Show Job Controls
Bid Cobra

ECTOR SL 338 (2224-01-118)

Items: 56

County: ECTOR
Length: N/A
Highway: SL 338
District: ODESSA
Control Number: 2224-01-118
DBE Goal: N/A
Project: F 2022(586)
Guaranty: N/A
Time: 255 WORKING DAYS
Engineer's Estimate: $17,010,312.97
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$17,010,312.97
1
$18,181,464.70
Over/Under Est: 6.88% $1,171,151.73
$21,994,180.60
Over/Under Est: 29.3% $4,983,867.63
Amt Left: 20.97% $3,812,715.90
Over/Under Est: 46.05% $7,833,439.20
Amt Left: 36.64% $6,662,287.47
Delta: -12.96% -$2,849,571.57
Subcontractor Percentage Amount
DK CONTRACTING, LLC 1.31% $238,177.19
HJC FARMS, INC. 1.30% $236,359.04
DOUBLE A CONTRACTING, L.P. 1.18% $214,541.28
W. S. CONSTRUCTION COMPANY 1.11% $201,814.26
CONTRACTORS SERVICE, LTD. 0.50% $90,907.32
WILLIS ELECTRIC CO., LP 0.31% $56,362.54
A BROTHERS MILLING, LLC 0.28% $50,908.10
MICA CORPORATION 0.25% $45,453.66
TEXOP CONSTRUCTION 0.16% $29,090.34
HERNANDEZ OILFIELD TRANSPORTATION LLC 0.09% $16,363.32
R.E.B.D. TRUCKING LLC 0.01% $1,818.15
Total: 6.50% $1,181,795.20

Bid Items & Bid Tabulations

56 Total 0 of 56
ECTOR  |  SL 338  |  ODESSA  |  2224-01-118  |  12/01/2022  |  $17,010,312.97  |  F 2022(586)  |  HWY IMPRV  |  255 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
FNF CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 3,494.000 $14.000 $7.800 $8.000 $14.120
EXCAVATION (ROADWAY)
CY 515.000 $39.850 $71.800 $40.000 $100.220
SUBGRADE WIDENING (ORD COMP)
STA 44.000 $1,400.000 $898.970 $1,400.000 $1,914.900
BACKFILL (TY A)
STA 733.000 $567.380 $230.750 $270.000 $415.390
BLADING
HR 20.000 $330.000 $176.970 $400.000 $425.470
PROOF ROLLING
HR 20.000 $165.000 $154.560 $200.000 $170.170
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 3,494.000 $23.000 $33.050 $40.000 $30.320
PRIME COAT (AE-P)
GAL 73,820.000 $4.890 $5.730 $5.000 $5.060
FOG SEAL (CSS-1H)
GAL 1,926.000 $7.000 $6.870 $15.000 $6.780
ASPH (AC-20-5TR)
GAL 75,095.000 $5.200 $4.890 $10.000 $4.900
AGGR(TY-PB GR-4 SAC-A)
CY 1,797.000 $158.000 $255.250 $310.000 $164.160
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 10,949.000 $77.000 $71.310 $115.500 $99.160
PLANE CONC PAV(0" TO 1-1/2")
SY 1,732.000 $12.330 $31.620 $10.000 $16.080
CL A CONC (MISC)
CY 10.000 $1,200.000 $2,750.000 $4,500.000 $3,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 4.000 $1,800.000 $4,400.000 $6,500.000 $4,800.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 8.000 $1,200.000 $4,675.000 $7,000.000 $5,100.000
CLEAN EXIST CULVERTS
EA 31.000 $3,200.000 $3,850.000 $6,000.000 $4,200.000
MOBILIZATION
LS 1.000 $1,546,392.000 $1,401,638.180 $2,198,000.000 $2,550,750.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $20,000.000 $70,000.000 $50,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,820.000 $13.000 $7.350 $12.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,820.000 $3.000 $2.300 $5.000 $5.000
RUMBLE STRIPS (SHOULDER)
LF 119,706.000 $0.180 $0.180 $0.250 $0.190
CABLE BARRIER SYSTEM (TL-4)
LF 8,965.000 $28.000 $22.610 $35.000 $29.400
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 4.000 $6,250.000 $8,024.500 $11,100.000 $4.800
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 405.000 $40.000 $45.100 $65.000 $49.200
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 108.000 $1,086.000 $942.700 $1,300.000 $1,028.400
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 86.000 $1,086.000 $1,027.400 $1,425.000 $1,120.800
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 17.000 $1,333.500 $1,360.700 $1,900.000 $1,484.400
REMOVE SM RD SN SUP&AM
EA 211.000 $200.000 $182.730 $210.000 $230.720
REMOVE DELIN & OBJECT MARKER ASSMS
EA 87.000 $35.000 $100.820 $40.000 $53.040
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 79.000 $170.000 $86.900 $120.000 $94.800
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
EA 15.000 $95.000 $86.900 $120.000 $94.800
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,458.000 $0.200 $0.180 $0.250 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 69,354.000 $0.170 $0.180 $0.250 $0.190
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 74,608.000 $0.880 $1.000 $0.700 $2.880
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 31,097.000 $0.770 $1.000 $1.000 $2.880
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 23,868.000 $1.560 $1.320 $2.000 $1.440
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 64.000 $60.000 $27.500 $40.000 $30.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 18,312.000 $0.930 $0.530 $1.000 $0.580
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 70,498.000 $0.770 $0.530 $1.000 $0.580
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 69,394.000 $0.740 $0.530 $1.000 $0.580
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 575.000 $17.000 $15.400 $25.000 $16.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 93.000 $280.420 $275.000 $380.000 $300.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 20.000 $735.000 $572.000 $790.000 $624.000
PREFAB PAV MRK TY C (W) (WORD)
EA 54.000 $360.000 $308.000 $430.000 $336.000
SP MIXES SP-B SAC-B PG70-22
TON 769.000 $230.000 $194.140 $255.000 $203.530
STONE-MTRX-ASPH SMAR-F SAC-A
TON 30,753.000 $183.490 $195.500 $243.000 $181.290
BONDING COURSE
GAL 47,995.000 $4.500 $4.670 $8.000 $4.620
CEMENT
TON 1,772.000 $233.170 $386.880 $280.000 $900.000
ASPHALT BINDER (PG 64-22)
TON 5,007.000 $775.000 $826.860 $700.000 $1,380.000
FOAMED ASPHALT TREAT (10")(DC)
SY 197,616.000 $5.200 $7.440 $8.000 $13.240
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $25,000.000 $9,610.260 $11,000.000 $26,250.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $15,000.000 $18,534.070 $11,000.000 $15,000.000
TMA (STATIONARY)
DAY 240.000 $300.000 $397.910 $235.000 $225.000
TMA (MOBILE OPERATION)
DAY 140.000 $95.000 $562.350 $750.000 $1,275.000
REMOVE & REPLACE DELINEATOR/OBJ. MARKER
EA 23.000 $28.000 $141.330 $600.000 $240.000
Totals: $17,010,312.970 $18,181,464.700 $21,994,180.600 $24,843,752.170