Show Job Controls
Bid Cobra

ECTOR VARIOUS (0906-00-256)

Items: 103

County: ECTOR
Length: 0.0000 MILES
Highway: VARIOUS
District: ODESSA
Control Number: 0906-00-256
DBE Goal: 3.0%
Project: STP 2025(372)HES
Guaranty: $100,000.00
Time: 177 WORKING DAYS
Engineer's Estimate: $6,735,407.03
Date: 06/05/2025 (1 year ago)
Contract Number: 6253215
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184350
Contract Type: Federal
Project Description: MEDIAN CROSSOVER IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,735,407.03
$8,360,128.00
Over/Under Est: 24.12% $1,624,720.97
$8,590,346.20
Over/Under Est: 27.54% $1,854,939.17
Amt Left: 2.75% $230,218.20
Over/Under Est: 29.38% $1,979,140.42
Amt Left: 4.24% $354,419.45
Delta: -1.45% -$124,201.25
Over/Under Est: 64.85% $4,367,586.32
Amt Left: 32.81% $2,742,865.35
Delta: -27.41% -$2,388,445.90

Bid Items & Bid Tabulations

103 Total 0 of 103
ECTOR  |  VARIOUS  |  ODESSA  |  0906-00-256  |  06/05/2025  |  $6,735,407.03  |  STP 2025(372)HES  |  HAZARD ELIM & SAFETY  |  177 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GREY SKY CONSTRUCTION LLC
REECE ALBERT, INC.
JAMES HAMILTON CONSTRUCTION CO.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
REMOV CONC (MOWSTRIP)
SY 2,493.000 $30.000 $50.000 $21.700 $40.000 $20.130
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 6,561.000 $7.000 $40.000 $4.490 $16.500 $25.000
EXCAV (ROADWAY)
CY 13,277.000 $30.000 $30.000 $12.590 $15.000 $43.250
SUBGR WIDEN (OC)
STA 442.000 $500.000 $650.000 $884.550 $750.000 $1,750.000
EMBANK (FNL)(OC)(TY B)
CY 2,358.000 $27.600 $65.000 $68.000 $40.000 $110.000
BLADING
HR 40.000 $270.000 $150.000 $558.560 $500.000 $450.000
DRILL SEED (PERM_URBAN_SAND)
SY 55,075.000 $0.750 $1.000 $0.420 $0.330 $0.490
PROOF ROLLING
HR 40.000 $138.000 $150.000 $203.670 $160.000 $200.000
FL BS (CMP IN PLC)(TY A GR 4) (10")
SY 45,661.000 $21.000 $23.000 $41.980 $20.000 $40.000
PRIME COAT (MC-30)
GAL 9,133.000 $11.000 $5.000 $8.510 $7.000 $11.040
ASPH (AC-20-5TR)
GAL 17,352.000 $5.000 $10.000 $6.130 $7.700 $8.880
AGGR (TY-PB, GR-4)(SAC-A)
CY 506.000 $120.000 $350.000 $454.600 $280.000 $600.000
SP MIXES SP-C PG70-22
TON 5,022.000 $150.000 $190.000 $211.530 $264.000 $250.000
TOM-C PG76-22 SAC-A
TON 2,510.000 $300.000 $225.000 $298.480 $318.000 $283.030
DRILL SHAFT (24 IN)
LF 14.000 $330.000 $350.000 $337.770 $335.000 $362.250
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 200.000 $400.000 $350.000 $498.340 $500.000 $517.500
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 42.000 $510.000 $450.000 $609.080 $600.000 $632.500
RIPRAP (CONC)(4 IN)
CY 73.500 $785.000 $650.000 $308.920 $1,200.000 $1,725.000
RIPRAP (MOW STRIP)(4 IN)
CY 442.000 $650.000 $950.000 $675.530 $1,000.000 $701.500
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 4.000 $5,000.000 $12,500.000 $16,141.800 $20,000.000 $21,275.000
REMOV STR (INLET)
EA 4.000 $1,900.000 $2,500.000 $2,918.310 $5,000.000 $2,875.000
REMOV STR (SET)
EA 2.000 $800.000 $500.000 $1,223.660 $4,500.000 $1,725.000
REMOV STR (PIPE)
LF 42.000 $35.000 $50.000 $58.270 $200.000 $57.500
MOBILIZATION
LS 1.000 $613,302.230 $800,000.000 $776,797.630 $1,060,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $15,000.000 $13,306.940 $40,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $20,000.000 $15,886.110 $20,000.000 $26,250.000
TMA (STATIONARY)
DAY 270.000 $150.000 $250.000 $365.090 $350.000 $225.000
TMA (MOBILE OPERATION)
