PREPARING ROW
|
STA
|
9.000
|
$1,000.000
|
$234,000.000
|
$12,158.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
44.000
|
$60.000
|
$77.000
|
$121.580
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
807.000
|
$200.000
|
$114.000
|
$512.930
|
|
|
REMOVING CONC (OTHER APPURTENANCES)
|
SY
|
900.000
|
$300.000
|
$27.000
|
$18.240
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,689.000
|
$15.000
|
$9.000
|
$12.160
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
1,377.000
|
$110.000
|
$10.000
|
$12.160
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
477.000
|
$13.000
|
$38.000
|
$30.400
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,173.000
|
$25.000
|
$47.000
|
$20.880
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,864.000
|
$25.000
|
$14.000
|
$30.400
|
|
|
BLADING
|
STA
|
229.000
|
$120.000
|
$144.000
|
$273.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
9.000
|
$200.000
|
$2,000.000
|
$851.090
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
8,000.000
|
$0.500
|
$0.950
|
$0.830
|
|
|
VEGETATIVE WATERING
|
MG
|
360.000
|
$90.000
|
$45.000
|
$91.190
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,854.000
|
$60.000
|
$108.000
|
$121.580
|
|
|
CEMENT
|
TON
|
226.000
|
$300.000
|
$252.000
|
$303.960
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
11,125.000
|
$8.000
|
$4.500
|
$30.400
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
14,988.000
|
$11.850
|
$4.500
|
$7.300
|
|
|
HMCL ACP TY-D AC-1.5
|
TON
|
1,175.000
|
$128.000
|
$185.000
|
$273.560
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,000.000
|
$110.000
|
$150.000
|
$182.380
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
137,714.000
|
$2.850
|
$2.000
|
$3.630
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
4,789.000
|
$160.000
|
$138.000
|
$164.140
|
|
|
CEM STABIL BKFL
|
CY
|
804.400
|
$205.000
|
$330.000
|
$182.380
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
320.000
|
$162.000
|
$180.000
|
$303.960
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,354.000
|
$295.000
|
$320.000
|
$371.120
|
|
|
CORE HOLE
|
EA
|
16.000
|
$200.000
|
$200.000
|
$283.600
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
260.500
|
$1,500.000
|
$3,100.000
|
$1,823.770
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
268.000
|
$1,800.000
|
$1,900.000
|
$1,732.580
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
103.800
|
$1,700.000
|
$2,200.000
|
$1,580.600
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
112.000
|
$900.000
|
$1,200.000
|
$820.690
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
57,293.000
|
$32.000
|
$38.000
|
$32.650
|
|
|
APPROACH SLAB (HPC)
|
CY
|
450.400
|
$1,030.000
|
$607.000
|
$957.480
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,092.500
|
$250.000
|
$375.000
|
$366.420
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
4,776.000
|
$275.000
|
$375.000
|
$291.121
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
2,510.000
|
$150.000
|
$212.330
|
$364.750
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
10,744.000
|
$150.000
|
$105.000
|
$126.450
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
7.000
|
$750.000
|
$1,300.000
|
$972.680
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
962.000
|
$90.000
|
$101.000
|
$173.740
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
800.000
|
$95.000
|
$109.000
|
$151.980
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
519.600
|
$216.000
|
$258.000
|
$205.170
|
|
|
INLET (COMPL)(PSL)(SL)(3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$13,100.000
|
$18,237.000
|
|
|
SET (TY I) (24 IN) (6: 1) (C)
|
EA
|
1.000
|
$4,800.000
|
$5,100.000
|
$6,079.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV)
|
LF
|
78.000
|
$1,300.000
|
$1,200.000
|
$1,823.770
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$100,000.000
|
$175,000.000
|
$151,980.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
8.000
|
$5,000.000
|
$6,500.000
|
$12,158.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,700,000.000
|
$2,400,000.000
|
$2,735,649.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$20,000.000
|
$30,352.000
|
$18,237.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
100.000
|
$45.000
|
$40.000
|
$37.620
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$15.000
|
$29.000
|
$10.030
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
390.000
|
$25.000
|
$43.600
|
$27.360
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
390.000
|
$12.000
|
$25.000
|
$9.120
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
40.000
|
$3.000
|
$30.000
|
$3.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
40.000
|
