ECTOR VA (0906-00-271)

Items: 38

County: ECTOR
Length: N/A
Highway: VA
District: ODESSA
Control Number: 0906-00-271
DBE Goal: 0.0%
Project: F 2024(381)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $769,495.84
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: ADVANCED TRAFFIC MANAGEMENT SYSTEM
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$769,495.84
$831,393.82
Over/Under Est: 8.04% $61,897.98
$1,623,469.40
Over/Under Est: 110.98% $853,973.56
Amt Left: 95.27% $792,075.58
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 27.43% $239,390.11
JE CASEY, LLC 9.10% $79,418.52
BARRICADES UNLIMITED 4.58% $39,971.08
HJC FARMS, INC. 1.24% $10,821.86
Total: 42.35% $369,601.57

Bid Items & Bid Tabulations

38 Total 0 of 38
ECTOR  |  VA  |  ODESSA  |  0906-00-271  |  06/05/2024  |  $769,495.84  |  F 2024(381)  |  ADVANCED TRAF MGT SYSTEM  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LIGHT IT UP ELECTRIC
MICA CORPORATION
DRILL SHAFT (36 IN)
LF 60.000 $396.170 $600.000 $921.000
DRILL SHAFT (48 IN)
LF 42.000 $1,000.000 $800.000 $1,020.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 58.000 $237.810 $400.000 $370.000
RIPRAP (CONC)(4 IN)
CY 7.500 $1,200.000 $975.000 $7,360.000
RIPRAP (MOW STRIP)(4 IN)
CY 42.930 $774.480 $750.000 $1,265.000
MOBILIZATION
LS 1.000 $85,314.280 $100,000.000 $155,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,500.000 $8,000.000 $18,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 725.000 $39.710 $40.000 $48.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,673.650 $1,600.000 $3,740.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $4,000.000 $3,000.000 $8,050.000
CONDT (PVC) (SCH 40) (2")
LF 3,110.000 $19.000 $25.000 $35.050
CONDT (PVC) (SCH 80) (2") (BORE)
LF 140.000 $35.500 $50.000 $78.500
CONDT (RM) (2")
LF 80.000 $40.000 $50.000 $125.150
ELEC CONDR (NO.12) BARE
LF 115.000 $1.380 $2.000 $3.320
ELEC CONDR (NO.12) INSULATED
LF 230.000 $1.730 $2.000 $3.320
ELEC CONDR (NO.8) BARE
LF 400.000 $2.350 $2.000 $3.630
ELEC CONDR (NO.8) INSULATED
LF 3,275.000 $2.500 $2.000 $3.780
ELEC CONDR (NO.6) BARE
LF 975.000 $2.800 $2.250 $4.090
ELEC CONDR (NO.6) INSULATED
LF 1,390.000 $2.970 $2.500 $4.890
ELEC CONDR (NO.4) INSULATED
LF 3,600.000 $3.600 $3.000 $5.310
ELEC CONDR (NO.2) BARE
LF 2,165.000 $3.880 $4.150 $5.760
ELEC CONDR (NO.2) INSULATED
LF 3,830.000 $5.500 $4.400 $6.300
GROUND BOX TY A (122311)W/APRON
EA 20.000 $1,966.880 $1,700.000 $2,600.000
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 5.000 $9,000.000 $11,000.000 $12,835.000
ALUMINUM SIGNS (TY G)
SF 364.000 $42.000 $35.000 $36.650
INSTALL LRSS (STRUCT STEEL)
LB 2,066.540 $9.500 $8.000 $8.900
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 28.000 $45.500 $22.000 $46.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 2.000 $9,000.000 $11,300.000 $14,760.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 2.000 $5,500.000 $3,500.000 $5,705.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $18,000.000 $20,000.000 $197,200.000
ITS POLE (30 FT)(90 MPH)
EA 4.000 $15,000.000 $18,000.000 $21,825.000
ITS POLE (60 FT)(90 MPH)
EA 2.000 $27,000.000 $30,000.000 $45,670.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 2.000 $7,800.000 $7,000.000 $7,360.000
ITS POLE MNT CAB (SPL)(INTEGRATED)(INS)
EA 6.000 $2,000.000 $600.000 $2,830.000
ETHERNET SWITCH (INSTALL ONLY)
EA 4.000 $459.320 $900.000 $2,325.000
TMA (STATIONARY)
DAY 12.000 $375.220 $1,600.000 $775.000
CELLULAR MODEM (INSTALL ONLY)
EA 4.000 $1,465.000 $800.000 $2,010.000
TPAS VEH DET SYS (INSTALL ONLY)
EA 4.000 $1,500.000 $1,275.000 $6,970.000
Totals: $769,495.836 $831,393.820 $1,623,469.406