DAY 9.000 $440.000 $250.000 $895.870 $1,000.000 $1,275.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,216.000 $10.000 $18.000 $11.070 $11.500 $15.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,216.000 $3.000 $9.000 $2.210 $2.750 $3.380
MTL W-BEAM GD FEN (STEEL POST)
LF 713.000 $44.000 $35.000 $39.870 $40.000 $41.400
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,350.000 $1,850.000 $2,353.280 $2,400.000 $2,443.750
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 9,078.000 $14.000 $28.000 $18.830 $18.700 $19.550
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 30.000 $4,200.000 $3,850.000 $5,160.600 $5,000.000 $5,359.000
CABLE BARRIER (REMOVE)
LF 7,617.000 $8.000 $5.000 $4.430 $4.400 $4.600
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 23.000 $1,100.000 $1,000.000 $1,661.140 $1,650.000 $1,725.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,850.000 $3,931.360 $3,900.000 $4,082.500
IN RD IL (TY AL) 40T-8 (250W EQ) LED
EA 5.000 $5,400.000 $6,500.000 $7,198.260 $7,200.000 $7,475.000
IN RD IL (TY AL) 50T-8-8 (400W EQ) LED
EA 16.000 $6,500.000 $8,500.000 $11,627.970 $11,550.000 $12,075.000
CONDT (PVC) (SCH 80) (2")
LF 3,330.000 $18.000 $30.000 $11.070 $11.000 $11.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,410.000 $26.000 $80.000 $55.370 $55.000 $57.500
CONDT (PVC) (SCH 80) (3")
LF 145.000 $25.000 $40.000 $33.220 $33.000 $34.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 265.000 $30.000 $90.000 $66.450 $66.000 $69.000
ELEC CONDR (NO.8) BARE
LF 4,915.000 $2.400 $3.000 $1.380 $1.400 $1.440
ELEC CONDR (NO.8) INSULATED
LF 11,380.000 $2.700 $3.000 $1.940 $1.900 $2.010
ELEC CONDR (NO.6) BARE
LF 450.000 $2.750 $3.000 $1.940 $1.900 $2.010
ELEC CONDR (NO.6) INSULATED
LF 70.000 $2.800 $3.000 $2.490 $2.500 $2.590
GROUND BOX TY A (122311)W/APRON
EA 22.000 $1,900.000 $1,500.000 $1,937.990 $1,925.000 $2,012.500
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,900.000 $1,650.000 $2,768.560 $2,750.000 $2,875.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 4.000 $9,500.000 $12,500.000 $12,181.680 $12,100.000 $12,650.000
ELC SRV TY D 120/240 060(SS)SS(E)SP(O)
EA 1.000 $6,000.000 $12,500.000 $13,289.100 $13,200.000 $13,800.000
ALUMINUM SIGNS (TY A)
SF 78.000 $45.000 $30.000 $83.060 $82.500 $86.250
ALUMINUM SIGNS (TY G)
SF 110.000 $37.000 $30.000 $42.080 $42.000 $43.700
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 59.000 $750.000 $1,500.000 $781.840 $777.000 $1,035.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 48.000 $804.000 $1,500.000 $1,077.520 $1,070.000 $1,270.750
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $1,000.000 $1,500.000 $878.190 $872.000 $1,132.750
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 13.000 $1,200.000 $1,500.000 $1,241.420 $1,233.000 $1,437.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,300.000 $1,500.000 $1,094.140 $1,087.000 $1,345.500
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,350.000 $1,500.000 $1,483.950 $1,475.000 $1,725.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 43.000 $650.000 $1,100.000 $756.370 $751.000 $1,063.750
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $700.000 $1,100.000 $866.010 $860.000 $1,081.000
REMOVE SM RD SN SUP&AM
EA 150.000 $160.000 $100.000 $160.520 $220.000 $175.000
INSTALL LRSS (STRUCT STEEL)
LB 591.000 $9.000 $20.000 $8.530 $8.500 $15.530
REMOVE LRSA
EA 1.000 $1,400.000 $5,000.000 $1,218.170 $1,210.000 $1,725.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 19.000 $18.000 $100.000 $33.220 $33.000 $34.500
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
EA 42.000 $52.000 $1,000.000 $53.160 $53.000 $143.750
