EASTLAND FM 571 (0570-01-022)

Items: 56

County: EASTLAND
Length: N/A
Highway: FM 571
District: BROWNWOOD
Control Number: 0570-01-022
DBE Goal: N/A
Project: BR 2022(603)
Guaranty: N/A
Time: 112 WORKING DAYS
Engineer's Estimate: $1,059,302.30
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JORDAN PERRY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,059,302.30
$1,064,649.96
Over/Under Est: 0.5% $5,347.66
Over/Under Est: 14.23% $150,711.70
Amt Left: 13.65% $145,364.04
$1,243,743.50
Over/Under Est: 17.41% $184,441.20
Amt Left: 16.82% $179,093.54
Delta: -2.79% -$33,729.50
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 9.50% $116,083.89
STRIPING TECHNOLOGY, L.P. 2.08% $25,416.26
WOLFE CONSTRUCTION GROUP, INCORPORATED 1.85% $22,605.81
TEXOP CONSTRUCTION 1.17% $14,296.65
TEXAS TRAFFIC AND BARRICADE, LLC 1.09% $13,319.10
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.89% $10,875.23
Total: 16.58% $202,596.94

Bid Items & Bid Tabulations

56 Total 0 of 56
EASTLAND  |  FM 571  |  BROWNWOOD  |  0570-01-022  |  06/02/2022  |  $1,059,302.30  |  BR 2022(603)  |  BRIDGE REPL  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 6.900 $2,500.000 $2,500.000 $5,000.000 $15,000.000
EXCAVATION (ROADWAY)
CY 671.000 $20.000 $18.000 $15.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 367.000 $22.000 $28.000 $20.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,002.000 $11.000 $3.000 $5.000 $5.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,517.000 $2.500 $1.550 $2.000 $2.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 840.000 $2.500 $2.760 $3.000 $3.000
BROADCAST SEED (TEMP) (WARM)
SY 1,179.000 $2.000 $2.150 $2.000 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 1,178.000 $2.000 $2.150 $2.000 $2.000
VEGETATIVE WATERING
MG 35.000 $50.000 $25.000 $1.000 $100.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 2,357.000 $5.000 $2.000 $2.000 $4.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 673.000 $85.000 $60.000 $60.000 $60.000
CEMENT
TON 2.000 $300.000 $1,000.000 $250.000 $500.000
CEMENT TREAT (NEW BASE) (10")
SY 114.000 $10.000 $48.000 $175.000 $40.000
PRIME COAT (RC-250)
GAL 575.000 $20.000 $19.500 $10.000 $10.000
ASPH (AC-20-5TR)
GAL 1,748.000 $15.000 $21.500 $10.000 $20.000
AGGR(TY-B GR-5 SAC-B)
CY 18.000 $1,000.000 $1,275.000 $600.000 $750.000
AGGR(TY-PB GR-3 SAC-B)
CY 28.000 $800.000 $905.000 $1,100.000 $750.000
AGGR(TY-PB GR-4 SAC-B)
CY 20.000 $800.000 $1,240.000 $1,100.000 $750.000
CEM STABIL BKFL
CY 71.000 $250.000 $210.000 $225.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 72.000 $15.000 $49.980 $1.000 $10.000
TEMPORARY SPL SHORING
SF 455.000 $25.000 $52.000 $120.000 $10.000
CL C CONC (CULV)
CY 50.900 $1,100.000 $1,400.000 $1,200.000 $1,300.000
REINF CONC SLAB
SF 1,173.600 $28.000 $30.000 $25.000 $30.000
RIPRAP (CONC)(5 IN)
CY 27.000 $600.000 $600.000 $600.000 $800.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 151.000 $170.000 $150.000 $150.000 $165.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,075.000 $200.000 $120.000 $150.000 $165.000
GABION MATTRESSES (GALV)(12 IN)
SY 241.000 $90.000 $180.000 $200.000 $150.000
GABION (1.5' X 3')(GALV)
CY 85.000 $300.000 $325.000 $280.000 $450.000
CONC BOX CULV (9FT X 4FT)
LF 85.000 $900.000 $1,150.000 $1,000.000 $1,400.000
SET (TY I)(S= 9 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $13,000.000 $12,500.000 $20,000.000 $15,000.000
SET (TY I)(S= 9 FT)(HW= 6 FT)(3:1) (C)
EA 6.000 $13,000.000 $13,500.000 $24,000.000 $15,000.000
SET (TY I)(S= 9 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $13,500.000 $15,500.000 $35,000.000 $18,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $15,000.000 $12,500.000 $30,000.000 $15,000.000
MOBILIZATION
LS 1.000 $83,000.000 $104,000.000 $95,000.000 $125,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,500.000 $3,200.000 $2,500.000 $2,500.000
ROCK FILTER DAMS (REMOVE)
LF 85.000 $12.000 $11.350 $1.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 520.000 $5.000 $3.800 $1.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 520.000 $1.500 $1.700 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 265.000 $6.000 $6.050 $8.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 265.000 $1.500 $1.300 $1.000 $1.000
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 85.000 $60.000 $48.100 $1.000 $50.000
WIRE FENCE (TY C)
LF 155.000 $30.000 $20.000 $20.000 $25.000
REMOVE SM RD SN SUP&AM
EA 2.000 $150.000 $100.000 $100.000 $500.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $115.000 $200.000 $80.000 $200.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $20.000 $100.000 $20.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $125.000 $200.000 $50.000 $200.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 5,120.000 $1.000 $2.100 $1.000 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 172.000 $2.000 $5.650 $5.000 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,370.000 $1.000 $2.150 $2.500 $2.500
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 810.000 $1.000 $3.250 $2.500 $3.500
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 935.000 $1.000 $3.250 $3.000 $3.500
REFL PAV MRKR TY II-A-A
EA 46.000 $10.000 $12.050 $20.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,305.000 $1.500 $0.550 $1.000 $1.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 240.000 $22.000 $16.000 $20.000 $25.000
TMA (STATIONARY)
DAY 28.000 $250.000 $375.000 $200.000 $200.000
TMA (MOBILE OPERATION)
HR 128.000 $70.000 $74.000 $50.000 $75.000
Totals: $1,059,302.300 $1,064,649.960 $1,210,014.000 $1,243,743.500