|
|
|
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
32,994.000
|
$6.000
|
$13.360
|
$10.000
|
$20.000
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
25,987.000
|
$14.000
|
$7.470
|
$50.000
|
$31.750
|
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
25,556.000
|
$15.000
|
$26.790
|
$15.000
|
$26.500
|
|
|
|
BLADING
|
HR
|
100.000
|
$150.000
|
$214.890
|
$157.000
|
$400.000
|
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
145,688.000
|
$0.250
|
$0.210
|
$0.190
|
$0.210
|
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$100.000
|
$181.730
|
$133.200
|
$150.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
65,216.000
|
$15.000
|
$15.160
|
$10.000
|
$15.500
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
13,043.000
|
$5.000
|
$6.350
|
$6.000
|
$4.860
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
24,783.000
|
$5.000
|
$5.930
|
$5.500
|
$5.120
|
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
655.000
|
$138.000
|
$582.050
|
$175.000
|
$245.000
|
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
21,522.000
|
$110.000
|
$181.220
|
$160.000
|
$126.000
|
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
10,474.000
|
$157.000
|
$219.800
|
$155.000
|
$150.000
|
|
|
|
TACK COAT
|
GAL
|
6,521.000
|
$5.000
|
$2.850
|
$6.750
|
$4.420
|
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (4"-6")
|
SY
|
333.000
|
$200.000
|
$107.460
|
$165.000
|
$340.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
575.000
|
$200.000
|
$209.650
|
$109.000
|
$352.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
313.000
|
$8.000
|
$45.720
|
$21.000
|
$55.000
|
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$100.000
|
$201.830
|
$100.000
|
$198.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
226.000
|
$200.000
|
$257.890
|
$200.000
|
$253.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
620.000
|
$458.000
|
$476.540
|
$425.000
|
$467.500
|
|
|
|
CLASS S CONC UTILITY PROTECTION PAD
|
CY
|
22.140
|
$1,100.000
|
$2,421.180
|
$1,040.000
|
$1,265.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
228.000
|
$650.000
|
$572.560
|
$673.000
|
$990.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
129.000
|
$650.000
|
$756.850
|
$681.000
|
$742.500
|
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
3.000
|
$10,499.000
|
$12,741.660
|
$8,410.000
|
$15,950.000
|
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$7,414.000
|
$8,451.810
|
$5,840.000
|
$9,350.000
|
|
|
|
REMOV STR (SET)
|
EA
|
20.000
|
$600.000
|
$600.020
|
$800.000
|
$1,100.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,300.000
|
$2,044.040
|
$1,500.000
|
$1,100.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
28.000
|
$898.000
|
$771.450
|
$3,000.000
|
$825.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$668,679.660
|
$1,168,967.560
|
$1,635,000.000
|
$800,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$12,500.000
|
$8,503.870
|
$72,500.000
|
$30,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
12.000
|
$6,000.000
|
$15,674.290
|
$10,000.000
|
$19,250.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
360.000
|
$209.000
|
$288.990
|
$287.000
|
$137.500
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$400.000
|
$650.690
|
$620.000
|
$935.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
666.000
|
$25.000
|
$37.480
|
$15.000
|
$28.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
666.000
|
$11.000
|
$9.000
|
$10.000
|
$25.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
21,357.000
|
$8.000
|
$8.410
|
$7.500
|
$8.250
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
21,357.000
|
$1.000
|
$1.120
|
$1.000
|
$1.100
|
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,740.000
|
$20.000
|
$26.460
|
$21.000
|
$13.200
|
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
25,800.000
|
$8.000
|
$8.250
|
$9.500
|
$11.000
|
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
7,740.000
|
$15.000
|
$20.190
|
$11.000
|
$13.200
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
221.000
|
$62.000
|
$75.730
|
$75.000
|
$225.000
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
23,600.000
|
$0.200
|
$0.360
|
$0.110
|
$0.390
|
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
6,838.000
|
$100.000
|
$99.440
|
$130.000
|
$275.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,714.000
|
$37.000
|
$38.120
|
$31.000
|
$37.400
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,562.000
|
$1,513.700
|
$1,700.000
|
$1,485.000
|
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
|
LF
|
2,041.000
|
$13.000
|
$28.310
|
$27.600
|
$27.780
|
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
11.000
|
$2,919.000
|
$7,848.810
|
$3,630.000
|
$7,700.000
|
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
4,230.000
|
$7.000
|
$6.730
|
$6.000
|
$6.600
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,942.000
|
$4,485.040
|
$3,200.000
|
$4,400.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$1,655.000
|
$1,672.850
|
$1,410.000
|
$3,850.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,210.000
|
$1,294.680
|
$1,181.000
|
$1,650.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$9,429.140
|
$8,500.000
|
$30,800.000
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
12.000
|
$450.000
|
$840.940
|
$750.000
|
$825.000
|
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
60.000
|
$5,000.000
|
$8,689.760
|
$7,750.000
|
$8,525.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
13,550.000
|
$11.000
|
$7.850
|
$7.000
|
$7.700
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,270.000
|
$39.000
|
$28.030
|
$25.000
|
$27.500
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
16,720.000
|
$1.200
|
$1.680
|
$1.500
|
$1.650
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