INSTL OM ASSM (OM-2Y)(WC)GND
EA 34.000 $90.000 $100.000 $56.480 $56.000 $143.750
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,299.000 $1.000 $2.000 $1.380 $1.400 $1.440
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 41,680.000 $1.000 $2.000 $0.940 $1.100 $0.980
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 116,691.000 $1.500 $1.500 $0.960 $1.200 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 117,687.000 $1.500 $1.500 $0.960 $1.200 $1.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 29,888.000 $0.750 $1.500 $0.730 $0.800 $0.760
PREFAB PM TY C (W)(24")(SLD)
LF 1,289.000 $18.000 $20.000 $15.500 $16.000 $16.100
PREFAB PM TY C (W)(ARROW)
EA 93.000 $270.000 $250.000 $276.860 $275.000 $287.500
PREFAB PM TY C (W)(WORD)
EA 93.000 $325.000 $250.000 $354.380 $385.000 $368.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 446.000 $45.000 $75.000 $19.930 $60.500 $20.700
REFL PAV MRKR TY II-C-R
EA 2,920.000 $6.000 $6.000 $4.710 $5.500 $4.890
ELIM EXT PM & MRKS (4")
LF 104,664.000 $1.250 $0.500 $1.280 $1.150 $7.750
ELIM EXT PM & MRKS (24")
LF 148.000 $15.000 $20.000 $1.150 $4.400 $25.000
ELIM EXT PM & MRKS (ARROW)
EA 11.000 $105.000 $250.000 $59.130 $59.000 $30.000
ELIM EXT PM & MRKS (WORD)
EA 12.000 $105.000 $250.000 $58.910 $59.000 $30.000
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 12.000 $25.000 $150.000 $58.910 $59.000 $30.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $36,000.000 $50,000.000 $55,371.270 $55,000.000 $57,500.000
VEH SIG SEC (12")LED(GRN)
EA 7.000 $400.000 $385.000 $359.910 $358.000 $373.750
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $400.000 $385.000 $359.920 $358.000 $373.750
VEH SIG SEC (12")LED(YEL)
EA 7.000 $400.000 $385.000 $359.910 $358.000 $373.750
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $400.000 $385.000 $359.920 $358.000 $373.750
VEH SIG SEC (12")LED(RED)
EA 7.000 $400.000 $385.000 $359.910 $358.000 $373.750
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $400.000 $385.000 $359.910 $358.000 $373.750
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 7.000 $230.000 $200.000 $221.490 $220.000 $230.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $280.000 $250.000 $276.860 $275.000 $287.500
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 315.000 $3.500 $3.000 $3.320 $3.300 $3.450
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 105.000 $4.750 $3.000 $4.430 $4.500 $4.600
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 595.000 $6.000 $3.000 $6.640 $6.500 $6.900
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $1,450.000 $2,500.000 $719.830 $715.000 $747.500
INS TRF SIG PL AM(S)1 ARM(44')
EA 2.000 $15,400.000 $25,000.000 $19,379.950 $19,250.000 $20,125.000
INS TRF SIG PL AM(S)1 ARM(48')
EA 1.000 $21,500.000 $30,000.000 $22,148.510 $22,000.000 $23,000.000
BONDING COURSE
GAL 4,567.000 $5.500 $10.000 $3.680 $8.000 $11.200
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $10,500.000 $6,500.000 $13,289.100 $13,200.000 $13,800.000
RVDS (PRESENCE DETECTION ONLY)
EA 3.000 $9,000.000 $15,000.000 $18,272.520 $18,150.000 $18,975.000
RVDS (ADVANCE DETENTION ONLY)
EA 3.000 $6,900.000 $15,000.000 $18,272.520 $18,150.000 $18,975.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $3,000.000 $6,500.000 $12,735.390 $12,650.000 $13,225.000
CCTV MOUNT (POLE)
EA 1.000 $750.000 $2,500.000 $4,983.410 $4,950.000 $5,175.000
Totals: $6,735,407.030 $8,360,128.000 $8,590,346.200 $8,714,547.450 $11,102,993.350
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $65,000.00