Bid Cobra

ECTOR VARIOUS (0906-00-277)

Items: 34

County: ECTOR
Length: 0.0000 MILES
Highway: VARIOUS
District: ODESSA
Control Number: 0906-00-277
DBE Goal: 0.0%
Project: C 906-00-277
Guaranty: $34,000.00
Time: 59 WORKING DAYS
Engineer's Estimate: $1,515,778.35
Date: 06/04/2025 (1 year ago)
Contract Number: 6253024
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00197972
Project Description: ADA REMEDIATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$1,515,778.35
$1,271,684.30
Over/Under Est: -16.1% -$244,094.05
Over/Under Est: -15% -$227,328.35
Amt Left: 1.32% $16,765.70
$1,375,026.50
Over/Under Est: -9.29% -$140,751.85
Amt Left: 8.13% $103,342.20
Delta: -6.72% -$86,576.50
$1,495,468.96
Over/Under Est: -1.34% -$20,309.39
Amt Left: 17.6% $223,784.66
Delta: -8.76% -$120,442.46
Over/Under Est: 28.5% $432,028.65
Amt Left: 53.17% $676,122.70
Delta: -30.25% -$452,338.04
Over/Under Est: 31.58% $478,744.65
Amt Left: 56.84% $722,838.70
Delta: -2.40% -$46,716.00
Subcontractor Percentage Amount
DOUBLE A CONTRACTING, L.P. 3.41% $52,795.64
FC TRAFFIC CONTROL, INC. 0.34% $5,264.08
Total: 3.75% $58,059.72

Bid Items & Bid Tabulations

34 Total 0 of 34
ECTOR  |  VARIOUS  |  ODESSA  |  0906-00-277  |  06/04/2025  |  $1,515,778.35  |  C 906-00-277  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  59 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PATHFIELD INVESTMENTS LLC
DELGADO'S CONTRACTORS, LLC
STX CIVIL
TI-ZACK CONCRETE, LLC
O. TREVINO CONSTRUCTION, LLC
GREY SKY CONSTRUCTION LLC
REMOV CONC (MEDIANS)
SY 15.000 $35.000 $25.000 $25.000 $25.000 $60.800 $250.000 $100.000
REMOV CONC (DRIVEWAYS)
SY 2,201.000 $30.000 $20.000 $29.000 $30.000 $29.000 $35.000 $100.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 36.000 $35.000 $25.000 $50.000 $30.000 $25.330 $115.000 $100.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 703.000 $26.120 $12.000 $15.000 $15.000 $12.970 $38.000 $100.000
REMOV CONC (FLUME)
SY 16.000 $61.890 $45.000 $40.000 $30.000 $57.000 $220.000 $100.000
FURN & PLACE TOPSOIL (4")
SY 1,859.000 $11.000 $1.200 $6.000 $7.000 $4.910 $13.500 $10.000
BLOCK SODDING
SY 1,859.000 $10.500 $4.500 $8.000 $10.000 $5.500 $40.500 $10.000
VEGETATIVE WATERING
TGL 68.000 $27.700 $8.000 $77.000 $100.000 $1.100 $130.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 14.000 $80.080 $35.000 $50.000 $200.000 $115.500 $470.000 $500.000
RIPRAP (CONC)(FLUME)
CY 4.000 $742.330 $700.000 $695.000 $1,000.000 $845.290 $2,200.000 $5,000.000
RETROFIT RAIL (TY PR11)
LF 96.000 $220.250 $250.000 $200.000 $300.000 $489.500 $250.000 $250.000
GRATE & FRAME
EA 4.000 $3,900.000 $1,850.000 $1,000.000 $2,500.000 $1,375.880 $9,000.000 $25,000.000
MOBILIZATION
LS 1.000 $137,798.030 $110,000.000 $95,000.000 $110,000.000 $130,144.000 $194,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $12,200.000 $7,000.000 $4,000.000 $3,000.000 $4,950.000 $26,500.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $10,000.000 $7,500.000 $3,500.000 $1.100 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 54.000 $250.000 $1.000 $700.000 $40.000 $1.100 $400.000 $250.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 44.000 $15.000 $55.000 $15.000 $10.000 $1.100 $6.500 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 44.000 $5.900 $10.000 $0.500 $2.000 $1.100 $1.750 $9.000
CONC CURB (TY II)
LF 146.000 $51.000 $45.000 $38.000 $50.000 $68.180 $55.000 $100.000
CONC CURB & GUTTER (TY II)
LF 716.000 $72.710 $55.000 $48.000 $65.000 $68.180 $75.000 $135.000
DRIVEWAYS (CONC)
SY 2,069.000 $135.000 $125.000 $120.000 $130.000 $152.020 $150.000 $150.000
CONC SIDEWALKS (4")
SY 3,434.000 $82.000 $80.000 $90.000 $95.000 $117.770 $95.000 $75.000
CONC SIDEWALKS (6")
SY 1,627.000 $125.000 $150.000 $119.000 $105.000 $152.020 $210.000 $95.000
CURB RAMPS (TY 1)
EA 15.000 $3,508.790 $2,900.000 $3,275.000 $2,800.000 $2,339.970 $3,250.000 $3,850.000
CURB RAMPS (TY 2)
EA 16.000 $3,081.820 $3,700.000 $3,275.000 $3,300.000 $2,259.710 $3,700.000 $3,850.000
CONC SIDEWALKS (SPECIAL)
SY 14.000 $5,801.000 $210.000 $100.000 $4,500.000 $2,584.320 $1,700.000 $200.000
CONC MEDIAN
SY 15.000 $185.000 $90.000 $100.000 $250.000 $126.610 $575.000 $250.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 7.000 $350.000 $380.000 $416.000 $550.000 $1.100 $486.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 37.000 $625.000 $650.000 $500.000 $850.000 $275.000 $1,000.000 $1,500.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,608.000 $10.000 $7.000 $12.000 $10.000 $11.000 $12.000 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 48.000 $71.000 $30.000 $30.000 $62.000 $19.800 $90.000 $150.000
RE PM TY II (W) 24" (SLD)
LF 2,608.000 $6.000 $4.000 $5.000 $4.500 $3.300 $6.500 $10.000
ELIM EXT PM & MRKS (24")
LF 2,509.000 $6.250 $4.000 $6.000 $6.500 $4.400 $6.000 $10.000
TREE REMOVAL (36" - 42" DIA)
EA 1.000 $1,000.000 $280.000 $301.000 $3,000.000 $3,850.000 $4,200.000 $10,000.000
Totals: $1,515,778.350 $1,271,684.300 $1,288,450.000 $1,375,026.500 $1,495,468.960 $1,947,807.000 $1,994,523.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
Total: $20,000.00