EXCAVATION (ROADWAY)
|
CY
|
670.000
|
$10.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,631.000
|
$10.000
|
$28.000
|
|
|
BLADING
|
HR
|
40.000
|
$125.000
|
$403.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$125.000
|
$150.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
3,711.000
|
$4.000
|
$3.900
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
9,183.000
|
$150.000
|
$89.000
|
|
|
CEM STABIL BKFL
|
CY
|
977.000
|
$60.000
|
$121.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
780.000
|
$25.000
|
$65.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
1,880.000
|
$20.000
|
$70.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
325.000
|
$25.000
|
$75.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
130.000
|
$128.000
|
$450.000
|
|
|
PRESTR CONC BEAM (TY C)
|
LF
|
65.000
|
$200.000
|
$310.000
|
|
|
RAIL (TY C402)(HPC)
|
LF
|
65.000
|
$125.000
|
$350.000
|
|
|
RAIL (T6)
|
LF
|
65.000
|
$150.000
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,476.000
|
$65.000
|
$63.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,000.000
|
$1,700.000
|
|
|
REMOVE STR (DAMAGED BEAM)
|
EA
|
3.000
|
$4,500.000
|
$18,000.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
LF
|
195.000
|
$55.000
|
$300.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
130.000
|
$18.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,903.580
|
$319,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$12,000.000
|
$18,300.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$20.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$10.000
|
$6.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
180.000
|
$5.000
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
180.000
|
$1.500
|
$8.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$12,000.000
|
$3,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
5,190.000
|
$30.000
|
$19.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
5,190.000
|
$8.000
|
$5.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
5,280.000
|
$60.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
695.000
|
$25.000
|
$28.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
695.000
|
$3.000
|
$6.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$2,500.000
|
$3,000.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
4,983.000
|
$4.000
|
$8.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$600.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,400.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$275.000
|
$600.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
17.000
|
$16,000.000
|
$7,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$750.000
|
$2,400.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
LF
|
11,512.000
|
$3.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
10,548.000
|
$3.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
10,548.000
|
$1.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
11,512.000
|
$1.000
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$9.000
|
$18.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,552.000
|
$0.750
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(LNDP)(090MIL)
|
LF
|
195.000
|
$1.500
|
$1.150
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
130.000
|
$0.300
|
$1.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,720.000
|
$0.300
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
19,226.000
|
$0.300
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
19,100.000
|
$0.300
|
$0.400
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
237.000
|
$3.100
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
43,371.000
|
$0.500
|
$0.500
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
80.000
|
$60.000
|
$120.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
4.000
|
$4,500.000
|
$19,000.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
4,000.000
|
$88.000
|
$70.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$12,500.000
|
$14,000.000
|
|
Totals: |
$3,770,810.080
|
$3,476,509.800
|