$1.000
|
$22.000
|
$0.910
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$9.000
|
$9.000
|
$5.470
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$2.000
|
$4.500
|
$1.080
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
10,320.000
|
$20.000
|
$15.000
|
$21.890
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
14,730.000
|
$15.000
|
$11.000
|
$12.190
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
11,610.000
|
$20.000
|
$11.000
|
$21.890
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
3,615.000
|
$200.000
|
$153.000
|
$151.980
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
49,513.000
|
$0.450
|
$0.170
|
$0.220
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
3,760.000
|
$0.580
|
$0.650
|
$0.870
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$36.000
|
$41.400
|
$48.630
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,000.000
|
$3,570.750
|
$4,194.660
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,905.000
|
$3.500
|
$2.070
|
$2.430
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
2.000
|
$5,000.000
|
$5,175.000
|
$4,255.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
2,689.000
|
$6.000
|
$7.520
|
$2.430
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$1,000.000
|
$776.250
|
$911.880
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$4,000.000
|
$3,622.500
|
$3,095.840
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$2,500.000
|
$2,587.500
|
$3,039.610
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,600.000
|
$8,900.000
|
$1,823.770
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
9.000
|
$10,000.000
|
$9,500.000
|
$8,510.910
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$900.000
|
$983.250
|
$1,155.050
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$100.000
|
$103.500
|
$121.580
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$30.000
|
$20.700
|
$91.190
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND(BI)
|
EA
|
4.000
|
$30.000
|
$77.630
|
$91.190
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$120.000
|
$77.630
|
$182.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
8,125.000
|
$0.750
|
$0.450
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
22,558.000
|
$0.600
|
$0.450
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,145.000
|
$0.600
|
$0.450
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,224.000
|
$1.800
|
$0.590
|
$1.370
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,347.000
|
$2.000
|
$0.860
|
$1.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,099.000
|
$1.000
|
$0.970
|
$1.180
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
300.000
|
$3.000
|
$2.750
|
$3.340
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,426.000
|
$3.850
|
$2.750
|
$3.340
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
9.000
|
$300.000
|
$125.000
|
$151.980
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
865.000
|
$1.750
|
$0.970
|
$1.180
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
865.000
|
$0.500
|
$0.550
|
$0.670
|
|
REFL PAV MRK TY II (W) 6" (DOT)
|
LF
|
359.000
|
$1.500
|
$0.550
|
$0.670
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
3,276.000
|
$0.650
|
$0.550
|
$0.670
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
95.000
|
$2.250
|
$1.650
|
$2.010
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
3,276.000
|
$0.600
|
$0.550
|
$0.670
|
|
REFL PAV MRK TY II (BLACK) 6"(SHADOW)
|
LF
|
865.000
|
$0.900
|
$0.560
|
$0.680
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,276.000
|
$0.750
|
$0.790
|
$0.960
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
28,874.000
|
$0.750
|
$0.790
|
$0.960
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
20,987.000
|
$0.750
|
$0.790
|
$0.960
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
8,200.000
|
$1.020
|
$1.250
|
$1.520
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,008.000
|
$5.000
|
$5.100
|
$6.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,100.000
|
$1.000
|
$0.570
|
$0.690
|
|
|
NO. OF WORKING DAYS
|
$/D
|
10,000.000
|
$265.000
|
$265.000
|
$265.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
8,388.000
|
$130.000
|
$105.000
|
$179.900
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
24,609.000
|
$162.000
|
$175.000
|
$248.550
|
|
|
BONDING COURSE
|
GAL
|
19,924.000
|
$4.500
|
$0.010
|
$7.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
536.000
|
$90.000
|
$34.000
|
$86.630
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$200.000
|
$92.000
|
$303.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
328.000
|
$75.000
|
$38.000
|
$121.000
|
|
Totals: |
$23,985,512.050
|
$27,631,400.760
|
$29,546,382.667
|