Bid Cobra

ECTOR IH 20 (0004-07-126)

Items: 55

County: ECTOR
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0004-07-126
DBE Goal: N/A
Project: NH 1702(493)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $3,770,810.08
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: BRIDGE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$3,770,810.08
$3,476,509.80
Over/Under Est: -7.8% -$294,300.28

Bid Items & Bid Tabulations

55 Total 0 of 55
ECTOR  |  IH 20  |  ODESSA  |  0004-07-126  |  07/11/2017  |  $3,770,810.08  |  NH 1702(493)  |  BRIDGE REPAIR  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
EXCAVATION (ROADWAY)
CY 670.000 $10.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 3,631.000 $10.000 $28.000
BLADING
HR 40.000 $125.000 $403.000
PROOF ROLLING
HR 20.000 $125.000 $150.000
PRIME COAT (AE-P)
GAL 3,711.000 $4.000 $3.900
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
TON 9,183.000 $150.000 $89.000
CEM STABIL BKFL
CY 977.000 $60.000 $121.000
REINF CONC SLAB (EXTEND SLAB)
SF 780.000 $25.000 $65.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 1,880.000 $20.000 $70.000
BRIDGE SIDEWALK
SF 325.000 $25.000 $75.000
PRESTR CONC GIRDER (TX28)
LF 130.000 $128.000 $450.000
PRESTR CONC BEAM (TY C)
LF 65.000 $200.000 $310.000
RAIL (TY C402)(HPC)
LF 65.000 $125.000 $350.000
RAIL (T6)
LF 65.000 $150.000 $150.000
RC PIPE (CL III)(18 IN)
LF 3,476.000 $65.000 $63.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,000.000 $1,700.000
REMOVE STR (DAMAGED BEAM)
EA 3.000 $4,500.000 $18,000.000
REMOV STR (BRIDGE SLAB)
LF 195.000 $55.000 $300.000
REMOVE STR (RAIL)
LF 130.000 $18.000 $100.000
MOBILIZATION
LS 1.000 $300,903.580 $319,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $12,000.000 $18,300.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $20.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $10.000 $6.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 180.000 $5.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 180.000 $1.500 $8.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $12,000.000 $3,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,190.000 $30.000 $19.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 5,190.000 $8.000 $5.000
PERM CTB (F-SHAPE) (TY 1)
LF 5,280.000 $60.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 695.000 $25.000 $28.000
REMOVE METAL BEAM GUARD FENCE
LF 695.000 $3.000 $6.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 4.000 $2,500.000 $3,000.000
REMOVE CABLE BARRIER
LF 4,983.000 $4.000 $8.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 4.000 $600.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,400.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $600.000
CRASH CUSH ATTEN (INSTL)
EA 17.000 $16,000.000 $7,000.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $750.000 $2,400.000
WK ZN PAV MRK REMOV (REFL) TY I-A
LF 11,512.000 $3.000 $0.750
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 10,548.000 $3.000 $0.750
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 10,548.000 $1.000 $0.750
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 11,512.000 $1.000 $0.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $9.000 $18.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,552.000 $0.750 $1.000
REFL PAV MRK TY I (W)4"(LNDP)(090MIL)
LF 195.000 $1.500 $1.150
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 130.000 $0.300 $1.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 4,720.000 $0.300 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 19,226.000 $0.300 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 19,100.000 $0.300 $0.400
REFL PAV MRKR TY II-C-R
EA 237.000 $3.100 $3.750
ELIM EXT PAV MRK & MRKS (4")
LF 43,371.000 $0.500 $0.500
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 80.000 $60.000 $120.000
CONCRETE BEAM REPAIR (CFRP)
EA 4.000 $4,500.000 $19,000.000
NO. OF WORKING DAYS
$/D 4,000.000 $88.000 $70.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $12,500.000 $14,000.000
Totals: $3,770,810.080 $3,476,509.800