500
REFL PAV MRKR TY II-C-R
EA 100.000 $3.500 $5.750 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 90,600.000 $1.100 $1.200 $0.500
SP MIXES SP-B SAC-B PG70-22
TON 23,116.000 $135.000 $135.000 $140.000
TACK COAT
GAL 3,980.000 $6.000 $4.440 $6.250
STONE-MTRX-ASPH SMAR-F SAC-A
TON 10,508.000 $230.000 $186.250 $175.000
BONDING COURSE
GAL 12,737.000 $5.400 $4.930 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $21,600.000 $4,825.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $13,500.000 $18,000.000 $3,620.000
TMA (STATIONARY)
DAY 191.000 $225.000 $102.000 $330.000
TMA (MOBILE OPERATION)
DAY 48.000 $430.000 $1,020.000 $680.000
Totals: $8,664,879.390 $7,949,949.690 $8,429,801.950