ECTOR IH 20 (0004-07-139)

Items: 36

County: ECTOR
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0004-07-139
DBE Goal: N/A
Project: BR 2024(304)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $2,769,226.90
Date: 11/01/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,769,226.90
Over/Under Est: -27.81% -$770,142.20
Over/Under Est: -23.02% -$637,498.65
Amt Left: 6.64% $132,643.55
Over/Under Est: -11.56% -$320,206.15
Amt Left: 22.51% $449,936.05
Delta: -14.88% -$317,292.50
Over/Under Est: 12.37% $342,691.10
Amt Left: 55.67% $1,112,833.30
Delta: -27.07% -$662,897.25
$3,307,010.00
Over/Under Est: 19.42% $537,783.10
Amt Left: 65.43% $1,307,925.30
Delta: -6.27% -$195,092.00
Over/Under Est: 21.91% $606,768.10
Amt Left: 68.88% $1,376,910.30
Delta: -2.09% -$68,985.00
Subcontractor Percentage Amount
GIBSON & ASSOCIATES, INC. 26.71% $1,070,049.01
JB PINNACLE GROUP, LLC 4.11% $164,653.74
DEPENDABLE FENCE 1.85% $74,114.21
SOUTHEAST GRINDING AND GROOVING LLC 0.68% $27,241.98
TEXAS CURB CUT 0.68% $27,241.98
Total: 34.03% $1,363,300.92

Bid Items & Bid Tabulations

36 Total 0 of 36
ECTOR  |  IH 20  |  ODESSA  |  0004-07-139  |  11/01/2023  |  $2,769,226.90  |  BR 2024(304)  |  BRIDGE MAINT  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
SCR CIVIL CONSTRUCTION, LLC
RAGLE CONSTRUCTION, INC.
SOUTHERN ROAD & BRIDGE, LLC
FNH CONSTRUCTION, LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PENETRATING CONCRETE SURFACE TREATMENT
SY 17,162.000 $13.000 $9.240 $20.000 $6.000 $21.000 $25.000 $30.000
CONC STR REPAIR (EPOXY MORTAR)
SF 295.000 $300.000 $235.680 $213.000 $190.000 $424.000 $650.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,004.000 $250.000 $182.400 $190.000 $160.000 $300.000 $500.000 $400.000
CONC STR REPAIR (STANDARD)
SF 10.000 $350.000 $230.780 $185.000 $300.000 $285.000 $500.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 75.000 $2,000.000 $745.210 $756.000 $646.000 $595.000 $650.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $550.000 $1,160.940 $1,235.000 $700.000 $950.000 $650.000 $1,000.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,038.000 $45.000 $53.640 $50.000 $49.000 $52.000 $100.000 $100.000
RETROFIT RAIL (TY SSTR)
LF 1,012.000 $350.000 $326.890 $307.500 $275.000 $225.000 $200.000 $400.000
MOBILIZATION
LS 1.000 $251,747.900 $199,908.000 $201,800.000 $240,000.000 $333,000.000 $325,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $40,000.000 $9,972.140 $3,900.000 $60,000.000 $18,000.000 $12,500.000 $2,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,755.000 $20.000 $5.830 $10.900 $9.500 $8.000 $18.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,755.000 $2.500 $1.600 $1.150 $1.000 $1.000 $9.000 $3.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 1.000 $10,000.000 $7,045.440 $10,500.000 $10,000.000 $9,500.000 $8,500.000 $7,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 860.000 $90.000 $49.710 $24.000 $120.000 $95.000 $110.000 $100.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 860.000 $12.000 $16.450 $24.000 $7.000 $35.000 $40.000 $35.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 860.000 $25.000 $20.170 $24.000 $18.000 $35.000 $40.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 925.000 $40.000 $42.800 $42.500 $32.250 $50.000 $50.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $4,617.830 $3,780.000 $2,775.000 $4,500.000 $4,000.000 $4,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,800.000 $2,222.130 $1,941.000 $1,250.000 $2,500.000 $2,500.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 925.000 $3.500 $6.140 $6.000 $3.000 $8.000 $3.000 $8.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $180.000 $1,354.270 $345.000 $300.000 $450.000 $1,000.000 $600.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $250.000 $827.130 $345.000 $300.000 $450.000 $1,000.000 $600.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $4,057.130 $4,042.000 $3,300.000 $5,000.000 $5,000.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $350.000 $1,354.270 $350.000 $300.000 $500.000 $2,500.000 $1,650.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $3,000.000 $3,914.270 $4,000.000 $500.000 $1,850.000 $6,500.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $2,500.000 $2,054.270 $3,000.000 $663.000 $2,000.000 $2,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $15,000.000 $13,085.670 $9,000.000 $20,000.000 $15,000.000 $30,000.000 $15,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 44.000 $30.000 $61.980 $37.000 $50.000 $75.000 $100.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 34.000 $30.000 $34.000 $20.000 $18.500 $75.000 $100.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 44.000 $35.000 $61.980 $31.000 $50.000 $75.000 $100.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 16.000 $30.000 $51.450 $20.000 $18.500 $75.000 $100.000 $50.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 2.000 $1.500 $513.570 $2,300.000 $250.000 $1,500.000 $1,500.000 $500.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 245.000 $125.000 $176.590 $90.000 $105.000 $222.000 $100.000 $150.000
STEEL BRIDGE ZONE PAINTING REF STR #3
EA 3.000 $120,000.000 $89,783.580 $98,900.000 $133,000.000 $238,500.000 $100,000.000 $150,000.000
TMA (STATIONARY)
DAY 177.000 $300.000 $309.140 $300.000 $400.000 $300.000 $250.000 $300.000
BRIDGE SUBSTRUCTURE CLEANING (ABUT)
EA 4.000 $500.000 $3,491.070 $4,425.000 $2,100.000 $2,500.000 $10,000.000 $2,500.000
Totals: $2,769,226.900 $1,999,084.700 $2,131,728.250 $2,449,020.750 $3,111,918.000 $3,307,010.000 $3,375,995.000