33,440.000
|
$1.500
|
$1.960
|
$1.750
|
$1.930
|
|
|
|
GROUND BOX TY A (122311)
|
EA
|
14.000
|
$1,408.000
|
$1,513.700
|
$1,350.000
|
$1,485.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$1,700.000
|
$2,130.390
|
$1,900.000
|
$2,090.000
|
|
|
|
REMOVE GROUND BOX
|
EA
|
8.000
|
$250.000
|
$560.630
|
$500.000
|
$550.000
|
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$813.000
|
$1,121.260
|
$1,000.000
|
$1,100.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$11,000.000
|
$16,818.880
|
$15,000.000
|
$16,500.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,187.000
|
$30.000
|
$39.240
|
$32.000
|
$38.500
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$600.000
|
$840.940
|
$650.000
|
$825.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
77.000
|
$650.000
|
$953.070
|
$740.000
|
$935.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$850.000
|
$953.070
|
$800.000
|
$935.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
16.000
|
$850.000
|
$1,009.130
|
$775.000
|
$990.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
30.000
|
$900.000
|
$1,110.050
|
$860.000
|
$1,089.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
31.000
|
$900.000
|
$1,110.050
|
$925.000
|
$1,089.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
14.000
|
$1,000.000
|
$1,345.510
|
$1,100.000
|
$1,320.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,100.000
|
$1,345.510
|
$1,200.000
|
$1,320.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
95.000
|
$100.000
|
$184.540
|
$80.000
|
$150.000
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
7,721.000
|
$8.000
|
$8.970
|
$7.500
|
$8.800
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
|
EA
|
25.000
|
$42.000
|
$39.240
|
$45.000
|
$38.500
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
79,407.000
|
$0.200
|
$0.280
|
$0.370
|
$0.410
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
91,200.000
|
$0.200
|
$0.240
|
$0.360
|
$0.400
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
384.000
|
$2.000
|
$1.680
|
$6.500
|
$7.150
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
88,083.000
|
$0.200
|
$0.240
|
$0.360
|
$0.400
|
|
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,262.000
|
$1.200
|
$1.350
|
$0.850
|
$0.940
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
797.000
|
$1.000
|
$2.240
|
$1.020
|
$1.120
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
23,540.000
|
$0.800
|
$1.070
|
$1.020
|
$1.120
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
310.000
|
$7.000
|
$6.730
|
$1.500
|
$1.650
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
7,200.000
|
$0.800
|
$0.840
|
$0.850
|
$0.940
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
43,369.000
|
$0.600
|
$0.800
|
$0.850
|
$0.940
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
33,165.000
|
$0.600
|
$0.800
|
$0.850
|
$0.940
|
|
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
500.000
|
$14.000
|
$15.700
|
$13.250
|
$14.580
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
34.000
|
$251.000
|
$302.740
|
$225.000
|
$247.500
|
|
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
11.000
|
$301.000
|
$728.820
|
$430.000
|
$473.000
|
|
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
6.000
|
$550.000
|
$672.760
|
$500.000
|
$550.000
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
46.000
|
$250.000
|
$358.800
|
$325.000
|
$357.500
|
|
|
|
PREFAB PM TY C (W)(SYMBOL)
|
EA
|
10.000
|
$500.000
|
$840.940
|
$1,870.000
|
$2,057.000
|
|
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
30.000
|
$20.000
|
$28.030
|
$50.000
|
$55.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,197.000
|
$4.500
|
$4.770
|
$4.500
|
$4.950
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
41,340.000
|
$0.500
|
$0.780
|
$0.880
|
$1.000
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
225,149.000
|
$0.400
|
$0.890
|
$0.900
|
$0.850
|
|
|
|
BONDING COURSE
|
GAL
|
18,215.000
|
$4.000
|
$2.820
|
$5.900
|
$4.780
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
356.000
|
$130.000
|
$172.540
|
$82.500
|
$110.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
0.000
|
$130.000
|
$0.000
|
$0.000
|
$0.000
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,120.000
|
$125.000
|
$182.520
|
$125.500
|
$165.000
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
0.000
|
$125.000
|
$0.000
|
$0.000
|
$0.000
|
|
3
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,132.000
|
$139.000
|
$196.960
|
$143.500
|
$214.500
|
|
3A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
0.000
|
$139.000
|
$0.000
|
$0.000
|
$0.000
|
|
4
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,415.000
|
$2,589.280
|
$2,625.000
|
$2,200.000
|
|
4A
|
|
SET (TY II) (18 IN) (TP) (4: 1) (C)
|
EA
|
0.000
|
$1,415.000
|
$0.000
|
$0.000
|
$0.000
|
|
5
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,823.000
|
$2,736.440
|
$2,625.000
|
$2,475.000
|
|
5A
|
|
SET (TY II) (18 IN) (TP) (6: 1) (P)
|
EA
|
0.000
|
$1,823.000
|
$0.000
|
$0.000
|
$0.000
|
|
6
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
22.000
|
$2,497.000
|
$2,833.100
|
$3,015.000
|
$2,750.000
|
|
6A
|
|
SET (TY II) (24 IN) (TP) (4: 1) (C)
|
EA
|
0.000
|
$2,497.000
|
$0.000
|
$0.000
|
$0.000
|
|
7
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
11.000
|
$2,642.000
|
$3,079.680
|
$3,215.000
|
$3,025.000
|
|
7A
|
|
SET (TY II) (24 IN) (TP) (6: 1) (P)
|
EA
|
0.000
|
$2,642.000
|
$0.000
|
$0.000
|
$0.000
|
|
8
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$4,164.000
|
$4,990.060
|
$5,770.000
|
$5,500.000
|
|
8A
|
|
SET (TY II) (30 IN) (TP) (4: 1) (C)
|
EA
|
0.000
|
$4,164.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$11,813,340.560
|
$16,211,726.075
|
$16,378,565.280
|
$16,519,821.970
|